Zaragoza Street, East of Tarragona Street, Roadway Improvements

expired opportunity(Expired)
From: Pensacola(City)
ITB-24-021-0-2024/RD

Basic Details

started - 01 Mar, 2024 (1 month ago)

Start Date

01 Mar, 2024 (1 month ago)
due - 01 Apr, 2024 (26 days ago)

Due Date

01 Apr, 2024 (26 days ago)
Bid Notification

Type

Bid Notification
ITB-24-021-0-2024/RD

Identifier

ITB-24-021-0-2024/RD
City of Pensacola

Customer / Agency

City of Pensacola
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

This project is for modifications to Zaragoza Street adjacent to the UWF-Historic Pensacola Village property and will include construction of a speed table at a pedestrian crossing. The project will also include construction of “bulb-out” landscaped curb extensions along the south side of Zaragoza Street to create protected parallel-parking zones. Sidewalks at the intersection of Tarragona and Zaragoza Streets will be modified to meet ADA requirements. Newly created green spaces will be landscaped. The contractor will be responsible for maintenance of traffic (MOT) when applicable as work will be performed in the roadway. The LS Maintenance of Traffic item shall include all signs, devices and other cost associated with maintaining traffic during the project. While not anticipated or required, contractor may elect to perform portions of this project as night work. Care shall be exercised to not cause any damage to adjacent infrastructure being left in-place during reconstruction. Any such damage shall be the responsibility of the contractor. All grade work and elevations shall reflect the design information provided in the construction plans. All proposed line and grade work shall be approved by the City Inspector. Contractor’s work shall include the necessary coordination of all existing utilities with respective owners and to timely address any potential conflicts with required work. All sod placed shall be properly watered and maintained until permanently rooted/established to the satisfaction of the City. Maximum access shall be provided to the property and business owners at all times during construction. Due to the nature of the project, it is required that bidders visit the site and thoroughly review the plans and specifications. All work shall be in accordance with the standards and specifications of the City of Pensacola.Show

222 W Main St, Pensacola, FL 32502, USALocation

Address: 222 W Main St, Pensacola, FL 32502, USA

Country : United StatesState : Florida

You may also like

Walker Road, West Frazior Street, and Washington Street Reconstruction

Due: 09 May, 2024 (in 11 days)Agency: Hayter Engineering Inc

Firth, NE; May Street Improvements 2024

Due: 02 May, 2024 (in 4 days)Agency: Carroll Boone Water District

West Beverley Street Sidewalk Improvements & VDOT SGR Repaving

Due: 16 May, 2024 (in 18 days)Agency: City of Staunton

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.