Floating Concrete Dock System for Riverfront Park West Bank (Design Build)

expired opportunity(Expired)
From: Nashville(City)
233236

Basic Details

started - 10 Oct, 2022 (18 months ago)

Start Date

10 Oct, 2022 (18 months ago)
due - 25 Oct, 2022 (18 months ago)

Due Date

25 Oct, 2022 (18 months ago)
Bid Notification

Type

Bid Notification
233236

Identifier

233236
Nashville

Customer / Agency

Nashville
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Notice of Intent to Award Solicitation Number Award Date Solicitation Title Buyer Name Buyer Email BAO Rep BAO Email Awarded Supplier(s) In reference to the above solicitation and contingent upon successful contract negotiation, it is the intent of the Metropolitan Government of Nashville and Davidson County to award to the following supplier(s): Company Name Company Contact Street Address City State Zipcode Company Name Company Contact Street Address City State Zipcode Company Name Company Contact Street Address City State Zipcode Certificate of Insurance The awarded supplier(s) must submit a certificate of insurance (COI) indicating all applicable coverage required by the referenced solicitation. The COI should be emailed to the referenced buyer no more than 15 days after the referenced award date. Equal Business Opportunity Program Where applicable, the awarded supplier(s) must submit a signed copy of the letter of intent to perform for any and all minority-owned (MBE) or
woman-owned (WBE) subcontractors included in the solicitation response. The letter(s) should be emailed to the referenced business assistance office (BAO) rep no more than two business days after the referenced award date. _____Yes, the EBO Program is applicable. _____No, the EBO Program is not applicable. Monthly Reporting Where applicable, the awarded supplier(s) will be required monthly to submit evidence of participation and payment to all small (SBE), minority-owned (MBE), women-owned (WBE), LGBT-owned (LGBTBE), and service disabled veteran owned (SDV) subcontractors. Sufficient evidence may include, but is not necessarily limited to copies of subcontracts, purchase orders, applications for payment, invoices, and cancelled checks. Questions related to contract compliance may be directed to the referenced BAO rep. _____Yes, monthly reporting is applicable. _____No, monthly reporting is not applicable. Public Information and Records Retention Solicitation and award documentation are available upon request. Please email the referenced buyer to arrange. A copy of this notice will be placed in the solicitation file and sent to all offerors. Right to Protest Per MCL 4.36.010 – any actual or prospective bidder, offeror, or contractor who is aggrieved in connection with the solicitation or award of a contract may protest to the purchasing agent. The protest shall be submitted in writing within ten (10) days after such aggrieved person knows or should have known of the facts giving rise thereto. ______Supervisor (Initial) _____________________________________ Michelle A. Hernandez Lane Purchasing Agent & Chief Procurement Officer 233236 Floating Concrete Dock System for Riverfront Park West Bank (Design Build) Brad Wall brad.wall@nashville.gov Joe Ann Carr joeann.carr@nashville.gov Dowdle Construction Group LLC Chase Manning 150 Athens Way Nashville TN 37228 ✔ ✔ DocuSign Envelope ID: D318664D-2FFE-4819-8197-38C94B82E215 10/25/2022 | 2:23 PM CDT Dowdle Construction Group LLC Contract Acceptance Offeror proposed contract exceptions Cost (35 Points) 35.00 Firm Qualifications and Experience (30 Points) 25.00 Team Structure and Team Qualifications (10 Points) 10.00 Capacity to Perform (15 Points) 12.00 Project Approach and Risk Mitigation (10 Points) 8.00 Total (100 Points) 90.00 RFQ #233236 ‐ Floating Concrete Dock System for Riverfront Park West Bank (Design Build) Dowdle Construction Group LLC Strengths ‐ The offeror’s team demonstrated experience with designing and installing floating concrete docks in a river environment. The offeror provided a detailed organizational chart that demonstrated the team structure. The offeror’s resumes were adequate. The offeror provided a detailed approach for maintaining a safe work environment. The offeror's general management plan adequately addressed the procedures in accordance with Metro's guidelines. The offeror provided a detailed safety plan. The offeror identified risks anticipated on this project along with providing countermeasures to mitigate the identified risk. Weaknesses ‐ The offeror’s proposal didn’t demonstrate experience in the demolition and disposal of floating concrete docks in a river environment. Most the offeror’s reference projects were not of similar size and scope to what Metro is seeking. The offeror demonstrated only one project (Riverwalk Public Dock) that was of similar size and scope to what Metro is seeking in the resulting contract. The offeror failed to demonstrate reference projects completed within the past five (5) years. The offeror failed to provide contact information for their reference projects. The offeror failed to provide a schedule comparison demonstrating the original schedule and actual completed schedule for their reference projects. The offeror’s proposal lacked detail in their capacity and ability to install a floating concrete dock system in a river environment. The offeror’s proposal lacked project specific information to demonstrate their knowledge of the project objectives and goals. DocuSign Envelope ID: D318664D-2FFE-4819-8197-38C94B82E215 Enter Solicitation Title & Number Below Floating Concrete Dock System for Riverfront Park West Bank (Design Build); RFQ #233236 Min. SBE/SDV Requirement Total Cost Points 6.00% 35.00 Offeror's Name Bids RFP Cost Points Dowdle Construction Group LLC $1,252,942.28 35.00 DocuSign Envelope ID: D318664D-2FFE-4819-8197-38C94B82E215 The following MWBE* subcontractor(s)/supplier(s) will be utilized for the performance of this project: MBE/WBE Firm Name MBE/WBE Firm Address Phone/E‐Mail Certificate Type (MBE or WBE) * MBE/WBE Group Type * Code # UNSPS/NAICS Description of Work MBE/WBE Dollars ($) Percent of Total Contract 1 2 3 4 5 6 7 ___________________% $_______________ ___________________% $_______________ ___________________% $_______________ EBO Goal Met? (Y/N) *Note: MWBE is defined as business enterprise maintaining a significant business prescience in the Program Area & performing a commercial useful function that is owned by one or more of the following: (1) African Americans (2) Native Americans, (3) Hispanic Americans, (4) Asian Americans, and (5) Women. Solicitation #: Statement of M/WBE Utilization Proposer's/Firm's Name: Solicitation Title: Proposed EBO Goal (%): MBE% WBE% I am the duly authorized representative and certify the facts and representations contained in this form and supporting documents are true and correct. Authorized Representative (Printed Name/Title/Signature) Date Proposer's Phone #: Proposer's Email Address: Amount Self‐performed : Proposer's/Firm's Ownership: Total Bid Amount: BAO Representative: Total MBE Subcontracting Total WBE Subcontracting Total MBE/WBE Participation: For Internal Office Use ONLY Has Prime Complied with EBO Goal? If No, Good Faith Efforts Met? ____________________ Project Manager: Date:Metro Buyer: BAO Notes: _____________________ Dowdle Construction Group, LLC 615-251-1311 Floating Concrete Dock System for Riverfront Park West Bank (Design Build) gdowdle@dowdleconstruction.com 233236 0 Non-M/WBE $247,844 6 3 NO Bozman Sign 862 Easthagan Drive, Nashville, TN 37217 615-331-0805 WBE Select 551217 Signage $1,619,.65 .65 Aerial Innovations 202 South 17th St, Nashville, TN 37206 615-650-2002 WBE Select 82131601 Photography $928.63 .37 Select Select Select Select Select Select Select Select Select Select Glynn Dowdle, Principal Glynn Dowdle 08/24/2022 NO YES JoeAnn Carr Brad Wall Chase Adams 08/17/22 0 0 1.02 2548.28 1.02 2548.28 This is for design.The awardee must submit the trade packages and GMP to the BAO Representative before the construction phase can begin to establish the construction goal with the trade packages. DocuSign Envelope ID: D318664D-2FFE-4819-8197-38C94B82E215 RFQ#233236 SBE Assessment.xls Page 1 Date: 10/24/2022 Primary Contractor* Prime Bid Amount Total Proposed SBE ($) SBE Subs approved? SBE (%) Dowdle Construction Group $247,844.00 $112, 845.00 Yes 46% Project Name: Floating Concrete Dock System for Riverfront Part West Bank (Design Build) Department Name: Parks Design Only;The proposer is a Metro-approved SBE and proposes to self-perform 44.50% of the work and has proposed approved SBE(s); Aerial Innovations @ .37% and Bozman Signs @ .65%. BAO Small Business Assessment Sheet Comments BAO Specialist: JoeAnn Carr Contract Specialist: Brad Wall RFP/ITB Number: 233236 DocuSign Envelope ID: D318664D-2FFE-4819-8197-38C94B82E215

730 SECOND AVENUE, SOUTH, SUITE 112, NASHVILLE, TENNESSEE 37210Location

Address: 730 SECOND AVENUE, SOUTH, SUITE 112, NASHVILLE, TENNESSEE 37210

Country : United StatesState : Tennessee

You may also like

7827 Firewood for L.L."Stub" Stewart Memorial State Park

Due: 05 Jul, 2024 (in 2 months)Agency: Gary Davies

INSTALLATION OF FLOATING DOCK

Due: 31 Aug, 2024 (in 4 months)Agency: NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.