Squadron Operations Building Addition and Alteration

expired opportunity(Expired)
From: Federal Government(Federal)
W50S6N23B0003

Basic Details

started - 12 Apr, 2023 (12 months ago)

Start Date

12 Apr, 2023 (12 months ago)
due - 06 Apr, 2023 (13 months ago)

Due Date

06 Apr, 2023 (13 months ago)
Bid Notification

Type

Bid Notification
W50S6N23B0003

Identifier

W50S6N23B0003
DEPT OF DEFENSE

Customer / Agency

DEPT OF DEFENSE (710210)DEPT OF THE ARMY (133283)NGB (17533)W7MT USPFO ACTIVITY ALANG 187 (144)

Attachments (15)

unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

PURPOSE OF THIS IS TO UPLOAD THE ABSTRACT (OF 1419) AND THE BID OPENING ATTENDANCE SIGN IN SHEET.Project scope includes sitework, subgrade excavation, building foundations, structural, architectural, plumbing, mechanical, electrical and relocation of existing utilities for a new two-story addition to an existing facility (Building 1303) and associated sitework per the contract documents. The proposed project includes the following:1. Vertical construction will consist of addition and renovation to one existing Facility. Construct an approximate 3,300 square foot addition housing the Base's Squadron Operations Functions specific to the F-35. Within the new addition, special facilities include secure and non-secure o􀀂ice space, storage space, secure storage room and expanded performance element. The renovation scope will be approximately 1,300 square feet of modification to serve the functions specific to the F-35. Within building 1303, special facilities include reconfiguration of
non-secure office, training, and storage spaces. Modifications to secure spaces are limited to power, data, and security modifications. One existing non-secure area will be converted into a separate dedicated secure working area.Project shall include three bid options:Bid Option 1: Generator – Provided and install a new 300KW diesel generator.Bid Option 2: Landscape Furniture – Install architectural bench seating in exterior area.Bid Option 3: Dumpster Concrete and Enclosure.Brand Name/Sole Source Requirements:- Johnson Controls: The project will consist of installation of new heating, ventilating, and air conditioning systems throughout the addition to the facility. This will include new Direct Digital Controls.- Monaco: The project includes installing a fire suppression system to include a new fire alarm system.- Stanley Best Access Systems-Locks: There will be a replacement of a majority of the interior and exterior doors that will require new cores/locks.- Advantor: The project will be upgrading security measures to meet new requirements.- Moduline Plank Pavers (belgard.com): This project includes a portion of a Pedestrian Concourse. This Pedestrian Concourse will be constructed with pavers.

Montgomery ,
 AL  36108  USALocation

Place Of Performance : N/A

Country : United StatesState : AlabamaCity : Montgomery

You may also like

MUNICIPAL BUILDING AND POLICE HEADQUARTERS ADDITION AND ALTERATIONS

Due: 30 May, 2024 (in 28 days)Agency: Boonton Township

Classification

naicsCode 236220Commercial and Institutional Building Construction
pscCode Y1AZCONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS