Joe Gulley Walking Trail Milling and Overlay Joe Gulley Park 391 Bellaire Bivd. Kenedy, TX. 78119 Project limits are approximately 60,750 SQ FT of the existing walking trail. Project is going to consist of a 2 mill/planing and 2 overlay, and to recompact or replace existing base as needed. Prime tack shall be applied to all base and concrete surfaces and edges for bonding. Asphalt Paving will have a Prime Tack and pave Type D HMA Price will include one-time mobilization Traffic control will be required with the proper signage throughout the project limits, and detouring traffic as needed while construction work is being performed. Contractor will be responsible for cleaning up all project materials and parking equipment ina safe location at the end of each day. ITEM 8: PROSECUTION AND PROGRESS For this project, working day charges will be charged in accordance with Article 8.3.1.4, Standard Workweek. Placement of traffic control devices will not commence until after the start time and