Concourse A - Condenser Water Loop

expired opportunity(Expired)
From: Charlotte(City)
AVIA 20-32

Basic Details

started - 27 May, 2020 (about 3 years ago)

Start Date

27 May, 2020 (about 3 years ago)
due - 11 Jun, 2020 (about 3 years ago)

Due Date

11 Jun, 2020 (about 3 years ago)
Bid Notification

Type

Bid Notification
AVIA 20-32

Identifier

AVIA 20-32
Aviation

Customer / Agency

Aviation
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Description:Please use this link to access all documents related to this solicitation:
https://bidders.e-builder.net/landing?bidpackageid=98b1ae81-5914-4c9f-b9cb-38b0990e4c45

This will be a turnkey project to build a complete Condenser Water Loop as designed by AME Consulting Engineers. The system will be designed using a shell and tube heat exchanger connected to the Airport’s Central Chiller Plants, chilled water piping, to provide tempered condenser water for the food concessions, water cooled, condensing units on walk-in cooler and freezers and ice machines. The system loop will be able to provide water at a temperature between the ranges 60 to 85 degrees Fahrenheit and provide a water flow rate from (0-45 GPM) Gallons -per

600 East Fourth Street, 9th Floor Charlotte, NC 28202Location

Address: 600 East Fourth Street, 9th Floor Charlotte, NC 28202

Country : United StatesState : North Carolina

You may also like

Boiler & Chilled Water Chemical Treatment Service (CH2O)

Due: 30 Sep, 2024 (in 5 months)Agency: CH2O, Inc.

Atlantium UV Water Technologies

Due: 30 Sep, 2027 (in about 3 years)Agency: University of Wisconsin-Madison

THIS IS FOR THE REPLACEMENTS OF THE CHILL WATER AND CONDENSER PUMP AT THE DECONCINI LPOE.

Due: 30 Sep, 2024 (in 5 months)Agency: PUBLIC BUILDINGS SERVICE

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.