Solar Implementation at Chollas Bldgs A & B and Solar Implementation at ETDC

expired opportunity(Expired)
From: San Diego(City)
K-23-2109-DB1-3

Basic Details

started - 05 Oct, 2022 (19 months ago)

Start Date

05 Oct, 2022 (19 months ago)
due - 17 Nov, 2022 (17 months ago)

Due Date

17 Nov, 2022 (17 months ago)
Bid Notification

Type

Bid Notification
K-23-2109-DB1-3

Identifier

K-23-2109-DB1-3
Purchasing & Contracting, Public Works

Customer / Agency

Purchasing & Contracting, Public Works
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Project Title Solar Implementation at Chollas Bldgs A & B and Solar Implementation at ETDC Invitation # K-23-2109-DB1-3 Bid Posting Date 10/05/2022 9:09 AM (PST) Project Stage Bidding Bid Due Date 11/17/2022 2:00 PM (PST) Response Format Electronic Project Type RFP (Request for Proposal) Response Types Cost File Response File DESIGN-BUILDER’S GENERAL INFORMATION (required) DESIGN-BID PROPOSAL (required) SUBS, SUPPLIERS AND MANUF.- DEBARMENT AND SUSPENSION CERTIFICATION (required) PRIME - DEBARMENT AND SUSPENSION CERTIFICATION (required) CONTRACTOR’S CERTIFICATION OF PENDING ACTIONS B. MANDATORY DISCLOSURE OF BUSINESS INTERESTS FORM (required) MANDATORY DISCLOSURE OF BUSINESS INTERESTS FORM (required) Type of Award Lump Sum Categories 91200 - Construction Services, General (Incl. Maintenance And Repair Services) 91400 - Construction Services, Trade (New Construction) 236220 - Commercial and Institutional Building Construction 237310 - Highway, Street, and Bridge Construction 238210 -
Electrical Contractors and Other Wiring Installation Contractors 541330 - Engineering Services 541370 - Surveying & Mapping (except geophysical) Services 524126 - Direct Property and Casualty Insurance Carriers License Requirements A and C-10 or C-46 Department Purchasing & Contracting, Public Works Address 1200 Third Ave Suite 200 San Diego, California County San Diego Bid Valid 120 Calendar Days Liquidated Damages $1,000 Per Day Estimated Bid Value $2,425,000.00 Start/Delivery Date Project Duration 264 Working Days Pre-Bid Meeting Information Pre-Bid Meeting Yes - Mandatory Pre-Bid Meeting Date 10/20/2022 1:00 PM (PST) Pre-Bid Meeting Location CHOLLAS BLDGS A & B, at 2797 Caminito Chollas, San Diego, CA, 92105 (Please see Appendix E Location Map) And then ETDC at 5510 Kiowa Dr.,San Diego, CA, 92120 (Please see Appendix F Location Map) Online Q&A Online Q&A No Contact Information Contact Info Juan E. Espindola 619-533-4491 jeespindola@sandiego.gov Bids to Juan E. Espindola Owner's Agent Description Scope of Services 2.1 The Design-Builder shall perform commissioning of the renewable energy systems and meters/submeters for both the ETDC and Chollas sites. 2.2 The Design-Builder shall provide and install a complete solar photovoltaic system for Chollas Buildings A & B. The solar photovoltaic system will provide energy to the two Chollas Buildings. The Design-Builder shall provide all design, permits, materials for construction/installation, utility coordination, and testing and commissioning of approximately 236 kW of solar power systems total (Approximately 105 kW for Building A and 131 kW for Building B), or system that produces maximum output possible based on the available space. The system will include rooftop mounted solar systems. 2.3 The Design-Builder shall provide and install a complete solar photovoltaic system for the Employment Training Development Center (ETDC) parking lot and interconnect to ETDC building. The solar photovoltaic system will provide energy to the ETDC building. The Design-Builder shall provide all design, permits, materials for construction/installation, utility coordination, and testing and commissioning of approximately 190 kW of solar power systems total, or system that produces maximum output possible based on the available space. The system will include rack/canopy mounted systems (parking lot). 2.4 The Design-Builder shall design and construct each site to obtain the highest kilowatthour (kWh) output at the lowest cost and be installed as necessary to accommodate the individual aesthetics and requirements based on building characteristics, location, and ease of access. All solar power generating equipment, inverters, and metering must meet the manufacturer’s equipment installation and warranty requirements. 2.5 The Design-Builder shall assist the City in the preparation and submittal of Net Energy Metering (NEM) Interconnection Application and Agreement for the solar photovoltaic systems, in accordance with Rule 21 from local electric utility service company. All equipment required for SDG&E interconnection including meters should be the Design-Builder’s responsibility. 2.6 The Design-Builder shall evaluate and provide recommendation on the final system size based on available data and facility need. 2.7 The Design-Builder shall incorporate the accessibility requirements in the design where applicable. For the Preliminary Accessibility Evaluation report, please refer to Attachment CC. It is the Design-Builder’s responsibility to ensure that the project design complies with current accessibility codes and regulations. 2.8 The Design-Builder shall incorporate environmental requirements in both the design and construction where applicable. For the Preliminary Environmental Assessment report, please refer to Attachment DD for Chollas Buildings A and B and Attachment EE for ETDC Building. Other Details Notes Special Notices Local Programs & Policies Place eBid

1200 Third Ave Suite 200 San Diego, CaliforniaLocation

Address: 1200 Third Ave Suite 200 San Diego, California

Country : United StatesState : California

You may also like

Solar Tracker Installation

Due: 03 May, 2024 (Tomorrow)Agency: Fox Valley Technical College

60 FOLDABLE SOLAR PANELS FOR RADIO CACHE SUPPORT

Due: 18 Sep, 2024 (in 4 months)Agency: FOREST SERVICE