Big Smoky Hybrid Electrical System Upgrade and Building Foundation Improvements

From: Federal Government(Federal)
1240LT24R0040

Basic Details

started - 29 Apr, 2024 (1 day ago)

Start Date

29 Apr, 2024 (1 day ago)
due - 31 May, 2024 (in 1 month)

Due Date

31 May, 2024 (in 1 month)
Bid Notification

Type

Bid Notification
1240LT24R0040

Identifier

1240LT24R0040
AGRICULTURE, DEPARTMENT OF

Customer / Agency

AGRICULTURE, DEPARTMENT OF (29676)FOREST SERVICE (14144)Sawtooth National Forest (15)
[object Object]

SetAside

SBA(Total Small Business Set-Aside (FAR 19.5))

Attachments (6)

unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

SCOPE OF CONTRACTBase Bid: This work includes the installation of a prime rated, standalone generator backing up a DC solar array with battery storage and inversion to a 240/120 Vac distribution system.The work includes:Removal and salvage of an existing generator from the distribution system and an unused solar array (no electrical connections, salvaged for use at the Big Smoky Guard Station - South Site).Site work for the providing and installing a new generator pad and new generator with associated feeders and controls.Providing and installing pole mounted arrays with associated feeder.Providing, installing and fully setting up a Flexware system with batteries and all other appurtenances for an operational system.Option Item #1: This work consists of installing two permanent concrete foundations for an existing building (north building) with an outside measurement of 32 x 18 feet and another building (south building) with an outside measurement of 28 x 18 feet. The work will
include raising, temporarily shifting, and then resetting each building onto newly constructed concrete foundations. Additional work includes hauling the excavated material from the crawl space to a designated site located approximately 3 miles from the work site, disassembling and then reconnecting the electrical, gas, water, and sewer utilities, and upon completion of all said work backfilling and dressing up around each structure.Option Item #2: This work includes the installation of a prime rated, standalone generator backing up a DC solar array with battery storage and inversion to a 240/120 Vac distribution system.The work includes:Removal and disposal of an existing generator from the distribution system.Site work for the providing and installing a new generator pad and new generator with associated feeders and controls.Providing and installing pole mounted array using the salvaged modules of the existing array with associated feeder and future expansion capability.Providing, installing and fully setting up a Flexware system with batteries and all other appurtenances for an operational system.

Location

Place Of Performance : N/A

Country : United StatesState : Idaho

Office Address : SAWTOOTH SUPERVISORS OFFICE 370 AMERICAN AVE JEROME , ID 83338 USA

Country : United StatesState : IDCity : JEROME

You may also like

Big Smoky Hybrid Electrical System Upgrade and Building Foundation Improvements

Due: 31 May, 2024 (in 1 month)Agency: AGRICULTURE, DEPARTMENT OF

Classification

naicsCode 236210Industrial Building Construction