Architect-Engineer Multiple Award Contract (AE-MAC)Synopsis/Solicitation: 140A1623R0013Amendment: 00003The purpose of this amendment is the following:1. Provide answers to the timely questions received in response to the synopsis/solicitation.2. Make the following revisions to Section 3, Submittal Requirements, of the synopsis/solicitation:a. Interested firms having the capabilities to perform this work must submit one (1) electronic copy with searchable Adobe PDF files of an SF 330 for the Prime firm that includes all team consultants. Include the firm's UEI number in the SF 330, Part I, Sections B and C. A maximum of five (5) projects for the proposed team, including JV and teaming partners, shall be shown in Section F. For the five (5) projects submitted in Section F of the SF 330, a "project" is defined as a single contract or task order for work performed at one site/installation or multiple sites/installations. An IDIQ contract is not a project. A project may contain multiple task orders or contracts if they are for multiple phases of a project at the site(s)/installation(s). Each project in Section F of the SF 330 shall include the contract number, task order number, cost of work performed by firm, and owner's contact information. Project descriptions shall clearly state extent of work performed by the team, percent of work completed, dates when work was performed, and date of contract completion. Project A/E work must be 100% complete for consideration.b. The SF 330 shall have a total page limitation of 60 printed pages with Section H limited to eight (8) pages, and Part II is excluded from the 60-page limit. For all SF 330 sections, use no smaller than 11 pt. font. Solicitation packages are not provided. This is not a request for proposal. No pricing information is to be included. Any pages that exceed the page limitations noted will not be evaluated, nor considered.3. All other terms and conditions remain