Fire Extinguishers Inspection and Maintenance (RFP)

expired opportunity(Expired)
From: Raleigh(City)
274-ES-FO-2019FireExtinguisher

Basic Details

started - 13 Apr, 2020 (about 4 years ago)

Start Date

13 Apr, 2020 (about 4 years ago)
due - 29 Apr, 2020 (about 4 years ago)

Due Date

29 Apr, 2020 (about 4 years ago)
Bid Notification

Type

Bid Notification
274-ES-FO-2019FireExtinguisher

Identifier

274-ES-FO-2019FireExtinguisher
City of Raleigh

Customer / Agency

City of Raleigh
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

1 Request for Proposals # 274-ES-FO-2020-Fire Extinguisher Inspection and Maintenance Title: Fire Extinguishers Inspection and Maintenance Issue Date: April 13th, 2020 Due Date: April 29th, 2020 not later than 2:00 PM ET LATE PROPOSALS WILL NOT BE ACCEPTED Issuing Department: Engineering Services, Facilities and Operations Direct all inquiries concerning this RFP to: Steve Chelini Facilities and Operations Supervisor Email: Steven.Chelini@raleighnc.gov 2 Table of Contents 1. Introduction ...............................................................................................3 1.1 Purpose ..............................................................................................3 1.2 Background ........................................................................................3 1.3 RFP Timeline ......................................................................................4 1.4 Pre-Proposal
Conference ...................................................................4 1.5 Proposal Question ..............................................................................5 1.6 Proposal Submission Requirements & Contact Information ...............5 1.7 Rights to Submitted Material ..............................................................6 1.8 Communications .................................................................................6 1.9 Lobbying .............................................................................................7 1.10 Conflicts of Interest .............................................................................7 1.11 Proposer Expenses ............................................................................8 1.12 Proposer Acceptance .........................................................................8 2. Proposals ..................................................................................................9 2.1 Request for Proposals Required Document Format ...........................9 2.2 RFP Documents ............................................................................... 11 3. Proposal Evaluation ............................................................................... 11 3.1 Proposal Evaluation Criteria (Stage 1) ............................................. 11 3.2 Interview/Demonstration (Stage 2) ................................................... 12 3.3 Final Selection .................................................................................. 12 3.4 Notice to Proposers Regarding RFP Terms & Conditions ................ 13 4. Contract Terms ....................................................................................... 13 5. Scope of Services ................................................................................... 13 Appendix I – Proposal Cost Form .................................................................... 14 Appendix II – Proposer Questionnaire ............................................................ 15 Appendix III – Reference Questionnaire .......................................................... 16 Appendix IV – Contract Standard Terms & Conditions ................................. 19 Appendix V – Exceptions to RFP ..................................................................... 27 3 1 Introduction 1.1 Purpose The City of Raleigh (COR) is solicitating proposals from one or more firm(s) with which to contract for the following services: Fire Extinguisher Inspections and Maintenance A detailed scope of services is provided in Section 5 of this solicitation. All information related to this solicitation, including any addenda, will be posted to the North Carolina Interactive Purchasing System (IPS) at: https://www.ips.state.nc.us/IPS/. 1.2 Background The City of Raleigh, the Capital City of North Carolina, remains one of the fastest growing areas in the country. A great economy, top educational institutions, and exceptional health care facilities are some of the characteristics that attract people to the triangle area. The mild climate, diverse work force and proximity to Research Triangle Park combine to make Raleigh a great place to live. Raleigh is a 21st Century City of Innovation focusing on environmental, cultural, and economic sustainability. The City conserves and protects our environmental resources through best practice and cutting-edge conservation and stewardship, land use, infrastructure and building technologies. The City welcomes growth and diversity through policies and programs that will protect and enhance Raleigh’s existing neighborhoods, natural amenities, history, and cultural and human resources for future generations. The City leads to improve quality of life for neighborhoods and standard of living for all citizens. The City works with universities, colleges, citizens, and local partners to promote new technology, create new job opportunities, and encourage local businesses and entrepreneurs. The City enlists and prepares 21st Century staff with the skill sets to carry out the duties of the City through transparent civic engagement and by providing the very best customer service to our citizens. Facilities and Operations’ core mission is to plan and manage programs that: ensure health and safety by complying with all federal, state and local rules, regulations, statutes, and codes applicable to facilities; support the overall mission of the City of Raleigh by maintaining facilities that meet operational needs and program requirements of the users, promote the public image of the City of Raleigh by maintaining the architectural style and appearance of facilities; and minimize maintenance expense while optimizing value received on maintenance investments. We are focused on helping the City of Raleigh fulfill its mission and strategic planning and we prioritize our work with these initiatives in mind at all times. https://www.ips.state.nc.us/IPS/ https://www.ips.state.nc.us/IPS/ 4 1.3 Request for Proposal (RFP) Timeline Provided below is a list of the anticipated schedule of events related to this solicitation. The City of Raleigh reserves the right to modify and/or adjust the following schedule to meet the needs of the service. All times shown are Eastern Time (EST): 1.4 Pre-Proposal Conference If the City of Raleigh elects to conduct a Pre-Proposal Conference or Site Visit, attendance by prospective proposers is strongly encouraged but is not mandatory. Prospective Proposers are encouraged to submit written questions in advance. Date, time, and location of pre-proposal conference is shown above in Section 1.3, entitled RFP Timeline. 1.5 Proposal Question It is the Proposer's responsibility to ensure that all addenda have been reviewed and considered in the preparation of its proposal. Requests for clarification and questions to this RFP must be received by the City not later than the date shown above in Section 1.3, entitled “RFP Timeline” for the submittal of written inquires. The firm’s failure to request clarification and submit questions by the date in the RFP Timeline above shall be considered to constitute the firm’s acceptance of all City’s terms and conditions and requirements. The City shall issue addenda reflecting questions and answers to this RFP, if any, and shall be posted to North Carolina Interactive Purchasing System (IPS). No information, instruction or advice provided orally or informally by any City personnel, whether made in response to a question or otherwise in connection with this RFP, shall be considered authoritative or binding. Respondents shall be entitled to rely only on written material contained in an Addendum to this RFP. RFP Process Date Time RFP Advertisement Date Monday April 13, 2020 Pre-Proposal Conference (if required) N/A Deadline for written questions N/A City Response to questions (anticipated) N/A Proposal Due Date and Time Wednesday April 29th 2020 2:00PM Evaluation Meeting (anticipated) Friday May 1st 2020 Interview/ Demonstrations (if required) N/A Selection Announced at Council Meeting (tentative) N/A 5 It is important that all Respondents submitting to this RFP periodically check the North Carolina Interactive Purchasing System (IPS) for any Addenda. It is the Respondents responsibility to ensure that all addenda have been reviewed and, if required signed and returned. All questions related to this solicitation must be submitted in writing (via email) to the following individual: Contact Name Email Address Steven Chelini Steven.Chelini@raleighnc.gov Questions submitted via telephone will not be answered. 1.6 Proposal Submission Requirements and Contact Information Proposals must follow the format as defined in Section 2 PROPOSALS, and be addressed and submitted as follows: DELIVERED BY US POSTAL SERVICE DELIVERED BY ALL OTHER MEANS City of Raleigh Engineering Services, Facilities and Operations City of Raleigh Engineering Services, Facilities and Operations ATTN: Steven Chelini ATTN: Steven Chelini PO Box 590 Raleigh, NC 27602 Raleigh Municipal Building 222 W. Hargett St., Suite 605 Raleigh, NC 27602 RFP No. & Title RFP No. & Title Proposals must be enclosed in an envelope or package and clearly marked with the name of the submitting company, the RFP number and the RFP Title. Proposers must submit: A. one (1) signed original; B. one (1) electronic version of the signed proposal and; C. Three (3) copies of proposal. The electronic version of the Proposal must be submitted as a viewable and printable Adobe Portable Document File (PDF) on a Flash Drive. Both hard copy and electronic versions must be received by the City on or before the RFP due date and time provided in Section 1.3. Proposals received after the RFP due date and time will not be considered and will be returned unopened to the return address on the submission envelope or package. Any requirements in the RFP that cannot be met must be indicated on Appendix V, “Exceptions to the RFP” and submitted with proposal. Proposers must respond to the entire Request for Proposals (RFP). Any incomplete proposal may be eliminated from competition at the discretion of the City of Raleigh. The City 6 reserves the right to reject any or all proposals for any reason and to waive any informality it deems in its best interest. Proposals that arrive after the due date and time will not be accepted or considered for any reason whatsoever. If the Firm elects to mail in its response, the Firm must allow sufficient time to ensure the City’s proper receipt of the package by the time specified in Section 1.3, “RFP Timeline”. Regardless of the delivery method, it is the responsibility of the Firm to ensure that their response arrives at the designated location specified in this Section by the due date and time specified in Section 1.3, “RFP Timeline”. 1.7 Rights to Submitted Material All proposals and supporting materials, as well as correspondence relating to this RFP, shall become the property of the City. The content of all submittals will be held confidential until the selection of the firm is made. Proposals will be reviewed by the Evaluation Team, as well as other City staff and members of the general public who submit public record requests. Any proprietary data must be clearly marked. In submitting a Proposal, each Prospective Proposer agrees that the City may reveal any trade secret materials contained in such response to all City staff and City officials involved in the selection process and to any outside consultant or other third party who serves on the Evaluation Team or who is hired by the City to assist in the selection process. The City reserves the right to retain all proposals submitted and to use any ideas in a proposal regardless of whether that proposal is selected. Submission of a proposal indicates acceptance by the Proposer of the conditions contained in this Request for Proposal. Proposals marked entirely as “confidential”, “proprietary”, or “trade secret” will be considered non-responsive and will be removed from the evaluation process. 1.8 Communications All communications of any nature regarding this RFP with any City staff, elected City officials, evaluation committee members, are strictly forbidden from the time the solicitation is publicly posted until award. Questions must be submitted in writing to the individual designated in Section 1.1. prior to the deadline provided in Section 1.3. Violation of this provision may result in the firm’s proposal being removed from consideration. 1.9 Lobbying By responding to this solicitation, the firm certifies that is has not and will not pay any person or firm to influence or attempt to influence an officer or employee of the City or the State of North Carolina, or any elected official in connection with obtaining a contract as a result of this RFP. 1.10 Conflicts of Interest City of Raleigh contracts are controlled by three conflict of interest provisions. 7 First, federal procurement standards provide in 2 CFR 200.318 (c)(1), No employee, officer, or agent may participate in the selection, award, or administration of a contract supported by a Federal award if he or she has a real or apparent conflict of interest. Such a conflict of interest would arise when the employee, officer, or agent, any member of his or her immediate family, his or her partner, or a firm which employs or is about to employ any of the parties indicated herein, has a financial or other interest in or a tangible personal benefit from a firm considered for a contract. The officers, employees, and agents of the non-Federal entity may neither solicit nor accept gratuities, favors, or anything of monetary value from contractors or parties to subcontracts. Similarly, the North Carolina General Statutes provides a criminal statute for conflicts of interest in public contracting. N.C.G.S. § 14-234(a): (1) No public officer or employee who is involved in making or administering a contract on behalf of a public agency may derive a direct benefit from the contract except as provided in this section, or as otherwise allowed by law. (2) A public officer or employee who will derive a direct benefit from a contract with the public agency he or she serves, but who is not involved in making or administering the contract, shall not attempt to influence any other person who is involved in making or administering the contract. (3) No public officer or employee may solicit or receive any gift, favor, reward, service, or promise of reward, including a promise of future employment, in exchange for recommending, influencing, or attempting to influence the award of a contract by the public agency he or she serves. City of Raleigh Charter Section 3.9 regulates private transactions between the City and its officials and employees. The Charter states: "No member of the City Council, official, or employee of the City of Raleigh shall be financially interested, or have any personal beneficial interest, either directly or indirectly, as agent, representative, or otherwise, in the purchase of, or contract for, or in furnishing any materials, equipment or supplies to the City of Raleigh, nor shall any official or employee of the City of Raleigh accept or receive, or agree to accept or receive, directly or indirectly, from any person, firm or corporation to whom any contract may be awarded or from whom any materials, equipment or supplies may be purchased by the City of Raleigh, by rebate, gift, or otherwise, any money or anything of value whatsoever, or any promise, obligation or contract for future reward or compensation, for recommending or procuring the uses of any such materials, equipment or supplies by the City of Raleigh; no member of the City Council, official or employee of the City of Raleigh shall for his own personal benefit operate, directly or indirectly, any concession in any building or on any lands of the City of Raleigh, nor shall any official or employee of the City of Raleigh bid for or be awarded any contract granting concessionary rights of any nature or kind from the City of Raleigh; it shall be unlawful for any member of the City Council, official or employee of the City of Raleigh to bid for or to purchase or to contract to purchase from the City of Raleigh any real estate, equipment, materials, 8 or supplies of any nature or kind whatsoever, either directly or indirectly, at either public or private sale, either singly, or through or jointly with any other person.” 1.11 Proposer Expenses The City of Raleigh will not be responsible for any expenses incurred by any Proposer in the development of a response to this Request for Proposal or any other activities associated with this procurement including but not limited to any onsite (or otherwise) interviews and/or presentations, and/or supplemental information provided, submitted, or given to City of Raleigh and/or its representatives. Further, the City of Raleigh shall reserve the right to cancel the work described herein prior to issuance and acceptance of any contractual agreement/purchase order by the recommended Proposer even if the awarding authority for each entity has formally accepted a recommendation. 1.12 Proposer Acceptance Submission of any proposal indicates a Proposer’s acceptance of the conditions contained in this RFP unless clearly and specifically noted otherwise on Appendix V, “Exceptions to RFP” and submitted with proposal. Furthermore, the City of Raleigh is not bound to accept a proposal on the basis of lowest price, and further, the City of Raleigh has the sole discretion and reserves the right to cancel this RFP, and to reject any and all proposals, to waive any and all informalities and/or irregularities, or to re-advertise with either the identical or revised specifications, if it is deemed to be in the City of Raleigh’s best interests to do so. The City of Raleigh reserves the right to accept or reject any or all of the items in the proposal, and to award the contract in whole or in part and/or negotiate any or all items with individual Proposers if it is deemed in the City of Raleigh’s best interest. Moreover, the City of Raleigh reserves the right to make no selection if proposals are deemed to be outside the fiscal constraint or not in the best interest of the City of Raleigh. 9 2 PROPOSALS Responses must follow the format outlined below. The City may reject as non- responsive at its sole discretion any proposal that does not provide complete and/or adequate responses or departs in any substantial way from the required format. 2.1 Request for Proposals Required Document Format Responses should be divided using tabs to separate each section, listed sequentially as follows: Tab 1: Cover Letter Provide an introduction letter summarizing the unique proposal of your firm to meet the needs of this service requirement. This letter should be presented on the firm’s official letterhead and signed by an authorized representative who has the authority to enter into a contract with the City on behalf of the firm. Additionally, include the name, address, telephone and email address of the individual who serves as the point of contact for this solicitation. Tab 2: Corporate Background and Experience Include background information on the firm and provide detailed information regarding the firm’s experience with similar projects. Provide a list of all similar contracts performed in the past 3 years, accompanied by at least three (3) references (contact persons, firm, telephone number and email address). Include the total amount invoiced for each listed project, the length of the project, and list of those involved in the project who are also proposed for the subject project named in this solicitation. Failure to provide a list of all similar contracts in the specified period may result in the rejection of the firm’s proposal. The evaluation team reserves the right to contact any or all listed references, and to contact other public entities regarding past performance on similar projects. Tab 3: Financial Information Recent audited or reviewed financial statements prepared by an independent certified public accountant (CPA) that shall include, at a minimum, a balance sheet, income statement (i.e., profit/loss statement) and cash flow statement and, if the audited or reviewed financial statements were prepared more than six (6) months prior to the issuance of this RFP, the Proposer shall submit its most recent internal financial statements (balance sheet, income statement and cash flow statement or budget with entries reflecting revenues and expenditures from the date of the audited or reviewed financial statements to the end of the most recent financial reporting period (i.e., the quarter or month preceding the issuance date of this RFP)). OR Recent compiled financial statements prepared by an independent CPA that shall include, at a minimum, a balance sheet, income statement (i.e., profit/loss statement) and cash flow statement and, if the compiled financial statements were 10 prepared more than three (3) months prior to the issuance of this RFP, the Proposer shall submit its most recent internal financial statements (balance sheet, income statement and cash flow statement or budget with entries reflecting revenues and expenditures to date), and other evidence of financial stability such as most recently filed income tax return, evidence of a line of credit/loans/other type of financing with statement of amount in use/outstanding balance (e.g., a complete copy commitment letter, loan agreement, billing statement reflecting the line of credit or statement from lender acknowledging the commitment to fund the Proposer’s stated financing), personal guaranty with copies of personal income tax filing and statement of net worth or such other evidence that is accurate, reliable and trustworthy regarding the Proposer’s financial stability. All financial information, statements and/or documents provided in response to this solicitation shall be kept confidential provided that EACH PAGE is marked as follows: “CONFIDENTIAL – DO NOT DISCLOSE EXCEPT FOR THE EXPRESS PURPOSE OF PROPOSAL EVALUATION. “ “Recent” shall be defined as financial statements that were prepared within the 12 months preceding the issuance date of this RFP. Consolidated financial statements of the Proposer’s parent or related corporation/business entity shall not be considered, unless: (1) the Proposer’s actual financial performance for the designated period is separately identified in and/or attached to the consolidated statements, (2) the parent or related corporation/business entity provides the State with a document wherein the parent or related corporation/business entity will be financially responsible for the Proposer’s performance of the contract and the consolidated statement demonstrates the parent or related corporation’s/business entity’s financial ability to perform the contract, financial stability and/or such other financial considerations identified in the evaluation criteria; and/or (3) Proposer provides its own internally prepared financial statements and such other evidence of its own financial stability identified above. The firm’s failure to provide any of the above-referenced financial statements may result in the proposal being removed from consideration. Proposers are also encouraged to explain any negative financial information, and to provide documentation supporting those explanations and demonstrating the financial strength of the firm. Tab 4: Project Understanding, Approach and Schedule Provide a comprehensive narrative, outline, and/or graph demonstrating the firm's understanding and approach to accomplishing the tasks outlined in the Scope of Work section of this RFP. A description of each task and deliverable and the schedule for accomplishing each shall be included. 11 Tab 5: Team Firm, Experience and Certifications This section must include the proposed staffing, deployment and firm of personnel to be assigned to this project. The Proposer shall provide information as to the Proposals and experience of all executive, managerial, legal, and professional personnel to be assigned to this project, including resumes citing experience with similar projects and the responsibilities to be assigned to each person. A project- specific firm chart which clearly illustrates the roles, responsibilities, and the reporting relationships of each team member should be included. Tab 6: Cost In a separate sealed envelope provide a minimum of 3 complete copies of cost schedule. Hourly rates shall be fully burdened to include all costs, all applicable overhead and profit (including lodging, meals, and transportation). Attach any additional pricing details. 2.2 RFP Documents This RFP is comprised of the base RFP document, any attachments, and any addenda released before Contract award. All attachments and addenda released for this RFP in advance of any Contract award are incorporated herein by reference. 3 PROPOSAL EVALUATION 3.1 Proposal Evaluation Criteria (Stage 1) This is not a bid. There will not be a public opening. The Proposals received in response to this RFP will be evaluated and ranked, by the Proposal Evaluation Committee in accordance with the process and evaluation criteria contained below. Responses will be evaluated in light of the material and substantiating evidence presented in the response, and not on the basis of what is inferred. After thoroughly reading and reviewing this RFP, each Evaluation committee member shall conduct his or her independent evaluation of the proposals received and grade the responses on their merit in accordance with the evaluation criteria set forth in the following table. The maximum interview/demonstration points a Proposer can receive is 5 points. The Proposers selected for interviews/demonstrations under this section will be notified in writing of the date and time. The Proposers’ interview/demonstrations shall be based solely upon information provided in each Proposer’s original proposal. No new information may be presented. 12 Criteria (a) Weight (b) Score (0-3) (a) x (b) Weighted Score Corporate Background and Experience 20 Firm Financial Stability 20 Project Understanding 20 Project Approach 15 Team Firm Experience 10 Proposed Cost 15 Total Score (without Interview/Demonstrations) Interview/Demonstration (if applicable) 5 Final Score (with Interview/Demonstrations) Score Points 0- Missing or Does Not Meet Expectation 2- Meets Expectation 1- Partially Meets Expectation 3- Exceeds Expectation Cost Formula: The cost criterion is rated by giving the proposal with the lowest total cost the maximum number of Cost points available. The remaining proposals are rated by applying the following formula: 1 - B - A x C = D A A—the lowest Proposer’s cost. B—the Proposer’s cost being scored. C—the maximum number of cost points available. D—Proposer’s cost score (points). Note: If the formula results in a negative number (which will occur when the Offeror’s cost is more than twice the lowest cost), zero points shall be assigned. 3.2 Interview/Demonstration (Stage 2) A short-list of firms may be invited to Stage 2 of the evaluation process, the Interview/ Demonstration. Interview/demonstrations are an important aspect of the evaluation process that offers the City an opportunity to see how the proposer’s solution meets the critical components of the RFP. 3.3 Final Selection Proposals will be evaluated and ranked according to the criteria and weighted values set forth in section 3.1. Either a final selection for recommendation will be made at this time or the short-list of firms will be invited to participate in Stage 2 of 13 the evaluation process. If Stage 2 is implemented, each firm will be evaluated and assigned a score to determine the best firm for recommendation. After which negotiations of a contract with the most qualified firm will commence. If negotiations are unsuccessful, the City will then pursue negotiations with the next most qualified firm. All Proposers will be notified of their standing immediately following the City’s decision. The City shall not be bound or in any way obligated until both parties have executed a contract. The City also reserves the right to delay the award of a contract or to not award a contract. 3.4 Notice to Proposers Regarding RFP Terms and Conditions It shall be the Proposer’s responsibility to read the Instructions, the City’s contract terms (Appendix IV), all relevant exhibits, attachments, and any other components made a part of this RFP and comply with all requirements and specifications herein. Proposers are also responsible for obtaining and complying with all Addenda and other changes that may be issued in connection with this RFP. 4 CONTRACT TERMS The Contract shall have an initial term of 3 years, beginning on the date of the Contract award (the “Effective Date”). At the end of the Contract’s current term, the City shall have the option, in its sole discretion, to renew the Contract on the same terms and conditions for up to a total of 2 additional one-year terms. The City will give the Contractor written notice of its intent whether to exercise each option no later than 30 days before the end of the Contract’s then-current term. In addition, the City reserves the right to extend a contract term for a period of up to 180 days in 90-day-or-less increments. 5 SCOPE OF SERVICES Awarded Contractor shall provide services, all as set forth in this RFP and more particularly described in this Section 5. Bidder shall assure sufficient service as to provide timely completion of inspections and testing that is convenient for the City of Raleigh (COR) and shall not disrupt normal business operations. Contact Period: The term of this contract shall be for three (3) years upon award of contract and the City reserves the option to renew for two (2), one (1) year increments unless otherwise terminated. Contract prices must be firm for the contract period, unless stipulated otherwise in this proposal. The typical annual Fire Extinguisher Inspection and Service for City of Raleigh facilities, Facilities and Operations vehicles, and special events usage shall consist of the following tasks, as well as any and all tasks required in order to conform with all applicable NFPA, Federal, State, OSHA and Local Authority having jurisdiction Standards, Regulations, Codes and Requirements. The fire extinguishers and corresponding services will be at City of Raleigh 14 locations identified in the City of Raleigh fire extinguisher spreadsheet available from Steven Chelini via email at Steven.Chelini@raleighnc.gov or (919) 996-3420. 1. Services are to be scheduled within 7 days of initial verbal receipt of order. Service hours are 7:30 a.m. to 4:30 p.m. at all locations, Monday through Friday. 2. Inspections and Recharges will be conducted at each individual site, which must be predetermine and scheduled through City of Raleigh and vendor. 3. At time of inspection, an assessment shall be provided to assure the proper operation of the unit(s). Contractor must perform inspections and recharges for identified extinguishers at each facility, and any additional extinguisher must be documented (type and weight) and scheduled to be inspected and recertified at a later date, as approved by City of Raleigh designee. 4. Complete inspect, and/or testing as required by local, state and federal agencies. 5. Inspections, recharges and service calls shall be done on site when possible. If device needs to be taken off site, a loaner must be provided, and original extinguisher must be returned to site upon completion of inspection, recharge and/or servicing. 6. Fire extinguisher site inspections shall be scheduled. Service Tickets, Invoice and Payment, and instructions are to be adhered to. (See titled sections for details). 7. Any additional work is to be performed shall be based on awarded Itemized Pricing Table and must be approved by City of Raleigh prior to additional work begin executed. 8. City of Raleigh may approve servicing of Fire extinguishers at a centralized location for inspection and maintenance. This must be coordinated, scheduled, and approved by City of Raleigh designee. 9. City of Raleigh shall not be responsible for any trip charges, vehicle fees, and/or fuel surcharges involved with the inspection, recertification, and necessary repairs related to the identified fire extinguishers. 10. Awarded Bidder must provide an updated fire extinguisher inventory at the end of each fiscal year (July – June) per facility, identifying quantity, type, size, and location. Any additional locations and/or extinguishers outside of the existing annual inventory shall be amended annually into the Awarded Bidder’s contract. 0 mailto:Steven 15 APPENDIX I Proposal Cost Form Awarded Contractor shall perform the services to be performed as set forth in this RFP and more particularly described in Section 5 for a not to exceed total amount of $___________________________________________________. Proposer shall attach proposal cost breakdown to Appendix I – Proposal Cost Form. Firm Name: ____________________________________________________________ Authorized Signature _______________________________Date__________________ Signed by: _____________________________________________________________ [Type or Print Name] Title of Signer: __________________________________________________________ 16 APPENDIX II PROPOSER QUESTIONNAIRE The following questions must be answered, and data given must be clear and comprehensive. If necessary, questions may be answered on separate sheets. The Proposer may submit any additional information desired. Company Name: d/b/a (if applicable) Street / PO Box: City: State: Zip: Phone: Fax: E-Mail: Website (if applicable): Sole Proprietor Partnership Corporation Other Number of years in business under company’s present name: Fed Tax ID #: DUNS # Are you certified with the North Carolina Secretary of State to conduct business (if required)? (Check One) YES: NO: Not Applicable: Are you properly licensed/certified by the Federal and/or State of North Carolina to perform the specified work? YES: NO: Not Applicable: ATTACH COPY OF ALL APPLICABLE LICENSING/CERTIFICATION DOCUMENTS Are/will you be properly insured to perform the work? YES: NO: Contact for this Contract: Title: Phone: Fax: E-Mail: Have you ever defaulted or failed on a contract? (If yes, attach details) YES: NO: List at least three (3) references for which you have provided these services (same scope/size) in the past three years - preferably government agencies. Do not include City of Raleigh as a reference to meet the requirement of listing at least (3) references. PROPOSERS ARE RESPONSIBLE FOR SENDING REFERENCE QUESTIONNAIRE (APPENDIX III) TO THEIR REFERENCES. 1. Company: Contact Person: Title: Phone: Fax: E-Mail: Describe Scope of Work: 2. Company: Contact Person: Title: Phone: Fax: E-Mail: Describe Scope of Work: 3. Company: Contact Person: Title: Phone: Fax: E-Mail: Describe Scope of Work: 4. Company: Contact Person: Title: Phone: Fax: E-Mail: Describe Scope of Work: 5. Company: Contact Person: Title: Phone: Fax: E-Mail: Describe Scope of Work: The undersigned swears to the truth and accuracy of all statements and answers contained herein: Authorized Signature: Date: 17 APPENDIX III City of Raleigh Fire Extinguishers Inspection and Maintenance Reference Questionnaire The City of Raleigh, as a part of the RFP, requires proposing companies to submit a minimum of three (3) business references as required within this document. The purpose of these references is to document the experience relevant to the scope of services and provide assistance in the evaluation process. The Proposer is required to send the reference form (the following two pages) to each business reference listed on Proposer Questionnaire. The business reference, in turn, is requested to submit the Reference Form directly to the City of Raleigh Point of Contact identified on the Reference Questionnaire form for inclusion in the evaluation process. The form and information provided will become a part of the submitted proposal. The business reference may be contacted for validation of the response. It is the Proposer’s responsibility to verify their references have been received by the City of Raleigh Point of Contact by the date indicated on the reference form. 18 City of Raleigh 274-ES-FO-2020 Fire Extinguisher Inspection and Maintenance REFERENCE QUESTIONNAIRE _______________________________________________________________ (Name of Business Requesting Reference) This form is being submitted to your company for completion as a business reference for the company listed above. This form is to be returned to the City of Raleigh, Steven Chelini,, via email to steven.chelini@raleighnc.gov no later than 2:00 p.m. ET, April 29th, 2020 and MUST NOT be returned to the company requesting the reference. For questions or concerns regarding this form, please contact the City of Raleigh, Point of Contact above. Company Providing Reference Contact Name and Title/Position Contact Telephone Number Contact Email Address Questions: 1. In what capacity have you worked with this company in the past? If the company was under a contract, please acknowledge and explain briefly whether or not the contract was successful. Comments: 2. How would you rate this company’s knowledge and expertise? 3= Excellent 2= Satisfactory 1= Unsatisfactory 0= Unacceptable Comments: 3. How would you rate the company’s flexibility relative to changes in the scope and timelines? 3= Excellent 2= Satisfactory 1= Unsatisfactory 0= Unacceptable Comments: 4. What is your level of satisfaction with hard-copy materials, e.g. reports, logs, etc. produced by the company? 3= Excellent 2= Satisfactory 1= Unsatisfactory 0= Unacceptable Comments: 19 5. How would you rate the dynamics/interaction between the company and your staff? 3= Excellent 2= Satisfactory 1= Unsatisfactory 0= Unacceptable Comments: 6. Who were the company’s principle representatives involved in providing your service and how would you rate them individually? Would you comment on the skills, knowledge, behaviors or other factors on which you based the rating? (3= Excellent; 2= Satisfactory; 1= Unsatisfactory; 0= Unacceptable) Name: Rating: Name: Rating: Name: Rating: Name: Rating: Comments: 7. With which aspect(s) of this company’s services are you most satisfied? Comments: 8. With which aspect(s) of this company’s services are you least satisfied? Comments: 9. Would you recommend this company’s services to your organization again? Comments: _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ _ 20 APPENDIX IV CONTRACT STANDARD TERMS AND CONDITIONS The contract terms provided herein shall become a part of any contract issued as a result of this solicitation. Any exceptions to the contract terms must be stated in the submittal. Any submission of a proposal without objection to the contract terms indicates understanding and intention to comply with the contract terms. If there is a term or condition that the firm intends to negotiate, it must be stated in the proposal. The successful firm will not be entitled to any changes or modifications unless they were first stated in the proposal. The City of Raleigh reserves the right, at its sole discretion, to reject any or all submittal package(s) containing unreasonable objections to standard City of Raleigh contract provisions. 1. Compensation; Time of Payment The standard City of Raleigh payment term is NET 30 days from the date of invoice. For prompt payment all invoices should be emailed to (accountspayable@raleighnc.gov) or mail to the City of Raleigh, Accounts Payable, PO Box 590, Raleigh, North Carolina 27602-0590. All invoices must include the Purchase Order Number. Invoices submitted without the correct purchase order number will result in delayed payment. 2. Workmanship and Quality of Services All work performed under this Contract shall be performed in a workmanlike and professional manner, to the reasonable satisfaction of the City, and shall conform to all prevailing industry and professional standards. 3. Non-discrimination To the extent permitted by North Carolina law, the parties hereto for themselves, their agents, officials, employees and servants agree not to discriminate in any manner on the basis of race, color, creed, national origin, sex, age, handicap, or sexual orientation with reference to the subject matter of this Contract. The parties further agree, to the extent permitted by law, to conform with the provisions and intent of City of Raleigh Ordinance 1969-889, as amended. This provision is hereby incorporated into this Contract for the benefit of the City of Raleigh and its residents, and may be enforced by action for specific performance, injunctive relief, or other remedy as provided by law. This provision shall be binding on the successors and assigns of the parties with reference to the subject matter of this Contract. 4. Minority or Women Owned Business Enterprise The City of Raleigh prohibits discrimination in any manner on the basis of race, color, creed, national origin, sex, age or handicap or sexual orientation and will pursue an affirmative policy of fostering, promoting and conducting business with women and minority owned business enterprises. The City of Raleigh encourages participation by certified minority and women-owned businesses. If there are any questions, Contact the MWBE Program Manager, PO BOX 590 Raleigh, NC 27602, mwbe@raleighnc.gov, or 919-996-4330. mailto:accountspayable@raleighnc.gov mailto:accountspayable@raleighnc.gov mailto:mwbe@raleighnc.gov mailto:mwbe@raleighnc.gov 21 5. Assignment This Contract may not be assigned without the express written consent of the City. 6. Applicable Law All matters relating to this Contract shall be governed by the laws of the State of North Carolina, without regard to its choice of law provisions, and venue for any action relating to this Contract shall be Wake County Civil Superior Court or the United States District Court for the Eastern District of North Carolina, Western Division. 7. Insurance Contractor agrees to maintain, on a primary basis and at is sole expense, at all times during the life of this Contract the following coverages and limits. The requirements contained herein, as well as City’s review or acceptance of insurance maintained by Contractor is not intended to and shall not in any manner limit or qualify the liabilities or obligations assumed by Contractor under this Contract. Commercial General Liability – Combined single limit of no less than $1,000,000 each occurrence and $2,000,000 aggregate. Coverage shall not contain any endorsement(s) excluding nor limiting Product/Completed Operations, Contractual Liability or Cross Liability. Automobile Liability – Limits of no less than $1,000,000 Combined Single Limit. Coverage shall include liability for Owned, Non-Owned and Hired automobiles. In the event Contractor does not own automobiles, Contractor agrees to maintain coverage for Hired and Non-Owned Auto Liability, which may be satisfied by way of endorsement to the Commercial General Liability policy or separate Auto Liability policy. Automobile coverage is only necessary if vehicles are used in the provision of services under this Contract and/or are brought on a COR site. Worker’s Compensation & Employers Liability – Contractor agrees to maintain Worker’s Compensation Insurance in accordance with North Carolina General Statute Chapter 97 with statutory limits and employees liability of no less than $1,000,000 each accident. Additional Insured – Contractor agrees to endorse the City as an Additional insured on the Commercial General Liability, Auto Liability and Umbrella Liability if being used to meet the standard of the General Liability and Automobile Liability. The Additional Insured shall read ‘City of Raleigh is named additional insured as their interest may appear’. Certificate of Insurance – Contractor agrees to provide COR a Certificate of Insurance evidencing that all coverages, limits and endorsements required herein are maintained and in full force and effect, and Certificates of Insurance 22 shall provide a minimum thirty (30) day endeavor to notify, when available, by Contractor’s insurer. If Contractor receives a non-renewal or cancellation notice from an insurance carrier affording coverage required herein, or receives notice that coverage no longer complies with the insurance requirements herein, Contractor agrees to notify the City within five (5) business days with a copy of the non-renewal or cancellation notice, or written specifics as to which coverage is no longer in compliance. The Certificate Holder address should read: City of Raleigh Post Office Box 590 Raleigh, NC 27602-0590 Umbrella or Excess Liability – Contractor may satisfy the minimum liability limits required above under an Umbrella or Excess Liability policy. There is no minimum Per Occurrence limit of liability under the Umbrella or Excess Liability, however, the Annual Aggregate limits shall not be less than the highest ‘Each Occurrence’ limit for required policies. Contractor agrees to endorse City of Raleigh as an ‘Additional Insured’ on the Umbrella or Excess Liability, unless the Certificate of Insurance states the Umbrella or Excess Liability provides coverage on a ‘Follow-Form’ basis. Professional Liability – Limits of no less than $1,000,000 each claim. This coverage is only necessary for professional services such as engineering, architecture or when otherwise required by the City. All insurance companies must be authorized to do business in North Carolina and be acceptable to the City of Raleigh’s Risk Manager. 8. Indemnity Except to the extent caused by the sole negligence or willful misconduct of the City, the Contractor shall indemnify and hold and save the City, its officers, agents and employees, harmless from liability of any kind, including all claims, costs (including defense) and losses accruing or resulting to any other person, firm, or corporation furnishing or supplying work, services, materials, or supplies in connection with the performance of this Contract, and from any and all claims, costs (including defense) and losses accruing or resulting to any person, firm, or corporation that may be injured or damaged by the Contractor in the performance of this Contract. This representation and warranty shall survive the termination or expiration of this Contract. The Contractor shall indemnify and hold and save the City, its officers, agents and employees, harmless from liability of any kind, including claims, costs (including defense) and expenses, on account of any copyrighted material, patented or unpatented invention, articles, device or appliance manufactured or used in the performance of this Contract. 23 9. Intellectual Property Any information, data, instruments, documents, studies, reports or deliverables given to, exposed to, or prepared or assembled by the Contractor under this Contract shall be kept as confidential proprietary information of the City and not divulged or made available to any individual or organization without the prior written approval of the City. Such information, data, instruments, documents, studies, reports or deliverables will be the sole property of the City and not the Contractor. All intellectual property, including, but not limited to, patentable inventions, patentable plans, copyrightable works, mask works, trademarks, service marks and trade secrets invented, developed, created or discovered in performance of this Contract shall be the property of the City. Copyright in and to any copyrightable work, including, but not limited to, copy, art, negatives, photographs, designs, text, software, or documentation created as part of the Contractor’s performance of this project shall vest in the City. Works of authorship and contributions to works of authorship created by the Contractor’s performance of this project are hereby agreed to be ‘works made for hire’ within the meaning of 17 U.S.C. 201. 10. Force Majeure Except as otherwise provided in any environmental laws, rules, regulations or ordinances applicable to the parties and the services performed under this Contract, neither party shall be deemed to be in default of its obligations hereunder if and so long as it is prevented from performing such obligations by an act of war, hostile foreign actions, nuclear explosion, earthquake, hurricane, tornado, or other catastrophic natural event or act of God. Either party to the Contract must take reasonable measures and implement reasonable protections when a weather event otherwise defined as a force majeure event is forecast to be eligible to be excused from the performance otherwise required under this Contract by this provision. 11. Advertising The Contractor shall not use the existence of this Contract, or the name of the City of Raleigh, as part of any advertising without the prior written approval of the City. 12. Cancellation The City may terminate this Contract at any time by providing thirty (30) days written notice to the Contractor. In addition, if Contractor shall fail to fulfill in timely and proper manner the obligations under this Contract for any reason, including the voluntary or involuntary declaration of bankruptcy, the City shall have the right to terminate this Contract by giving written notice to the Contractor and termination will be effective upon receipt. Contractor shall cease performance immediately upon receipt of such notice. 24 In the event of early termination, Contractor shall be entitled to receive just and equitable compensation for costs incurred prior to receipt of notice of termination and for the satisfactory work completed as of the date of termination and delivered to the City. Notwithstanding the foregoing, in no event will the total amount due to Contractor under this section exceed the total amount due Contractor under this Contract. The Contractor shall not be relieved of liability to the City for damages sustained by the City by virtue of any breach of this Contract, and the City may withhold any payment due to the Contractor for the purpose of setoff until such time as the City can determine the exact amount of damages due the City because of the breach. Payment of compensation specified in this Contract, its continuation or any renewal thereof, is dependent upon and subject to the allocation or appropriation of funds to the City for the purpose set forth in this Contract. 13. Laws/Safety Standards The Contractor shall comply with all laws, ordinances, codes, rules, regulations, safety standards and licensing requirements that are applicable to the conduct of its business, including those of Federal, State, and local agencies having jurisdiction and/or authority. All manufactured items and/or fabricated assemblies subject to operation under pressure, operation by connection to an electric source, or operation involving a connection to a manufactured, natural, or LP gas source shall be constructed and approved in a manner acceptable to the appropriate state inspector which customarily requires the label or re-examination listing or identification marking of the appropriate safety standard organization, such as the American Society of Mechanical Electrical Engineers for pressure vessels; the Underwriters' Laboratories and/or National Electrical Manufacturers' Association for electrically operated assemblies; or the American Gas Association for gas operated assemblies, where such approvals of listings have been established for the type(s) of devices offered and furnished. Further, all items furnished by the Contractor shall meet all requirements of the Occupational Safety and Health Act (OSHA), and state and federal requirements relating to clean air and water pollution. Contractor must comply with North Carolina Occupational Safety and Health Standards for General Industry, 29CFR 1910. In addition, Contractor shall comply with all applicable occupational health and safety and environmental rules and regulations. Contractor shall effectively manage their safety and health responsibilities including: A. Accident Prevention Prevent injuries and illnesses to their employees and others on or near their job site. Contractor managers and supervisors shall ensure personnel safety by strict adherence to established safety rules and procedures. 25 B. Environmental Protection Protect the environment on, near, and around their work site by compliance with all applicable environmental regulations. C. Employee Education and Training Provide education and training to all contractors employees before they are exposed to potential workplace or other hazards as required by specific OSHA Standards. 14. Applicability of North Carolina Public Records Law Notwithstanding any other provisions of this Contract, this Contract and all materials submitted to the City by the Contractor are subject to the public records laws of the State of North Carolina and it is the responsibility of the Contractor to properly designate materials that may be protected from disclosure as trade secrets under North Carolina law as such and in the form required by law prior to the submission of such materials to the City. Contractor understands and agrees that the City may take any and all actions necessary to comply with federal, state, and local laws and/or judicial orders and such actions will not constitute a breach of the terms of this Contract. To the extent that any other provisions of this Contract conflict with this paragraph, the provisions of this section shall control. 15. Miscellaneous The Contractor shall be responsible for the proper custody and care of any property furnished or purchased by the City for use in connection with the performance of this Contract, and will reimburse the City for the replacement value of its loss or damage. The Contractor shall be considered to be an Independent Contractor and as such shall be wholly responsible for the work to be performed and for the supervision of its employees. Nothing herein is intended or will be construed to establish any agency, partnership, or joint venture. Contractor represents that it has, or will secure at its own expense, all personnel required in performing the services under this Contract. Such employees shall not be employees of or have any individual contractual relationship with the City. This Contract may be amended only by written agreement of the parties executed by their authorized representatives. 16. Right to Audit and Access to Records 1. The City may conduct an audit of any services performed and fees paid subject to this Contract. The City, or its designee, may perform such an audit throughout the contract period and for three (3) years after termination thereof or longer if otherwise required by law. 2. The Contractor and its agents shall maintain all books, documents, papers, accounting records, contract records and such other evidence as may be 26 appropriate to substantiate costs incurred under this Contract. The City, or its designee, shall have the right to, including but not limited to: review and copy records; interview current and former employees; conduct such other investigation to verify compliance with contract terms; and conduct such other investigation to substantiate costs incurred by this Contract. 3. “Records” shall be defined as data of every kind and character, including but not limited to books, documents, papers, accounting records, contract documents, information, and materials that, in the City's sole discretion, relate to matters, rights, duties or obligations of this Contract. 4. Records and employees shall be available during normal business hours upon advanced written notice. Electronic mail shall constitute written notice for purposes of this section. 5. Contractor shall provide the City or its designee reasonable access to facilities and adequate and appropriate workspace for the conduct of audits. 6. The rights established under this section shall survive the termination of the Contract, and shall not be deleted, circumvented, limited, confined, or restricted by contract or any other section, clause, addendum, attachment, or the subsequent amendment of this Contract. 7. The Contractor shall reimburse the City for any overcharges identified by the audit within ninety (90) days of written notice of the City’s findings. 17. E – Verify Contractor shall comply with E-Verify, the federal E-Verify program operated by the United States Department of Homeland Security and other federal agencies, or any successor or equivalent program used to verify the work authorization of newly hired employees pursuant to federal law and as in accordance with N.C.G.S. §64-25 et seq. In addition, to the best of Contractor’s knowledge, any subcontractor employed by Contractor as a part of this contract shall be in compliance with the requirements of E-Verify and N.C.G.S. §64-25 et seq. 18. Iran Divestment Act Certification Contractor certifies that, as of the date listed below, it is not on the Final Divestment List as created by the State Treasurer pursuant to N.C.G.S. § 147- 86.55, et seq. In compliance with the requirements of the Iran Divestment Act and N.C.G.S. § 147-86.59, Contractor shall not utilize in the performance of the contract any subcontractor that is identified on the Final Divestment List. 19. Companies Boycotting Israel Divestment Act Certification Contractor certifies that it has not been designated by the North Carolina State Treasurer as a company engaged in the boycott of Israel pursuant to N.C.G.S. 147-86.81. 27 [REMAINDER OF PAGE INTENTIONALLY LEFT BLANK] 28 APPENDIX V EXCEPTIONS TO RFP Check one: ☐ NO EXCEPTIONS, PROPOSER COMPLIES WITH ALL DOCUMENTS IN RFP. ☐ EXCEPTIONS ARE LISTED BELOW: # RFP Page #, Section #, Appendix # Exceptions [Describe nature of Exception] Explain why this is an issue Proposed Alternative Indicate if exception is negotiable (N) or non- negotiable (NN) 1 2 3 4 5 6 7 8 9 10 11 12 FAILURE TO IDENTIFY ANY EXCEPTIONS WILL INDICATE ACCEPTANCE OF ALL TERMS AND CONDITIONS, AND REQUIREMENTS OF THE RFP AND ANY CORRESPONDING ADDENDUM ISSUED. THE CITY, AT ITS SOLE DISCRETION, MAY MODIFY OR REJECT ANY EXCEPTION OR PROPOSED CHANGE. Firm: Authorized Signature Title: Printed Name of Signer Date: ID Name Address FENumber Location Size TypeCode Mfg BarCode Last Hydro Next Hydro Last 6 Year Next 6 Year Next Annual Column1 110 South Mcdowell St. Raleigh NC 27601 1 Stairs 10 ABC Amerex S388476 2022 2016 2028 2020 110 South Mcdowell St. Raleigh NC 27601 2 Basement 10 ABC Amerex PFS-0005089 2015 2027 1/2021 2020 110 South Mcdowell St. Raleigh NC 27601 3 Basement Mechanical Room 10 CO2 Ansul Sentry Z324835 2011 2016 2020 110 South Mcdowell St. Raleigh NC 27601 4 Basement Mechanical Room 10 ABC Ansul Sentry WT973855 2016 2010 2022 2020 110 South Mcdowell St. Raleigh NC 27601 5 Stairs 10 ABC Amerex AE658636 2022 2016 2028 2020 110 South Mcdowell St. Raleigh NC 27601 6 Hallway Near Stairs 10 ABC Buckeye JF00993526 2014 2027 1/2021 2020 110 South Mcdowell St. Raleigh NC 27601 7 Hallway @ Lockers 10 ABC Amerex A28989205 2026 2020 2020 110 South Mcdowell St. Raleigh NC 27601 8 Hallway far side 10 ABC Amerex A28985791 2027 2021 2020 110 South Mcdowell St. Raleigh NC 27601 9 Carpet Room 5 ABC Ansul Sentry ZP713766 2020 2015 2026 2020 110 South Mcdowell St. Raleigh NC 27601 10 Stairs 10 ABC Amerex AE659958 2022 2016 2028 2020 110 South Mcdowell St. Raleigh NC 27601 11 Kitchen 10 ABC Amerex F70216687 2031 2015 2025 2020 110 South Mcdowell St. Raleigh NC 27601 12 Stairs 10 ABC Amerex S391302 2021 2016 2027 2020 110 South Mcdowell St. Raleigh NC 27601 13 Stairs 10 ABC Amerex AE661220 2022 2016 2028 2020 110 South Mcdowell St. Raleigh NC 27601 14 Stairs 10 ABC Amerex S392403 2021 2016 2027 2020 110 South Mcdowell St. Raleigh NC 27601 15 Stairs 10 ABC Amerex AE659957 2022 2016 2028 2020 110 South Mcdowell St. Raleigh NC 27601 16 Elevator Room 10 ABC Amerex F70231880 2031 2016 2020 110 South Mcdowell St. Raleigh NC 27601 17 Offices 10 ABC Amerex F70234603 2031 2014 2020 110 South Mcdowell St. Raleigh NC 27601 18 Hallway 5 ABC Amerex F71942299 2031 2017 2020 215 Person Street 215 Person Street Raleigh NC 27601 1 Meeting Room 10 ABC Buckeye BB-605457 2024 2018 2020 215 Person Street 215 Person Street Raleigh NC 27601 2 @ Rest Rooms 10 ABC Buckeye BB-605467 2024 2018 2020 215 Person Street 215 Person Street Raleigh NC 27601 3 Shelter Kitchen 6L Class K Amerex AB397498 2024 2018 2029 2020 215 Person Street 215 Person Street Raleigh NC 27601 4 Shelter Kitchen 5 ABC ansul AU225740 2023 2020 215 Person Street 215 Person Street Raleigh NC 27601 5 Side Door 5 ABC Amerex A35672942 2027 2021 2020 215 Person Street 215 Person Street Raleigh NC 27601 6 Back Stairs 5 ABC Ansul Sentry F71942038 2031 2011 2023 2020 215 Person Street 215 Person Street Raleigh NC 27601 7 Upstairs 5 ABC Amerex F71943410 2031 2011 2023 2020 222 West Hargett Street Raleigh NC 27610 6 Spare 10 ABC Buckeye A34034716 2014 2026 2020 2020 222 West Hargett Street Raleigh NC 27610 7 Spare 10 ABC Buckeye A34034717 2014 2026 2020 2020 222 West Hargett Street Raleigh NC 27610 10 Shop Office 10 ABC Amerex A38292628 2014 2026 2020 2020 222 West Hargett Street Raleigh NC 27610 11 Shop Office 5 ABC Amerex B69716896 2028 2014 2022 2020 222 West Hargett Street Raleigh NC 27610 12 Parking Deck 10 ABC Amerex AR503916 2012 2025 2031 2020 222 West Hargett Street Raleigh NC 27610 13 Parking Deck 5 ABC Amerex A40542790 2026 2020 2020 222 West Hargett Street Raleigh NC 27610 14 Parking Deck 10 ABC Amerex F70229370 2031 2017 2029 2020 222 West Hargett Street Raleigh NC 27610 15 Parking Deck 10 ABC Amerex F70234049 2031 2014 2026 2020 222 West Hargett Street Raleigh NC 27610 16 Parking Deck Near Flammable Storage 10 ABC Ansul Sentry F70231877 2031 2014 2026 2020 222 West Hargett Street Raleigh NC 27610 17 Powered Equipment Locker 10 ABC Ansul Sentry F70232959 2031 2017 2028 2020 222 West Hargett Street Raleigh NC 27610 18 Flammable Storage 5 ABC Amerex A40542242 2026 2020 2020 222 West Hargett Street Raleigh NC 27610 19 Fuel Pump 10 ABC Amerex ZM653475 2020 2014 2026 2020 222 West Hargett Street Raleigh NC 27610 20 Fuel Pump 10 ABC Amerex F70187736 2031 2014 2025 2020 222 West Hargett Street Raleigh NC 27610 21 6th Floor 10 ABC Amerex ZM654438 2020 2014 2026 2020 222 West Hargett Street Raleigh NC 27610 22 6th Floor Mechanical Room 10 CO2 Ansul Sentry Z650507 2014 2019 2020 222 West Hargett Street Raleigh NC 27610 23 6th Floor Office 10 ABC Amerex ZN25844 2020 2014 2026 2020 222 West Hargett Street Raleigh NC 27610 24 5th Floor @ Stairs 10 ABC Amerex ZM653478 2020 2014 2026 2020 222 West Hargett Street Raleigh NC 27610 25 5th Floor Hallway 10 ABC Amerex ZN25845 2020 2014 2026 2020 222 West Hargett Street Raleigh NC 27610 26 5th Floor Mechanical Room 10 CO2 Ansul Sentry Z650510 2014 2019 2020 222 West Hargett Street Raleigh NC 27610 27 4th Floor Hallway 10 ABC Amerex ZN27203 2020 2014 2026 2020 222 West Hargett Street Raleigh NC 27610 28 4th Floor Mechanical Room 10 CO2 Ansul Sentry Z650503 2014 2019 2020 222 West Hargett Street Raleigh NC 27610 29 4th Floor @ Stairs 10 ABC Ansul Sentry F70184626 2031 2014 2025 2020 222 West Hargett Street Raleigh NC 27610 30 3rd Floor Hallway 10 ABC Amerex J57078 2021 2014 2027 2020 222 West Hargett Street Raleigh NC 27610 31 3rd Floor Mechanical Room 10 CO2 Ansul Sentry Z650506 2014 2019 2020 222 West Hargett Street Raleigh NC 27610 32 3rd Floor @ Stairs 10 ABC Ansul Sentry F70233724 2031 2014 2025 2020 222 West Hargett Street Raleigh NC 27610 33 2nd Floor Hallway 10 ABC Ansul Y607957 2022 2016 2028 2020 ID Name Address FENumber Location Size TypeCode Mfg BarCode Last Hydro Next Hydro Last 6 Year Next 6 Year Next Annual Column1 222 West Hargett Street Raleigh NC 27610 34 2nd Floor @ Stairs 10 ABC Amerex Y607949 2021 2014 2027 2020 222 West Hargett Street Raleigh NC 27610 35 2nd Floor Mechanical Room 10 CO2 Ansul Sentry Z650502 2014 2019 2020 222 West Hargett Street Raleigh NC 27610 36 Council Chambers 10 ABC Ansul Sentry F70229368 2031 2014 2025 2020 222 West Hargett Street Raleigh NC 27610 37 1st Floor Office 10 ABC Badger SA079332 2014 2026 2014 3/2023 2020 222 West Hargett Street Raleigh NC 27610 38 1st Floor @ Windows 10 ABC Buckeye Av327541 2024 2018 2030 2020 222 West Hargett Street Raleigh NC 27610 39 1st Floor Emergency Control 5 FE-36 Ansul X224199 2019 2014 2025 2020 222 West Hargett Street Raleigh NC 27610 40 Basement Hallway 10 ABC Ansul Sentry F70234601 2031 2014 2025 2020 222 West Hargett Street Raleigh NC 27610 41 Basement Room 004 5 CO2 Ansul Sentry Z267440 2014 2019 2020 222 West Hargett Street Raleigh NC 27610 42 Basement Room 002 10 CO2 Ansul Sentry Z650515 2014 2019 2020 222 West Hargett Street Raleigh NC 27610 43 Basement Room 002 10 CO2 Ansul Sentry Z324840 2014 2019 2020 222 West Hargett Street Raleigh NC 27610 Basement Elevator Room 5 ABC Amerex B69656281 2028 2023 2020 222 West Hargett Street Raleigh NC 27610 44 Basement Room 016 10 CO2 Ansul Sentry Z650513 2014 2019 2020 222 West Hargett Street Raleigh NC 27610 45 Basement Room 016 10 CO2 Ansul Sentry Z650514 2014 2019 2020 222 West Hargett Street Raleigh NC 27610 46 Inside Basement Room 016 YR65995 5 FE-36 Ansul X224198 2019 2014 2025 2020 222 West Hargett Street Raleigh NC 27610 47 Basement @ Snack Machine 10 ABC Ansul Y607932 2022 2018 2028 2020 222 West Hargett Street Raleigh NC 27610 48 911 Break Room 10 ABC Buckeye AV327535 2024 2018 2030 2020 222 West Hargett Street Raleigh NC 27610 49 911 Server Room 10 ABC Amerex ZM653476 2020 2014 2026 2020 222 West Hargett Street Raleigh NC 27610 50 911 Communications 10 ABC Buckeye BB605482 2024 2024 2018 2030 2020 222 West Hargett Street Raleigh NC 27610 51 911 Communications 10 ABC Ansul ZU158231 2021 2024 2018 2018 2020 222 West Hargett Street Raleigh NC 27610 52 Basement Hallway Near 911 10 ABC Ansul ZU158237 2021 2024 2018 2018 2020 222 West Hargett Street Raleigh NC 27610 53 Basement Room 001 5 CO2 Ansul Sentry Z268065 2014 2019 2020 222 West Hargett Street Raleigh NC 27610 54 Basement Telephone Room 10 ABC Amerex F702340048 2031 2014 2025 2020 222 West Hargett Street Raleigh NC 27610 55 Elevator Room On Roof 5 ABC Amerex PP812318 2025 3/2023 2020 222 West Hargett Street Raleigh NC 27610 56 Spare 10 ABC Amerex F70184625 2031 2018 2020 222 West Hargett Street Raleigh NC 27610 57 Spare 10 ABC Amerex F70234600 2031 2018 2020 222 West Hargett Street Raleigh NC 27610 58 Spare 2.5 ABC Amerex YZ774885 2021 2015 2027 2020 222 West Hargett Street Raleigh NC 27610 59 Spare 10 ABC Amerex YK57119 2021 2015 2027 2020 222 West Hargett Street Raleigh NC 27610 60 Spare 10 ABC Amerex F70187737 2031 2018 2020 310 West Martin Raleigh NC 27601 1 Maintenance warehouse 5 ABC Amerex B69714946 2028 2022 2020 310 West Martin Raleigh NC 27601 2 Maintenance warehouse 5 ABC Amerex B13792429 2027 2021 2020 310 West Martin Raleigh NC 27601 3 Top Of Stairs 5 ABC Ansul Sentry F63847702 2031 2015 2025 2020 310 West Martin Raleigh NC 27601 4 Fire Administration Kitchen 5 ABC Amerex BV628949 2025 2019 2020 310 West Martin Raleigh NC 27601 5 Fire Administration 10 ABC Kidde Metal Head AZ849692 2024 2018 2020 310 West Martin Raleigh NC 27601 6 Kitchen 5 ABC Amerex F63847700 2031 2015 2025 2020 310 West Martin Raleigh NC 27601 7 Fire Marshal Hallway 10 ABC Amerex F70186035 2031 2025 20-Apr 310 West Martin Raleigh NC 27601 8 Stairs 5 ABC Ansul Sentry F63847536 2031 2015 2025 20-Apr 310 West Martin Raleigh NC 27601 9 Inside Door 5 ABC Amerex F6384741 2031 2025 20-Apr 310 West Martin Raleigh NC 27601 10 On Cage 5 HALOTRON Ansul Sentry X224205 2019 2015 2025 2020 310 West Martin Raleigh NC 27601 11 Door to Fire Escape 5 ABC Ansul Sentry F63847679 2031 2015 2025 2020 310 West Martin Raleigh NC 27601 12 Cable TV 5 ABC Badger F63847703 2031 2015 2025 2020 310 West Martin Raleigh NC 27601 13 Hallway 5 ABC Amerex A40541960 2031 2025 2020 310 West Martin Raleigh NC 27601 14 RTN 5 ABC Ansul Sentry YK594824 2031 2015 2025 2020 310 West Martin Raleigh NC 27601 15 RTN 5 ABC Ansul Sentry F63847728 2031 2015 2025 2020 310 West Martin Raleigh NC 27601 16 RTN 5 ABC Amerex B67422486 2031 2025 2020 310 West Martin Raleigh NC 27601 17 Studio 5 ABC Amerex F63847704 2031 2025 2020 310 West Martin Raleigh NC 27601 18 Studio 5 ABC Amerex B13792087 2031 2025 2020 310 West Martin Raleigh NC 27601 19 Hallway 5 ABC Amerex F63847549 2031 2015 2025 2020 310 West Martin Raleigh NC 27601 20 Near Rest Rooms 5 ABC Ansul Sentry F63847546 2031 2015 2025 2020 310 West Martin Raleigh NC 27601 21 Incline 5 ABC Ansul Sentry F638475722 2031 2015 2025 2020 310 West Martin Raleigh NC 27601 22 Warehouse Spare 10 ABC Badger F70187739 2031 2025 2020 310 West Martin Raleigh NC 27601 23 Fire Dept Operations 10 ABC Ansul Sentry ZV615498 2021 2025 2020 900 Wilmington Street 900 Wilmington Street Raleigh NC 27601 1 Right Hallway 10 ABC Buckeye BB616516 2012 2024 2018 2020 900 Wilmington Street 900 Wilmington Street Raleigh NC 27601 2 Right Hallway 10 ABC Amerex PG038615 2024 2023 2017 2020 900 Wilmington Street 900 Wilmington Street Raleigh NC 27601 3 Right Hallway 10 ABC Amerex RC-389963 2011 2023 2017 2020 ID Name Address FENumber Location Size TypeCode Mfg BarCode Last Hydro Next Hydro Last 6 Year Next 6 Year Next Annual Column1 900 Wilmington Street 900 Wilmington Street Raleigh NC 27601 4 Left Hallway 10 ABC Amerex RC-387928 2011 2023 2017 2020 900 Wilmington Street 900 Wilmington Street Raleigh NC 27601 5 Elevator Room 5 ABC Amerex F52539536 2026 2020 2020 Abbotts Creek Park 9950 Durant Road Raleigh NC 27614 1 Lobby 10 ABC Amerex B00216174 2027 2021 2020 Abbotts Creek Park 9950 Durant Road Raleigh NC 27614 2 Gymnasium 10 ABC Amerex B00215623 2027 2021 2020 Abbotts Creek Park 9950 Durant Road Raleigh NC 27614 3 Gymnasium 10 ABC Amerex B00183576 2027 2021 2020 Abbotts Creek Park 9950 Durant Road Raleigh NC 27614 4 Gymnasium 10 ABC Amerex B00187461 2027 2021 2020 Abbotts Creek Park 9950 Durant Road Raleigh NC 27614 5 Hallway 10 ABC Amerex B00187463 2027 2021 2020 Abbotts Creek Park 9950 Durant Road Raleigh NC 27614 6 Hallway 10 ABC Amerex B00187627 2027 2021 2020 Abbotts Creek Park 9950 Durant Road Raleigh NC 27614 7 Boiler Room 10 ABC Buckeye A22450426 2027 2021 2020 Abbotts Creek Park 9950 Durant Road Raleigh NC 27614 8 Electrical Room 10 ABC Amerex B00180776 2027 2021 2020 Abbotts Creek Park 9950 Durant Road Raleigh NC 27614 9 @ Fitness Center 10 ABC Amerex B00215124 2027 2021 2020 Abbotts Creek Park 9950 Durant Road Raleigh NC 27614 10 Elevator Room 10 ABC Buckeye B06393373 2027 2021 2020 Anderson Point 20 Anderson Point Dr, Raleigh NC 27610 1 Comfort Station 5 ABC Amerex B07457513 2027 2021 2020 Anderson Point 20 Anderson Point Dr, Raleigh NC 27610 2 Anderson House Lobby 10 ABC Buckeye CD-385071 2026 2020 2020 Anderson Point 20 Anderson Point Dr, Raleigh NC 27610 3 Kitchen 5 ABC Buckeye AD625218 2023 2029 2020 Anderson Point 20 Anderson Point Dr, Raleigh NC 27610 4 House Upstairs 5 ABC Amerex C94654277 2029 2023 2020 Anderson Point 20 Anderson Point Dr, Raleigh NC 27610 5 Comfort Station 2 5 ABC Ansul Sentry F52539536 2031 2025 2020 Barwell Rd 3935 Barwell Rd, Raleigh NC 27610 1 By Elevator 10 ABC Ansul E83205703 2030 2014 2024 2020 Barwell Rd 3935 Barwell Rd, Raleigh NC 27610 2 Hallway 10 ABC Ansul E83205703 2030 2014 2024 2020 Barwell Rd 3935 Barwell Rd, Raleigh NC 27610 3 By Office 10 ABC Ansul E83205711 2030 2014 2024 2020 Barwell Rd 3935 Barwell Rd, Raleigh NC 27610 4 Elevator room 10 ABC Amerex F70185108 2031 2014 2025 2020 Barwell Rd 3935 Barwell Rd, Raleigh NC 27610 5 Front door 10 ABC Ansul E83205709 2030 2014 2024 2020 Barwell Rd 3935 Barwell Rd, Raleigh NC 27610 6 Kitchen 5 ABC Amerex A35006537 2026 2020 2020 Barwell Rd 3935 Barwell Rd, Raleigh NC 27610 7 Hallway 10 ABC Ansul E83205720 2030 2014 2024 2020 Barwell Rd 3935 Barwell Rd, Raleigh NC 27610 8 Soda Machine 10 ABC Ansul E83205699 2030 2014 2024 2020 Barwell Rd 3935 Barwell Rd, Raleigh NC 27610 9 Gym 2 10 ABC Ansul E83205702 2030 2014 2024 2020 Barwell Rd 3935 Barwell Rd, Raleigh NC 27610 10 Gym 1 10 ABC Ansul E83205705 2030 2014 2024 2020 Barwell Rd 3935 Barwell Rd, Raleigh NC 27610 11 gym 1 10 ABC Ansul E83205688 2030 2014 2024 2020 Barwell Rd 3935 Barwell Rd, Raleigh NC 27610 12 Gym 2 10 ABC Ansul E83205691 2030 2014 2024 2020 ID Name Address FENumber Location Size TypeCode Mfg BarCode Last Hydro Next Hydro Last 6 Year Next 6 Year Next Annual Column1 Barwell Rd 3935 Barwell Rd, Raleigh NC 27610 13 Gym Stairs 10 ABC Ansul E83205691 2030 2014 2024 2020 Barwell Rd 3935 Barwell Rd, Raleigh NC 27610 14 Mechanical Room 3 10 ABC Ansul E83205701 2030 2014 2026 2020 Barwell Rd 3935 Barwell Rd, Raleigh NC 27610 15 Mechanical Room 4 10 ABC Ansul E83505707 2030 2014 2024 2020 Barwell Rd 3935 Barwell Rd, Raleigh NC 27610 16 Mechanical Room 8 10 ABC Ansul E83205718 2030 2014 2024 2020 Biltmore Hills Community Center 2615 Fitzgerald Drive Raleigh NC 27610 1 Weight Room 5 ABC Amerex B71723939 2028 2017 2023 2020 Biltmore Hills Community Center 2615 Fitzgerald Drive Raleigh NC 27610 Back room by door 5 ABC Amerex F63847698 2031 2025 2020 Biltmore Hills Community Center 2615 Fitzgerald Drive Raleigh NC 27610 2 Mechanical Room 5 ABC Ansul Sentry Y529658 2022 2016 2020 Biltmore Hills Community Center 2615 Fitzgerald Drive Raleigh NC 27610 3 Kitchen 5 ABC Amerex F63847641 2031 2025 2025 2020 Biltmore Hills Community Center 2615 Fitzgerald Drive Raleigh NC 27610 4 Hallway 10 ABC Ansul E83205692 2030 2014 2023 2020 Biltmore Hills Community Center 2615 Fitzgerald Drive Raleigh NC 27610 5 Boiler Room Outside 5 ABC First Alert ZX893869 2020 2014 2026 2020 Biltmore Hills Community Center 2615 Fitzgerald Drive Raleigh NC 27610 6 Gymnasium 1 5 ABC Amerex B69714945 2028 2021 2020 Biltmore Hills Community Center 2615 Fitzgerald Drive Raleigh NC 27610 7 Gymnasium 2 5 ABC Amerex B69714947 2028 2021 2020 Biltmore Hills Community Center 2615 Fitzgerald Drive Raleigh NC 27610 8 Comfort Station 5 ABC Amerex B07456988 2027 2021 2020 Biltmore Hills Community Center 2615 Fitzgerald Drive Raleigh NC 27610 9 Gymnasium #3 5 ABC Badger B13042753 2028 2022 2020 Biltmore Hills Community Center 2615 Fitzgerald Drive Raleigh NC 27610 10 Gymnasium #4 5 ABC Buckeye C-667897 2021 2015 2027 2020 Borden Building 820 Clay St, Raleigh NC 27605 1 Basement 5 ABC Amerex B07457796 2027 2021 2020 Borden Building 820 Clay St, Raleigh NC 27605 2 Kitchen 5 ABC Amerex F63847677 2031 2014 2025 2020 Borden Building 820 Clay St, Raleigh NC 27605 3 Top Of Stairs 10 ABC Amerex A34404965 2026 2020 2020 Borden Building 820 Clay St, Raleigh NC 27605 4 Attic 5 ABC Amerex A35007908 2026 2020 2020 Brentwood Community Center 2613 Brentwood Rd, Raleigh NC 27604 1 smaller room 5 ABC Ansul Sentry F63847713 2031 2014 2025 2020 Brentwood Community Center 2613 Brentwood Rd, Raleigh NC 27604 2 kitchen 5 ABC Amerex C94639234 2029 2023 2020 Brentwood Community Center 2613 Brentwood Rd, Raleigh NC 27604 3 Meeting Room 5 ABC Buckeye ZY980539 2020 2026 2020 Brentwood Remote Operations 3315 Vinson Ct, Raleigh NC 27604 16 Work Bay 5 ABC Amerex A31327247 2026 2015 2020 2020 Brentwood Remote Operations 3315 Vinson Ct, Raleigh NC 27604 17 Outside Kitchen 10 ABC Amerex ZS488064 2020 2014 2026 2020 Brentwood Remote Operations 3315 Vinson Ct, Raleigh NC 27604 18 Stockroom 10 ABC Amerex ZW940198 2020 2014 2026 2020 Brentwood Remote Operations 3315 Vinson Ct, Raleigh NC 27604 19 Stock Bay 5 ABC Emergi Lite ZS-830712 2020 2014 2026 2020 Brentwood Remote Operations 3315 Vinson Ct, Raleigh NC 27604 20 Office 10 ABC Amerex C99226645 2024 2018 2020 Brentwood Remote Operations 3315 Vinson Ct, Raleigh NC 27604 29 Flammable Storage 10 ABC Amerex E75942360 2029 2023 2020 Buffaloe Rd BRAP 5812 Buffaoe Rd Side Patio 10 ABC Kiddie RA549826 2023 2029 2020 ID Name Address FENumber Location Size TypeCode Mfg BarCode Last Hydro Next Hydro Last 6 Year Next 6 Year Next Annual Column1 Buffaloe Rd 5812 Buffaloe Rd, Raleigh NC 27616 17 Workshop 10 ABC Buckeye BF-378645 2025 2019 2020 Buffaloe Rd 5812 Buffaloe Rd, Raleigh NC 27616 18 Office 10 ABC Ansul ZV606124 2021 2016 2027 2020 Buffaloe Rd 5812 Buffaloe Rd, Raleigh NC 27616 21 Electrical Room 5 ABC Amerex F71943112 2031 2016 2025 2020 Buffaloe Rd 5812 Buffaloe Rd, Raleigh NC 27616 26 Work Shop 10 ABC Amerex 2018 2014 2024 2020 Buffaloe Rd 5812 Buffaloe Rd, Raleigh NC 27616 27 Comfort Station Electrical Room 5 ABC Amerex ZA751219 2022 2028 2020 Buffaloe Rd 5812 Buffaloe Rd, Raleigh NC 27616 New Comfort Station 5 ABC Amerex F71942044 2031 2025 2020 Cabarrus Raleigh NC 1 Top Of Stairs 10 ABC Buckeye J-970370 2021 2015 2027 2020 Cabarrus Raleigh NC 2 Evidence Lobby 10 ABC Buckeye J-970345 2021 2015 2027 2020 Cabarrus Raleigh NC 3 Evidence @ Sign in 10 ABC Buckeye J-970338 2021 2015 2027 2020 Cabarrus Raleigh NC 4 Evidence Hallway Right 10 ABC Buckeye J-970350 2021 2015 2027 2020 Cabarrus Raleigh NC 5 Evidence Hallway Left 10 ABC Buckeye J-970369 2021 2015 2027 2020 Cabarrus Raleigh NC 6 Major Crimes 10 ABC Buckeye J-970341 2021 2015 2027 2020 Cabarrus Raleigh NC 7 Near Squad Room 10 ABC Buckeye J-970344 2021 2015 2027 2020 Cabarrus Raleigh NC 8 Right Hallway 10 ABC Buckeye J-970355 2021 2015 2027 2020 Cabarrus Raleigh NC 9 Near Snack Machine 10 ABC Buckeye J-970356 2021 2015 2027 2020 Cabarrus Raleigh NC 10 Break Room 10 ABC Buckeye J-970351 2021 2015 2027 2020 Cabarrus Raleigh NC 11 Left Hallway 10 ABC Buckeye J-970346 2021 2015 2027 2020 Carolina Pines 2305 Lake Wheeler Rd, Raleigh NC 27603 1 Front Door 5 ABC Buckeye BB-508362 2024 2018 2030 2020 Carolina Pines 2305 Lake Wheeler Rd, Raleigh NC 27603 2 Outside of Kitchen 5 ABC Buckeye BB-508352 2024 2030 2020 Carolina Pines 2305 Lake Wheeler Rd, Raleigh NC 27603 3 Inside Of Kitchen 5 ABC Amerex B02593148 2027 2021 2020 Carolina Pines 2305 Lake Wheeler Rd, Raleigh NC 27603 4 Gymnasium #1 5 ABC Amerex B67395103 2027 2021 2020 Carolina Pines 2305 Lake Wheeler Rd, Raleigh NC 27603 5 Hallway to Storage 147 5 ABC Buckeye BB-508361 2024 2018 2030 2020 Carolina Pines 2305 Lake Wheeler Rd, Raleigh NC 27603 6 Outside of XL Club Room 10 ABC Pyrochem AW634839 2024 2018 2020 Carolina Pines 2305 Lake Wheeler Rd, Raleigh NC 27603 7 Front Mechanical Room 5 ABC Buckeye BB-508365 2024 2018 2020 Carolina Pines 2305 Lake Wheeler Rd, Raleigh NC 27603 8 Back Mechanical Room Outside 5 ABC Buckeye BB-508360 2024 2018 2030 Carolina Pines 2305 Lake Wheeler Rd, Raleigh NC 27603 9 Support Room 10 ABC Amerex RX-901066 2015 2027 1/2023 2021 Carolina Pines 2305 Lake Wheeler Rd, Raleigh NC 27603 10 Side Mechanical Room 5 ABC Amerex B13792453 2027 2021 2020 Carolina Pines 2305 Lake Wheeler Rd, Raleigh NC 27603 11 Gymnasium #2 5 ABC Amerex C94635912 2029 2023 2020 Carolina Pines 2305 Lake Wheeler Rd, Raleigh NC 27603 12 Gymnasium #3 5 ABC Amerex B07461070 2027 2021 2020 Carolina Pines 2305 Lake Wheeler Rd, Raleigh NC 27603 13 Gymnasium #4 5 ABC Amerex B13788463 2027 2021 2020 Carolina Pines 2305 Lake Wheeler Rd, Raleigh NC 27603 14 Gymnasium Storage 5 ABC Amerex A40588152 2027 2021 2020 Central Communications Center 2320 Westinghouse Blvd Raleigh NC 27604 1 RM 1001 10 ABC Badger A00817230 2027 2021 2020 Central Communications Center 2320 Westinghouse Blvd Raleigh NC 27604 2 @420 10 ABC Badger A00817222 2027 2021 2020 ID Name Address FENumber Location Size TypeCode Mfg BarCode Last Hydro Next Hydro Last 6 Year Next 6 Year Next Annual Column1 Central Communications Center 2320 Westinghouse Blvd Raleigh NC 27604 3 @ Stairs 10 ABC Badger A00817208 2027 2021 202 Central Communications Center 2320 Westinghouse Blvd Raleigh NC 27604 4 @ Stairs 10 ABC Badger A00817215 2027 2021 2020 Central Communications Center 2320 Westinghouse Blvd Raleigh NC 27604 5 RM 433 10 ABC Badger A00817207 2027 2021 2020 Central Communications Center 2320 Westinghouse Blvd Raleigh NC 27604 6 @ RM 331 10 ABC Badger A00817229 2027 2021 2020 Central Communications Center 2320 Westinghouse Blvd Raleigh NC 27604 7 Kitchen 10 ABC Amerex B01579147 2027 2021 2020 Central Communications Center 2320 Westinghouse Blvd Raleigh NC 27604 8 @ Stairs 10 ABC Badger A00817224 2027 2021 2020 Central Communications Center 2320 Westinghouse Blvd Raleigh NC 27604 9 @ 334 10 ABC Badger A00817225 2027 2021 2020 Central Communications Center 2320 Westinghouse Blvd Raleigh NC 27604 10 @ 330D 10 ABC Badger A00817209 2027 2021 2020 Central Communications Center 2320 Westinghouse Blvd Raleigh NC 27604 11 @ 330A 10 ABC Badger A00817223 2027 2021 2020 Central Communications Center 2320 Westinghouse Blvd Raleigh NC 27604 12 Hallway 10 ABC Badger A00817217 2027 2021 2020 Central Communications Center 2320 Westinghouse Blvd Raleigh NC 27604 13 @ Stairs 10 ABC Badger A00817205 2027 2021 2020 Central Communications Center 2320 Westinghouse Blvd Raleigh NC 27604 14 RM 224 10 ABC Badger A00817214 2027 2021 2020 Central Communications Center 2320 Westinghouse Blvd Raleigh NC 27604 15 @ Stairs 10 ABC Badger A00817212 2027 2021 2020 Central Communications Center 2320 Westinghouse Blvd Raleigh NC 27604 16 Traffic Control 10 ABC Badger A00817220 2027 2021 2020 Central Communications Center 2320 Westinghouse Blvd Raleigh NC 27604 17 @ Lobby 10 ABC Badger A00817231 2027 2021 2020 Central Communications Center 2320 Westinghouse Blvd Raleigh NC 27604 18 @ Stairs 10 ABC Badger A00817206 2027 2021 2020 Central Communications Center 2320 Westinghouse Blvd Raleigh NC 27604 19 Kitchen 10 ABC Amerex B01579148 2027 2021 2020 Central Communications Center 2320 Westinghouse Blvd Raleigh NC 27604 20 @ 145 10 ABC Badger A00817211 2027 2021 2020 Central Communications Center 2320 Westinghouse Blvd Raleigh NC 27604 21 @ 162 10 ABC Badger A00817213 2027 2021 2020 ID Name Address FENumber Location Size TypeCode Mfg BarCode Last Hydro Next Hydro Last 6 Year Next 6 Year Next Annual Column1 Central Communications Center 2320 Westinghouse Blvd Raleigh NC 27604 22 Hallway 10 ABC Amerex B01552216 2027 2021 2020 Central Communications Center 2320 Westinghouse Blvd Raleigh NC 27604 23 @ Stairs 10 ABC Badger A00814244 2027 2021 2020 Central Communications Center 2320 Westinghouse Blvd Raleigh NC 27604 24 Hallway @ Stairs 10 ABC Badger A00817218 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 1 Rm183 10 ABC Buckeye A34120243 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 2 Bay 29 10 ABC Buckeye A34120272 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 3 RM 179 10 ABC Buckeye A34120271 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 4 Rm 176 10 ABC Buckeye A30574201 2026 2020 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 5 RM 177 10 ABC Buckeye A34120430 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 6 RM 170 10 ABC Buckeye A30574133 2026 2020 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 7 RM 170 10 ABC Buckeye A34120741 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 8 Upstairs Parts Room 10 ABC Buckeye A30574197 2026 2020 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 Upstairs Parts Room 10 ABC Amerex BM445806 2024 2020 Central Operations Facility 2631 Brentwood Road Upstairs Parts Room 20 ABC Amerex C99495843 2023 2029 2020 Central Operations Facility 2631 Brentwood Road Upstairs Parts Room 10 ABC Buckeye BB605457 2024 2030 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 9 RM 195 10 ABC Buckeye A34120576 2027 2030 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 10 RM 196 10 ABC Buckeye A34120585 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 11 RM186 10 ABC Buckeye A34120594 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 12 RM 190 10 ABC Buckeye A34120572 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 13 Administration Office 10 ABC Buckeye A34120571 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 14 Front Lobby 10 ABC Buckeye A34120337 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 15 Hallway Outside Of Restroom 10 ABC Buckeye A34120577 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 16 Break Room 10 ABC Buckeye A34120570 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 17 Hallway @ 165 10 ABC Buckeye A34120593 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 18 Heavy Equipment @ Eyewash 10 ABC Buckeye A34120575 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 19 Hallway Near 124 10 ABC Buckeye A34120569 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 20 RM 125 Bay 8 10 ABC Buckeye A34120579 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 21 RM 125 Bay 7 10 ABC Buckeye A34120596 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 22 Welding Shop 10 ABC Buckeye A30574207 2027 2021 2020 ID Name Address FENumber Location Size TypeCode Mfg BarCode Last Hydro Next Hydro Last 6 Year Next 6 Year Next Annual Column1 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 23 RM 131 Bay 2 10 ABC Buckeye A34120583 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 24 RM 133 10 ABC Buckeye A34120591 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 25 @ RM 134 10 ABC Buckeye A30574190 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 26 RM 134 10 ABC Buckeye A34120598 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 27 @ RM 141 10 ABC Buckeye A34120584 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 28 Upstairs @Radio Shop 10 ABC Buckeye A34120582 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 29 RM 169 10 ABC Buckeye A34120574 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 30 Salt Barn 10 ABC Buckeye A22402164 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 31 Salt Barn 10 ABC Buckeye A22402180 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 32 Salt Barn 10 ABC Buckeye A30574198 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 33 Bay @ Phone 10 ABC Buckeye A30574211 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 34 Bay @ Exit 10 ABC Buckeye A30574015 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 35 Bay 10 ABC Buckeye A34120595 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 36 Wood Shop 10 ABC Buckeye A34120589 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 37 Lube RM 10 ABC Buckeye A22402172 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 38 RM 403 10 ABC Buckeye A30574189 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 39 RM 404 10 ABC Buckeye A22402170 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 40 Hallway @ 225 10 ABC Buckeye A34120737 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 41 RM 235 10 ABC Buckeye A34120300 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 42 Hallway @ 208 10 ABC Buckeye A34120736 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 43 Hallway @ 203 10 ABC Buckeye A34120592 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 44 Hallway @267 10 ABC Buckeye A34120316 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 45 Breakroom 213 10 ABC Buckeye A34114812 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 46 RM 211 10 ABC Buckeye A34114270 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 47 RM 211 10 ABC Buckeye A34120573 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 48 RM 211 10 ABC Buckeye A34120264 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 49 RM 702 10 ABC Buckeye A34120515 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 50 RM 706 10 ABC Buckeye A30574208 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 51 RM 705 10 ABC Buckeye A34120516 2027 2021 2020 ID Name Address FENumber Location Size TypeCode Mfg BarCode Last Hydro Next Hydro Last 6 Year Next 6 Year Next Annual Column1 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 52 Propane Tank 20 ABC Ansul A-32862176 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 53 Upstairs Parts RM at COF 10 ABC Buckeye A30574185 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 54 Natural Gas 20 ABC Buckeye A30574203 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 55 Natural Gas 20 ABC Buckeye A30574205 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 56 Fuel Station 10 ABC Amerex C99495846 2029 2023 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 57 Fuel Station 10 ABC Amerex A30574220 2027 2023 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 58 @RM 805 10 ABC Buckeye A22402175 2029 2023 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 59 Fuel Pumps 10 ABC Buckeye A30574188 2029 2023 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 60 Fuel Pumps 10 ABC Buckeye A30574196 2026 2020 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 61 RM 805 10 ABC Buckeye A22402146 2026 2020 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 62 RM 806 10 ABC Buckeye A22402169 2026 2020 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 63 RM 807 10 ABC Buckeye A22402151 2026 2020 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 64 RM 639 10 ABC Buckeye A34114258 2026 2020 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 65 RM 640 10 ABC Buckeye A22402200 2026 2020 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 66 Hallway @ 636 10 ABC Buckeye A34120588 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 67 RM 624 10 ABC Buckeye A34120601 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 68 RM 625 10 ABC Buckeye A34120600 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 69 Outside @623 10 ABC Buckeye A34120274 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 70 RM 626 10 ABC Buckeye A34120587 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 71 @ RM 640 10 ABC Buckeye A34120578 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 72 RM 623 10 ABC Buckeye A34120273 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 73 RM 623 10 ABC Buckeye A34120268 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 74 Hallway @ 624 10 ABC Buckeye A34120586 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 75 Hallway @ 646 10 ABC Buckeye A34120242 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 76 RM 616 10 ABC Buckeye A34120590 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 77 RM 612 10 ABC Buckeye A34114257 2027 2021 2020 Central Operations Facility 2631 Brentwood Road Raleigh NC 27604 78 Hallway @610 10 ABC Buckeye A34114271 2027 2021 2020 Chavis Carousel 6 503 Martin Luther King Blvd. Raleigh NC 27601 1 Lobby 10 ABC Amerex F70186028 2031 2025 2020 ID Name Address FENumber Location Size TypeCode Mfg BarCode Last Hydro Next Hydro Last 6 Year Next 6 Year Next Annual Column1 Chavis Carousel 6 503 Martin Luther King Blvd. Raleigh NC 27601 2 Middle of Carousel 10 ABC Buckeye BB-632004 2024 2018 2020 Chavis Carousel 6 503 Martin Luther King Blvd. Raleigh NC 27601 3 Beside Office 10 ABC Amerex F70185683 2031 2025 2020 Chavis Carousel 6 503 Martin Luther King Blvd. Raleigh NC 27601 4 Old Carousel 5 ABC Amerex B67422063 2027 2021 2020 Chavis Community Center 505 Martin Luther King Blvd Raleigh NC 27601 1 Media Room 10 ABC Amerex WD271491 2015 2027 2010 2021 2020 Chavis Community Center 505 Martin Luther King Blvd Raleigh NC 27601 2 Lobby 5 ABC Amerex F63847669 2031 2014 2025 2020 Chavis Community Center 505 Martin Luther King Blvd Raleigh NC 27601 3 Art Room 10 ABC Amerex FA864935 2030 2014 2024 2020 Chavis Community Center 505 Martin Luther King Blvd Raleigh NC 27601 4 East Lobby 10 ABC Amerex RX901333 2014 2026 12/2020 2020 Chavis Community Center 505 Martin Luther King Blvd Raleigh NC 27601 5 Dance Room 10 ABC Kidde Metal Head WH698781 2016 2016 2028 2010 2020 Chavis Community Center 505 Martin Luther King Blvd Raleigh NC 27601 6 Maintenance Office 10 ABC Amerex WG460444 2016 2028 2022 2020 Chavis Community Center 505 Martin Luther King Blvd Raleigh NC 27601 7 Kitchen 10 ABC Amerex SW590559 2017 2029 2014 2023 2020 Chavis Community Center 505 Martin Luther King Blvd Raleigh NC 27601 8 Weight Room Outside 10 ABC Amerex SM942437 2014 2026 12/2020 2020 Chavis Community Center 505 Martin Luther King Blvd Raleigh NC 27601 9 Gymnasium Entrance 5 ABC Amerex B10401529 2027 2021 2020 Chavis Community Center 505 Martin Luther King Blvd Raleigh NC 27601 10 Gymnasium Exit 5 ABC Amerex B07461071 2027 2021 2020 Chavis Community Center 505 Martin Luther King Blvd Raleigh NC 27601 11 Boiler Room 5 ABC Ansul Sentry Y528410 2024 2018 2020 Davie St Park 910 Davie Street Raleigh NC 1 Storage Room 5 ABC Badger RU-553708 2013 2025 2016 2022 2020 Davie St Park 910 Davie Street Raleigh NC 2 Mechanical Room 5 ABC Badger E77786095 2030 2016 2024 2020 Durant Nature Park 8305 Camp Durant Rd, Raleigh NC 276014 Fire Bucket 5 ABC Amerex B71725822 2028 2022 2020 Durant Nature Park 8305 Camp Durant SAS Shelter 10 ABC Amerex C99234893 2029 2023 2020 Durant Nature Park 8305 Camp Durant Campbel SM. MECH Room 5 ABC Amerex C94639238 2029 2023 2020 Durant Nature Park 8305 Camp Durant Equiptment Shed 5 ABC Amerex C94647019 2023 2023 2020 Durant Nature Park 8305 Camp Durant EXTRA 5 ABC Buckeye E96333196 2030 2024 2020 Durant Nature Park 8305 Camp Durant Rd, Raleigh NC 276014 1 Left 10 ABC Amerex F70234039 2031 2015 2025 2020 Durant Nature Park 8305 Camp Durant Rd, Raleigh NC 276014 2 Right 10 ABC Amerex F70229363 2031 2015 2025 2020 Durant Nature Park 8305 Camp Durant Rd, Raleigh NC 276014 3 10 ABC Amerex F70234607 2031 2025 2020 ID Name Address FENumber Location Size TypeCode Mfg BarCode Last Hydro Next Hydro Last 6 Year Next 6 Year Next Annual Column1 Durant Nature Park 8305 Camp Durant Rd, Raleigh NC 276014 4 Kitchen 10 ABC Amerex F70233722 2031 2015 2025 2020 Durant Nature Park 8305 Camp Durant Rd, Raleigh NC 276014 5 Training Lodge Fire Pit 5 ABC Amerex BV633813 2031 2025 2020 Durant Nature Park 8305 Camp Durant Rd, Raleigh NC 276014 6 Nature Lodge 10 ABC Ansul Sentry Y607907 2022 2017 2028 2020 Durant Nature Park 8305 Camp Durant Rd, Raleigh NC 276014 7 Tool Shed 10 ABC Amerex L577180 2021 2015 2020 Durant Nature Park 8305 Camp Durant Rd, Raleigh NC 276014 8 2534 Gator 2 1/2 ABC Amerex BX848824 2025 2019 2020 Durant Nature Park 8305 Camp Durant Rd, Raleigh NC 276014 9 1862 Gator 2 1/2 ABC Amerex A33351369 2026 2020 2020 Durant Nature Park 8305 Camp Durant Rd, Raleigh NC 276014 10 Training Lodge W Bed Room 10 ABC KIDDE SJ508469 2014 2026 11/2020 2020 Durant Nature Park 8305 Camp Durant Rd, Raleigh NC 276014 11 Training Lodge SE 10 ABC Amerex A34943964 2026 2020 2020 Durant Nature Park 8305 Camp Durant Rd, Raleigh NC 276014 13 Sycamore Shelter 10 ABC Amerex A34944456 2026 2020 2020 Durant Nature Park 8305 Camp Durant Rd, Raleigh NC 276014 15 Boat House 10 ABC Badger KP825988 2014 2026 11/2020 2020 Durant Nature Park 8305 Camp Durant Rd, Raleigh NC 276014 16 Downstairs 10 ABC Amerex A34946797 2026 2020 2020 Durant Nature Park 8305 Camp Durant Rd, Raleigh NC 276014 17 Downstairs 10 ABC Badger F70234040 2031 2014 2025 2020 Durant Nature Park 8305 Camp Durant Rd, Raleigh NC 276014 19 Training Lodge NW 10 ABC Buckeye JK00345962 2014 2026 11/2020 2020 Durant Nature Park 8305 Camp Durant Rd, Raleigh NC 276014 20 Office 10 ABC Buckeye JL007756994 2014 2026 11/2020 2020 Durant Nature Park 8305 Camp Durant Rd, Raleigh NC 276014 21 Rest Room 10 ABC Amerex A34947568 2026 2020 2020 Durant Nature Park 8305 Camp Durant Rd, Raleigh NC 276014 23 Lower Mechanical Room 10 ABC Amerex B07457790 2027 2021 2020 Durant Nature Park 8305 Camp Durant Rd, Raleigh NC 276014 24 Boat House 10 ABC Amerex CG566580 2026 2020 2020 Durant Nature Park 8305 Camp Durant Rd, Raleigh NC 276014 25 Training Lodge Fire Pit 2 5 ABC Amerex AK931301 2023 2029 2020 Eastgate 420 Quail Hollow Dr, Raleigh NC 27609 1 Meeting Room 10 ABC Ansul Sentry AW845477 2024 2018 2030 2020 Eastgate 420 Quail Hollow Dr, Raleigh NC 27609 2 Kitchen 5 ABC Amerex A31444009 2026 2020 2020 Firing Range 8401 Battle Bridge Rd Raleigh NC 27610 1 Office Entrance 5 ABC Buckeye BL640159 2024 2018 2030 2020 Firing Range 8401 Battle Bridge Rd Raleigh NC 27610 2 Office Exit 5 ABC Buckeye BL690154 2024 2018 2030 2020 Firing Range 8401 Battle Bridge Rd Raleigh NC 27610 3 Training Trailer 10 ABC Ansul Sentry AA255752 2023 2018 2029 2020 Firing Range 8401 Battle Bridge Rd Raleigh NC 27610 4 Shed 2 1/2 ABC Amerex A23020422 2026 2020 2020 Firing Range 8401 Battle Bridge Rd Raleigh NC 27610 5 Office Main Building 10 ABC Buckeye BB616499 2024 2018 2032 2020 Firing Range 8401 Battle Bridge Rd Raleigh NC 27610 6 Armorer Workshop 10 ABC Buckeye AV327546 2024 2018 2030 2020 Firing Range 8401 Battle Bridge Rd Raleigh NC 27610 7 Kitchen 10 ABC Amerex BM978198 2023 2019 2029 2020 Firing Range 8401 Battle Bridge Rd Raleigh NC 27610 8 Side Exit 10 ABC Buckeye BB616510 2024 2018 2030 2020 Firing Range 8401 Battle Bridge Rd Raleigh NC 27610 9 Range Tower 5 ABC Amerex F70934318 2031 2022 2020 ID Name Address FENumber Location Size TypeCode Mfg BarCode Last Hydro Next Hydro Last 6 Year Next 6 Year Next Annual Column1 Firing Range 8401 Battle Bridge Rd Raleigh NC 27610 10 Amm

2 W Edenton St, Raleigh, NC 27601, USALocation

Address: 2 W Edenton St, Raleigh, NC 27601, USA

Country : United StatesState : North Carolina

You may also like

Fire Extinguisher Maintenance Service

Due: 29 Apr, 2024 (Today)Agency: DEPT OF DEFENSE

FIRE EXTINGUISHER MAINTENANCE AND INSPECTION

Due: 30 Sep, 2024 (in 5 months)Agency: VETERANS AFFAIRS, DEPARTMENT OF

ANNUAL AND SEMI-ANNUAL INSPECTION AND CERTIFICATION OF THE ONSITE FIRE ALARM AND SUPPRESSION SYSTEMS.

Due: 31 Jul, 2024 (in 3 months)Agency: NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.