Amendment 0007 - THIS SOLICITATION IS HEREBY CANCELED IN ITS ENTIRETY***********************************************************Amendment 0006 - The purpose of this amendment is to:1. Extend the Bid Opening date from 25 August 2022 to 14 Ocotber 2022***************************************************************Amendment 0005 - The purpose of this amendment is to:1. Extend the Bid Opening date from 11 August 2022 to 25 August 2022.2. Provide an updated Wage Determination dated 8/5/2022.******************************************************************Amendment 0004 - The prupose of this amendment is to:1. Provide Drawing S-502 - Foundation Sections and Details2. Provide Revised Drawing _A-410 Revision 8-2-22********************************************************************Amendment 0003 - The purpose of this amednment is to: 1. Provide Geotech Borings**********************************************************************Amendment 0002 - The purpose of this amendment is to: 1. Extend
the bid opneing date to 11 August 2022.***********************************************************************Amendment 0001 - The purpose of this amendment is to:1. Provide responses to Requests for Information (RFIs)2. Provide Furniture Specifications 12 59 00 and Spec 12 50 00.13 10 (RFI # 9811382)***************************************************************************Site Visit Sign-in log has been added.****************************************************************************Project Title: Defense Logisitics Agency (DLA) Site Improvements, Fort Meade, Maryland.There are significant site improvements proposed for the Defense Logistics Agency (DLA) facility, Fort Meade, MD. These site improvements include the construction of retaining walls to expand the existing west storage driveway ramp for truck turning radius and the existing western parking lot to add roll-off docks, the addition of a pre-engineered storage shed and highway trailer scales, radiation monitors, the construction of covered loading docks at building 77, the installation of a buried oil/water tank separator, replacement of the entrance and exits gates, rehabilitation of existing pavements and construction of new pavements for truck staging, correct site drainage, and provide maintenance and redevelopment of stormwater management (SWM) facilities.