Fyrbeck and Cutler Roadway improvement IFB

expired opportunity(Expired)
From: Shrewsbury(Town)

Basic Details

started - 20 Mar, 2024 (1 month ago)

Start Date

20 Mar, 2024 (1 month ago)
due - 10 Apr, 2024 (18 days ago)

Due Date

10 Apr, 2024 (18 days ago)
Bid Notification

Type

Bid Notification

Identifier

N/A
Town of Shrewsbury

Customer / Agency

Town of Shrewsbury
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Bid Title:Fyrbeck and Cutler Roadway improvement IFB Category:Engineering & ConservationStatus:Open Description: Sealed bids or proposals will be received at the office of the Town Manager in The Richard D. Carney Municipal Office Building, 100 Maple Avenue, Shrewsbury, Massachusetts, for the replacement of approximately 1,200 linear feet of roadway replacement including new berms, wheel chair ramps, 1,400 linear feet of 12 inch and 15 inch drainage improvements including catch basins and drain manholes, and 1,400 linear feet 6 inch water main Publication Date/Time: 3/20/2024 8:00 AM Closing Date/Time: 4/10/2024 2:00 PM Addendum Date/Time: 04/07/2024 Contact Person: Todd Baldwin Senior Civil Engineer 508-841-8579 tbaldwin@shrewsburyma.gov Qualifications: All bids must meet the Commonwealth of Massachusetts Department of Public Works Standard Specifications for Highways, Bridges and Waterways (2020). All Contractors must be
pre-qualified through the Massachusetts Department of Transportation. Contractors may be pre-qualified at the Massachusetts Department of Public Works, Room 7552, 10 Park Plaza, Boston, Massachusetts 02116. Special Requirements: A proposal guarantee in an amount equal to five (5) percent of the bid amount in the form of cash, or bid bond, or certified check, or a treasurer's or cashier's check issued by a responsible banking institution payable to the Town of Shrewsbury shall be required with each bid and be enclosed with the proposal; this guarantee to become the property of the Town of Shrewsbury if the bidder fails to execute the contract and satisfactory bond within ten (10) days after the contract may have been awarded to them. The successful bidder will be required to furnish a 50 percent Performance Bond and a 100 percent Labor and Materials Bond.EMPLOYMENT AND WAGE REQUIREMENTS. Attention is called to minimum wage rates to be paid on the work as determined by the Division of Occupational Safety under the provisions of Mass. G.L.C. 149, section 26 to 27H inclusive. Contractor is to be aware of hiring preferences for veterans and residents and the requirement for worker’s compensation coverage. All such requirements are set forth in Massachusetts General Laws Chapter 149, Sections 26 to 37. The Contractor shall submit certified weekly payrolls in a form suitable to the Town and the Office of the Attorney General pursuant to an advisory dated April 8, 1994 from the Office of the Attorney General, a copy of which may be obtained in the Office of the Town Manager acting as Chief Procurement Officer of the Town of Shrewsbury.The Contractor shall furnish labor in harmony with all other elements of labor employed in the work and that all employees employed on the worksite, or in the work subject to this bid, must successfully have completed at least ten hours of Occupational Safety and Health Administration (OSHA) approved training (Chapter 306 of the acts of 2004). Along with certificate of insurance, evidence of OSHA training certificate is also required to be submitted at that time as well as with the first certified payroll.All bids for this project are subject to the provisions of Mass. G.L. (Ter. Ed.) C 30, Section 39M (a), as amended.Bidders on this work will be required to comply with the President's Executive Order No. 11246 (Affirmative Action to Ensure Equal Employment Opportunity) and any amendments or supplements thereto.Bidders on this work will be required to comply with the rules and regulations of the Architectural Access Board (521 CMR 1.00 et. Seq.) Price adjustments in accordance with MassDOT provisions shall apply to Liquid Asphalt, Diesel Fuel & Gasoline, Portland Cement & Steel. Current prices are posted monthly on the MassDOT website at https://www.mass.gov/info-details/massdot-current-contract-price-adjustments. Miscellaneous: The Town reserves the right to reject any or all proposals, and waive informalities in the bidding procedure, or to accept the proposal deemed best for the Town. The bidder shall start the work under this contract within seven (7) calendar days after its acceptance by the Town Manager. Related Documents: View Document(s) Return To Main Bid Postings Page

The Town of Shrewsbury, 100 Maple Avenue, Shrewsbury, MA 01545Location

Address: The Town of Shrewsbury, 100 Maple Avenue, Shrewsbury, MA 01545

Country : United StatesState : Massachusetts

You may also like

Lift Station Improvements

Due: 07 May, 2024 (in 8 days)Agency: City Of Bellmead

Concession Building Improvements

Due: 15 May, 2024 (in 16 days)Agency: City of Buffalo

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.

Classification

Engineering & Conservation