FY24 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD

expired opportunity(Expired)
From: Federal Government(Federal)
W912DR23B0018

Basic Details

started - 18 Oct, 2023 (6 months ago)

Start Date

18 Oct, 2023 (6 months ago)
due - 18 Oct, 2023 (6 months ago)

Due Date

18 Oct, 2023 (6 months ago)
Bid Notification

Type

Bid Notification
W912DR23B0018

Identifier

W912DR23B0018
DEPT OF DEFENSE

Customer / Agency

DEPT OF DEFENSE (709039)DEPT OF THE ARMY (133115)USACE (38131)NAD (5841)W2SD ENDIST BALTIMORE (1366)

Attachments (1)

unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

*** ABSTRACT OF BIDS******************************************************** AMD 0001 10-6-23 *** FY24 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD. The project consists of maintenance dredging approximately 1,400,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between November 2023 through March 2024.The dredging depth varies by channel segment and ranges from 35 feet mean lower low water (ft MLLW) to 50 ft MLLW with an additional 1 foot of allowable overdepth. Approximately 1,000,000 cy will be dredged from the Maryland approach channels (Brewerton Channel Eastern Extension) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 400,000 cy will be dredged from Baltimore Harbor channels (Curtis Bay Channel) and placed at the Cox Creek Dredged Material Containment Facility. The estimated magnitude of construction is between $10,000,000.00 and $25,000,000.00. The work areas are within heavy commercial waterways supporting the Port of Baltimore. The equipment required for this work commonly consists of two 30 plus cubic yard clamshell dredges, one 24 ? 30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 ? 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow and placed within a period of performance of approximately 120 calendar days from receipt of

Baltimore ,
 MD  21201  USALocation

Place Of Performance : N/A

Country : United StatesState : MarylandCity : Baltimore

You may also like

Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead Dredge Rental No. 3-2023

Due: 16 Mar, 2025 (in 10 months)Agency: Louisiana Purchasing Group

FY24 Sabine-Neches Waterway Maintenance Pipeline Dredging

Due: 23 May, 2024 (in 24 days)Agency: DEPT OF DEFENSE

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.

Classification

naicsCode 237990Other Heavy and Civil Engineering Construction
pscCode Z1KFMAINTENANCE OF DREDGING FACILITIES