Rowan-Cabarrus Community College SOUTH CAMPUS ROOM RENOVATIONS

expired opportunity(Expired)
From: North Carolina Rowan Cabarrus Community College(Higher Education)
121-062121MR

Basic Details

started - 21 Jun, 2021 (about 2 years ago)

Start Date

21 Jun, 2021 (about 2 years ago)
due - 07 Jul, 2021 (about 2 years ago)

Due Date

07 Jul, 2021 (about 2 years ago)
Bid Notification

Type

Bid Notification
121-062121MR

Identifier

121-062121MR
Rowan-Cabarrus Community College

Customer / Agency

Rowan-Cabarrus Community College
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

IFB # 121-062121MR Rowan-Cabarrus Community College SOUTH CAMPUS ROOM RENOVATIONS 1531 Trinity Church Rd. Concord, NC INVITATION TO BID NOTICE TO BID Sealed bids for construction of the Rowan-Cabarrus Community College, South Campus Room Renovations will be received via email until, but no later than 2:00 pm, local prevailing time, July 07, 2021, and then publicly opened and read immediately thereafter via ZOOM. Bidders are encouraged to view the bid opening in real time via a ZOOM link that will be provided in an addendum. Bidders shall be licensed contractors in North Carolina HUB certified contractors are encouraged to submit a bid for this project. Bids received after the announced time and date for submittal will be rejected. Bidders are responsible for ensuring their Bid is received before the deadline indicated. Bids shall be submitted, by email in PDF format to Ronda Holland at ronda.holland@rccc.edu Bidders will
receive an email receipt notification that their bids have been received. The Scope of Work is stated on page 2 of this Invitation to Bid. All work and materials shall be included in the bid. A Mandatory pre-bid conference will be held at 10:00 am on June 25, 2021. The meeting will be held at the College South Campus meeting in the main Courtyard between the Buildings at 1531 Trinity Church Rd., Concord, North Carolina. Facemasks and social distancing are required in all Rowan-Cabarrus Community College buildings. Limit one (1) representative per bidder. The laws of North Carolina and applicable regulations of licensing boards will be observed in receiving bids and awarding the contract. Rowan-Cabarrus Community College reserves the right to reject any or all proposals and to waive informalities. Page 1 of 4 mailto:ronda.holland@rccc.edu Rowan-Cabarrus Community College SOUTH CAMPUS ROOM RENOVATIONS SCOPE OF WORK BUILDING 3000 1. ROOM 3114 - REMOVE MAILBOXES AND COUNTER, dispose of counter, locate mailboxes in 1000 building room 303, paint mailboxes to match 1000 colors 2. PATCH AND PAINT ALL WALLS, Install new base molding 3. Install isolated ground electrical receptacles & data in boxes already in south wall NOTES: ROOM 3120 - WILL BECOME EQUIPMENT STORAGE, PAINT ALL WALLS, Install new base molding BUILDING 2000 1. ROOMS 2319 & 2322 – Remove floor tiles and Install new carpet, PATCH ANY HOLES ON THE FLOOR before carpeting 2. PAINT ALL WALLS including trim, Install new base molding 3. INSTALL CHAIR RAILS 4. REPLACE CEILING TILES AND GRIDS WITH 24”X24” TEGULAR EDGE TILES, move sprinkler heads as needed NOTE: The College will arrange contractor to move furniture and other items out of building BUILDING 1000 1. Room 303 - REMOVE ONE SECTION OF CABINETS AND CUT COUNTER FOR WALL INSTALLATION 2. Support counter and match vinyl cap on exposed counter end, leave tall cabinet in corner 3. ADD WALL TO EXTEND 6" PAST CEILING GRID 4. ADD 2 RETURN REGISTERS in ceiling 5. ADD SUPPLY DIFFUSER in ceiling 6. ADD NEW LIGHT SWITCH FOR NEW SPACE 7. ADD FIRE PROTECTION STROBE 8. Install new base molding on both sides new wall 9. INSTALL MAILBOXES 10. Add Electrical & Data outlets to both sides of new wall PRODUCT CODES & PART NUMBERS CEILING TILES: Armstrong Cortega Tegular GR2195 CARPET: Shaw- Think 5T186- color 86760 Achieve 24” X 24” WALL PAINT: ProMar 200 eggshell- Relaxed Khaki TRIM PAINT: Sherwin Williams B53 T 1154- Order number 0136939 dark gray color match BASE COVE MOLDING: Flexco Black / Brown CF40CB2P071- B2-071 4X120X1/8 WALL GUARDS (CHAIR RAIL) FROM GRAINGER: a) 43Z495 guard b) 43Z895 right end cap c) 31NJ05 left end cap IFB #121-062121MR Page 2 of 4 (OPEN TO BELOW) (OPEN TO BELOW) CLASSROOM 2314 993 SF CLASSROOM 2315 883 SF OFFICE 2303 203 SF CLASSROOM 2304 481 SF CLASSROOM 2305 720 SF CLASSROOM 2306 636 SF STAIRS 2344 213 SF STAIRS 2343 210 SF CORRIDOR 2310 223 SF OFFICE 2310A 124 SF OFFICE 2310B 102 SF OFFICE 2310C 101 SF OFFICE 2310D 88 SF OFFICE 2310E 93 SF DATA 2316 41 SF DATA 2316A 132 SF CLASSROOM 2318 882 SF OPEN OFFICE 2319 1030 SF STORAGE 2319A 256 SF OFFICE 2320 101 SF STORAGE 2321 64 SF OPEN 2322 886 SF OFFICE 2324 111 SF CLASSROOM 2327 589 SF CLASSROOM 2328 600 SF CORRIDOR 2331 1014 SF CORRIDOR 2332 881 SF ELEV 2399 48 SF WOMEN 2391 193 SF MEN 2390 194 SF ELEC 2331A 48 SF OFFICE ROOMS 2319 & 2322 - REMOVE EXISTING TILE FLOOR, PATCH ANY HOLES ON THE FLOOR. INSTALL NEW CARPET AND PAINT ALL WALLS. NOTES: 1 5 2 1 T R I N I T Y C H U R C H R D . B U I L D I N G 2 0 0 0 - 3 r d F L O O R C O N C O R D , N C S O U T H C A M P U S PROJECT: DRAWN: DATE: REVISION DESCRIPTION: PAGE OF JUNE 1, 2021 D. DAVIDSON ROOM REMODEL 1 BUILDING 2000 3RD FLOOR 13,903 GSF F101 FACILITY PLANNING 1333 JAKE ALEXANDER BLVD. SALISBURY, NC 28145 704.216.7222 WWW.RCCC.EDU COLLEGE ENVIRONMENT 1 ENTRANCE 3140 CALL CENTER 3114 STORAGE 3114A STORAGE 3115 DATA 3118 STORAGE 3120 CORR 3136 CAPGCCAPDHCAPQTCAPMCCAPMGCAPPN REMOVE MAIL BOXES HELP DESK CALL CENTER 824 SF 251 SF EQUIPMENT ROOM 3114 - REMOVE MAILBOXES AND COUNTER. PATCH AND PAINT ALL WALLS. NOTES: ROOM 3120 - WILL BECOME EQUIPMENT STORAGE. PAINT ALL WALLS. 1 5 2 1 T R I N I T Y C H U R C H R D . B L D G 3 0 0 0 - H E L P D E S K PROJECT: DRAWN: DATE: REVISION DESCRIPTION: PAGE OF JUNE 1, 2021 D. DAVIDSON HELP DESK 1 C O N C O R D , N C S O U T H C A M P U S BLDG 3000 - HELP DESK/CALL CENTER SCALE: 1/8" = 1'-0" CS FACILITY PLANNING 1333 JAKE ALEXANDER BLVD. SALISBURY, NC 28145 704.216.7222 WWW.RCCC.EDU COLLEGE ENVIRONMENT 1 CALL CENTER AutoCAD SHX Text EQUIPMENT AutoCAD SHX Text EQUIPMENT AutoCAD SHX Text EQUIPMENT AutoCAD SHX Text SHELVING AutoCAD SHX Text DESK AutoCAD SHX Text DESK AutoCAD SHX Text DESK AutoCAD SHX Text DESK AutoCAD SHX Text MAIL BOXES

2 W Edenton St, Raleigh, NC 27601, USALocation

Address: 2 W Edenton St, Raleigh, NC 27601, USA

Country : United StatesState : North Carolina

You may also like

Replace Server Room Air Conditioning Systems at Blue Ridge Community College, PC#M23BR172

Due: 02 May, 2024 (in 4 days)Agency: Virginia Community College System - System Office

Replace Server Room Air Conditioning Systems at Blue Ridge Community College, PC#M23BR172

Due: 02 May, 2024 (in 4 days)Agency: Virginia Community College System - System Office

Washroom Renovations at Kingston Campus

Due: 17 May, 2024 (in 19 days)Agency: St. Lawrence College

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.