The following brief synopsis does not include all of the work required to complete the project. The contractor will be responsible for all labor, tools, equipment and materials to construct a new Gun Locker Room, Armory and Mechanical Room along with a new Curtain Wall to increase the Front Lobby square footage. The major items of construction will include: Class B walls surrounding the new Gun Locker Room and Armory and in some cases a Class B ceiling/roof system; New doors, frames and hardware; Finishes including paining, floor sealer and base; New individual Gun Lockers installed in the Gun Locker Room along with a Pistol Unloading Station; Mechanical system comprising of an air handling unit and associated piping and controls to condition the Lobby, Gun Locker Room and Armory; Modification of and installation of a new fire sprinkler piping and head; Fire alarm system modifications; Electrical system including power to mechanical equipment, lighting and convenience outlets; and Security stems shall include electrified door hardware, intercom system and
Location
Place Of Performance : N/A
Country : United StatesState : IllinoisCity : Chicago