PRE-SOLICITATION NOTICE: This is NOT a request for proposal or invitation for bid.The executed work under this project consists of providing labor, equipment, and materials needed to remove the existing United States Air Force (USAF) Logo, accomplish corrosion control repairs to area where logo was removed, spray coat the upper portion (above the existing walkway) of the existing water tower using inorganic zinc paint, test the existing surface after paint has been applied, and affix the new United States Space Force (USSF) Logo. The work under this project also includes testing the existing cathodic protection system for proper functionality. The performed work is on the upper portion of the existing water tower (above the existing walkway) only. All work must conform to the Specifications and