Fort Ord Military Reservation Property Deconstruction and Demolition Project Phase 1A

expired opportunity(Expired)
From: Seaside(City)

Basic Details

started - 04 May, 2022 (about 2 years ago)

Start Date

04 May, 2022 (about 2 years ago)
due - 20 May, 2022 (23 months ago)

Due Date

20 May, 2022 (23 months ago)
Bid Notification

Type

Bid Notification

Identifier

N/A
City of Seaside

Customer / Agency

City of Seaside
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

CITY OF SEASIDEFort Ord Military Reservation PropertyDeconstruction and Demolition ProjectPhase 1Alocated nearLightfighter Drive in Seaside, CA1.02 Project Description: This project includes the work to furnish all labor, services, material, tools, equipment, supplies, transportation, utilities, skills, and all other items and facilities necessary for the completion of the Fort Ord Military Reservation Property Deconstruction and Demolition Project. The Work generally consists of decontamination, deconstruction, demolition, removal, and proper disposal of all buildings, structures, parking lots, improvements, and select trees, shrubs, bushes, and vegetation at the Visitor Center (2,100 feet² building/structure) and adjacent parking lot (25,392 feet²). The deconstruction and demolition work shall include removal and disposal of the subject structures in their entirety to include roof structures, exterior walls, interior walls, concrete slabs and foundations, windows, doors, plumbing, mechanical, communications, and electrical systems. The site work includes removal and disposal of asphalt concrete parking lots, concrete, retaining walls, steps, excavation and backfill/fill, disconnection, capping, removal, and disposal of water, wastewater, gas, and electrical utilities, and rough grading for mitigating safety concerns and facilitating drainage. The Work includes hazardous materials removal and proper disposal, including asbestos, lead-based paint and/or materials, lead-containing paint, universal waste, suspect polychlorinated biphenyls (PCBs), and other hazardous materials. The Visitor Center and Project footprint also includes asbestos cement pipe (ACP) on-site and below-grade. Lastly, the Work includes soil sampling and soil remediation, which is contains arsenic, hexavalent chrome, cobalt, and lead, and must be properly excavated, isolated, stockpiled, characterized (waste), and removed and disposed of at an appropriate

440 Harcourt Avenue Seaside, CA 93955Location

Address: 440 Harcourt Avenue Seaside, CA 93955

Country : United StatesState : California

You may also like

CN 2022 Lagunitas Creek Coho Habitat Enhancement Project – Phase 1A

Due: 07 May, 2024 (in 7 days)Agency: Marin Water

Demolition at Lake Hazel Middle School-Phase I of TI Project

Due: 30 Apr, 2024 (Tomorrow)Agency: West Ada School District

BC-C-23-004 - Bergen County Rockleigh Property Demolition Project

Due: 03 May, 2024 (in 3 days)Agency: Bergen County

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.

Classification

Construction Projects