Title: Design Build - Fire Station 1 Roof Replacement - (design, construction, oversight) ARPA Deadline: 9/5/2023 4:00 PM (UTC-05:00) Eastern Time (US & Canada) Status: Open Quote Number: 2023-62 Description: Design Build - Fire Station 1 Roof Replacement - (design, construction, oversight) ARPAThe City of Canton, Ohio (the Owner or the City) wishes to use the services of a company experienced with the design-build delivery model for its proposed Fire Station 1 Roof Replacement - (design, construction, oversight) ARPA Project (the Project). As required by Ohio Revised Code Sections 153.65 et seq., the Owner requests statements of qualifications (SOQs) from Design-Build firms (DBs) to provide Design-Build services for the Project. This Request for Qualifications (RFQ) includes criteria that will be used to evaluate the submitted qualifications to develop the short-list of firms. In the second phase of the selection process, a Request for Proposals will be issued to the short-listed
firms. The short-listed firms will be asked to provide both pricing and technical proposals, which will be reviewed and evaluated to determine the Design-Build firm that will provide the best value to the Owner for the Project. The short-listed firms may also be asked to provide a proposal bond, guaranteeing their willingness to execute the contract form provided with the Request for Proposals. Problem Occurred × Please retry Ok Confirmation × Are you sure you want to remove line item? Yes No Missing Information × Ok Confirmation × Are you sure you want to remove attachment? Yes No Documents: Documents as of 8/11/2023 RFQ.pdf All Additions Questions Addition 1 Posted: 8/25/2023 Type of Addition: Addendum 1 Due Date Extended Overview: Addendum 1 Due Date Extended Deadline: 9/4/2023 4:00 PM Addition 2 Posted: 8/28/2023 Type of Addition: Addendum 2 Time Extension Overview: Addendum 2 Time Extension Deadline: 9/5/2023 4:00 PM Question 1 Posted: 8/18/2023 Question: Are you simply needing a re roof at a fire station or are you looking to do a new construction project? Response: This is a re-roof. I believe it is rubber, not shingles. Posted: 8/25/2023 Type of Addition: Addendum 1 Due Date Extended Overview: Addendum 1 Due Date Extended Deadline: 9/4/2023 4:00 PM Posted: 8/28/2023 Type of Addition: Addendum 2 Time Extension Overview: Addendum 2 Time Extension Deadline: 9/5/2023 4:00 PM Posted: 8/18/2023 Question: Are you simply needing a re roof at a fire station or are you looking to do a new construction project? Response: This is a re-roof. I believe it is rubber, not shingles.