Construction of a Nutrient Reduction Wetland. In general, the work involves, but is not limited to, selective clearing, excavation, grading, steel sheet pile weir construction, tile installation, CMP water control structure, and seeding. This project includes around 20,320 cubic yards of earthwork, 2,188 square feet of steel sheet pile, 135 linear feet of tile installation, 430 tons of crushed stone, 85 cubic yards of grout, and 8.2 acres of seeding. The estimated construction cost range for this project is $300,000 to $350,000.