RFP FOR CONCOURSE A RAMP EXPANSION – PHASE 1: SITE PREPARATION CIP 2019B

expired opportunity(Expired)
From: The Metropolitan Nashville Airport Authority(Airport)

Basic Details

started - 25 Jun, 2021 (about 2 years ago)

Start Date

25 Jun, 2021 (about 2 years ago)
due - 15 Sep, 2021 (about 2 years ago)

Due Date

15 Sep, 2021 (about 2 years ago)
Bid Notification

Type

Bid Notification

Identifier

N/A
The Metropolitan Nashville Airport Authorit

Customer / Agency

The Metropolitan Nashville Airport Authorit
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

RFP FOR CONCOURSE A RAMP EXPANSION – PHASE 1: SITE PREPARATION CIP 2019B



ADVERTISEMENT FOR REQUEST FOR PROPOSAL
METROPOLITAN NASHVILLE AIRPORT AUTHORITY
NASHVILLE, TENNESSEE
CONCOURSE A RAMP EXPANSION – PHASE 1: SITE PREPARATION
PROJECT NO. 2019B
 
ELECTRONIC PROPOSALS for furnishing all materials, labor, tools and appurtenances for completion of the design and the construction of the
CONCOURSE A RAMP EXPANSION – PHASE 1: SITE PREPARATIONand other incidental items shall be received by the Metropolitan Nashville Airport Authority, (MNAA) Nashville, Tennessee, until and not later than
12:00p.m. (local time) on September 15, 2021.  Proposers wishing to submit a non-electronic proposal may do so only after receiving written authorization from MNAA.  Written authorization to submit a non-electronic proposal may be requested by emailing
purchasing@flynashville.comat least five (5)
days prior to the date proposals are due.  Proposers submitting a non-electronic proposal must submit a copy of the written authorization with their proposal package.
 
THE PROJECT consists of completing the Design and Construction Documents; furnishing all labor, materials, tools, equipment and incidentals; and performing all Work necessary for the installation of the
CONCOURSE A RAMP EXPANSION – PHASE 1: SITE PREPARATIONin accordance with the details as shown on this Request For Proposal (RFP), or as directed by MNAA or its authorized representative.  Proposers must be in good standing with the State of Tennessee and be qualified to meet all Local, State and Federal statutes, codes, regulations and ordinances governing the performance of the type of Work for which Proposer is submitting a Proposal.
 
CONCOURSE A RAMP EXPANSION – PHASE 1: SITE PREPARATIONwill commence in October 2021 with completion within the specified number of calendar days.
 
SCOPE.  The Project consists of site preparation and earthwork to fill a large land depression adjacent to the existing terminal apron to ultimately be utilized as additional ramp for aircraft parking and maneuvering. The project scope also includes clearing and grubbing, removal of unsuitable materials, relocation of existing utilities, and encapsulation of an unnamed tributary stream. Fill for the project will include a significant portion of processed and/or sorted materials stockpiled on Airport property.
 
THE RFP DOCUMENTS. Copies of the Contract Documents (RFP, Proposal Schedule, Attachments, etc.) will be available on or after July 12, 2021 and may be obtained electronically from
www.aerobidz.aero, an online tendering service. The requestor shall pay the cost of the document printing. 
Free registration with Aerobidz is available by contacting https://www.flynashville.com/business-opportunities/Pages/Aerobidz-Registration.aspx.
 
Proposers are advised to review the RFP Documents carefully prior to submitting a Proposal on the Project.  Proposers are also advised to review the RFP and Instructions to Proposers carefully prior to preparing their Proposals.
 
Proposals must be submitted on the Proposal Form included in the RFP Documents and the successful Proposer will be required to execute the Contract and other documents requiring execution that are included in the Contract Documents.
 
CONTRACTORS LICENSING ACT OF 1994. All Proposers must be licensed contractors as required by the Contractors Licensing Act of 1994, TCA Section 62-6-101 et seq.  The name, license number, expiration date thereof, and license classification of the contractors applying to propose for the prime contract and for the masonry project when the total cost of the masonry portion of the project exceeds one hundred thousand dollars ($100,000, and for the electrical, plumbing, heating, ventilation, air conditioning contracts, and closed loop geo-thermal heating and cooling, must appear on the
outside of the envelopecontaining the proposal except when the proposal is in an amount less than twenty-five thousand ($25,000).  Prime contractor proposers who are to perform the electrical, plumbing, heating, ventilation, air conditioning, masonry, and geo-thermal must be so designated upon the
outside of the envelope.  Failure of any proposer to comply therewith may void such proposal and the envelope containing such proposal may not be opened or considered.
Further, MNAA has determined that, if the Proposer proposes to accomplish any or all of the Work under this Project which entails masonry work exceeding $100,000, and electrical, plumbing, heating, ventilation, air conditioning, and geo-thermal equal to or exceeding $25,000 in value through the utilization of Subcontractors or to accomplish with Subcontractors any other part of the Work for which the Proposer does not hold a valid Tennessee Contractor’s License, then those Subcontractors must, at the time the Proposal is submitted to MNAA, hold a valid Tennessee Contractor’s License, current and in full force and effect in all respects, in such of the following classifications and sub-classifications as apply to the Work for which they will be subcontracted.
Proposals shall be submitted for the Work as indicated in the RFP.  Specifically, in referring to the Contractors Licensing Act and other applicable authorities, MNAA has determined that to lawfully propose on this Project, all Proposers and/or their subcontractors must, at the time their Proposal is submitted to MNAA, hold a valid Tennessee Contractor’s license, current and in full force and effect in all respects, to perform the Work as defined in the RFP.
All Proposers are advised that the Contractors Licensing Act establishes only the minimum licensing requirements and that MNAA reserves the right in its sole discretion to require higher licensing standards, as reflected in the Contract Documents.  All Proposers are responsible for complying with any other licensing or permit requirements of the State of Tennessee and/or the Metropolitan Government of Nashville and Davidson County, which may be applicable to the Work.
 
PRE-PROPOSAL CONFERENCE.  A Pre-Proposal Conference will be conducted at 1:00
p.m. (local time), July 22, 2021,  1370 Murfreesboro Pike, Building #1, Nashville, Tennessee 37217 as well as a
virtual option via Microsoft Teams.  If you wish to join this meeting via Microsoft Teams, please send an email to
nena.bowling@flynashville.comin order to receive a calendar invite.  Attendance at this meeting is not mandatory.   A one-time tour of the project site will be conducted after the meeting.
 
SMALL MINORITY WOMAN-owned BUSINESS ENTERPRISE (SWMBE) PARTICIPATION. It is the MNAA’s objective to promote, encourage, and stimulate participation of local, small, minority and woman-owned business enterprises (SMWBE) within its organization and the economic community served by it so as to provide maximum opportunities to participate in contracts, programs and all related business activities of the MNAA. MNAA will apply the local small minority woman business participation levels where expenditures and purchases are made with non-federal funding, and to all contracts, leases, management agreements, consultants, prime contractors, subcontractors, respondents, proposers, or proposers involved in the performance of a commercially useful task for MNAA.
 
Proposers are encouraged to meet SMWBE participation levels established by the Director, Business Diversity Development, or, if unable to meet the participation level, engage in good faith efforts to joint venture, subcontract, or contract for supplies or services with SMWBEs. The attainment of the SMWBE participation level established for this contract is to be measured as a percentage of the total dollar value of the contract. The SMWBE participation level established for this Contract will be
7.38% MBE and 3.05% WBE. This program maintains a list of certified SMWBEs, which can be found on the Authority’s website at
https://flynashville.com/nashville-airport-authority/business-opportunities/business-diversity-developmentor certified DBEs located within the state of Tennessee, which can be found on the TNUCP Directory (TDOT) website at
https://www.tdot.tn.gov/Applications/DBEDirect/Searchor contacting Business Diversity Development at (615) 275-2718. Proposers are encouraged to inspect this list to assist in locating SMWBEs for the work. Other SMWBEs may be added to the list in accordance with MNAA’s approved SMWBE Program. Credit toward the SMWBE participation will not be counted unless the SMWBE to be used is certified by MNAA.
 
RIGHT TO REJECT ANY AND ALL PROPOSALS.  MNAA proposes to award the Contract to the lowest responsive and responsible Proposer, provided it has met the goals for SMWBE participation or, if failing to meet the goals, has made an acceptable good faith effort to meet the established goals for the SMWBE participation.  Proposer is advised that MNAA reserves the right to reject any and all Proposals submitted, to waive any and all informalities, irregularities and/or technicalities in any Proposal or Proposal Guaranty, to accept any Proposal deemed advantageous to it and to negotiate changes, deletions, or additions to these Contract Documents with the successful Proposer.

140 BNA Park Drive Suite 520 Nashville, TN 37214Location

Address: 140 BNA Park Drive Suite 520 Nashville, TN 37214

Country : United StatesState : Tennessee

You may also like

Allenspark Transfer Site Expansion Earthwork

Due: 08 May, 2024 (in 18 days)Agency: Public Works

Playfields Park Accessibility Improvements, CIP No. ET0003

Due: 08 May, 2024 (in 18 days)Agency: Public Works Engineering and Transportation

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.