Photovoltaic System Planning, Design, and Construction Support

expired opportunity(Expired)
From: Port of Bellingham(Port)
RFPS 23-2

Basic Details

started - 11 Apr, 2023 (12 months ago)

Start Date

11 Apr, 2023 (12 months ago)
due - 09 May, 2023 (11 months ago)

Due Date

09 May, 2023 (11 months ago)
Bid Notification

Type

Bid Notification
RFPS 23-2

Identifier

RFPS 23-2
Port of Bellingham

Customer / Agency

Port of Bellingham

Attachments (2)

unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

REQUEST FOR PROFESSIONAL SERVICESPHOTOVOLTAIC SYSTEM PLANNING, DESIGN, AND CONSTRUCTION SUPPORTVARIOUS LOCATIONSThe Port of Bellingham (Port) has issued this Request for Professional Services (RFPS) to solicit written responses from qualified professional teams interested in providing support with the planning, design, permitting, and implementation of photovoltaic energy projects.The Port intends to issue an Indefinite Delivery, Indefinite Quantity (IDIQ) contract with a period of three years. The Port, at its sole discretion, may choose to renew the contract at the end of the initial three-year period. It is anticipated that, at a minimum, the successful respondent team will be tasked with completing two photovoltaic feasibility studies and two photovoltaic system designs as described below in Sections A and B; however, additional, similar projects may be added through amendments to the agreement.Additional, similar projects may include planning, design, permitting, and
implementation of various renewable energy systems throughout Port properties as described in Section C. The awarded respondent team will be given a fair opportunity to be considered for additional, similar projects issued during the life of the contract.It is anticipated the successful respondent team(s) will have experience and expertise with the following project elements:Photovoltaic Feasibility StudiesProject Management: Scheduling, contract administration, leading a multiple-discipline team, and coordination with consultant team, owner, regulatory agencies, and project stakeholders.Structural Analysis: Evaluation of existing structures for allowable load increases based on code requirements, existing conditions, and recommended structural improvements.Architectural Analysis: Evaluation of existing roof condition and recommendations for necessary repair, or replacement prior to installation of photovoltaic system.Electrical Analysis: Recommendations for number/size of panels, orientation of array, anticipated production capacity, and any required electrical improvements. Includes evaluation of current loads for net metering.Economic Analysis: Economic analysis of project payback period. Cost estimating for recommended system and associated improvements. Identify opportunities for grant funding, tax incentives, and partnerships with electric utilities.Deliverables: Written report outlining findings from each of the above-mentioned tasks, including budget level design and construction cost estimate.Potential Project Locations: Blaine Harbor Webhouse 2-3, International Trade Building, Squalicum Harbor Webhouses 1-5.Photovoltaic System Design and PermittingProject Management: Scheduling, contract administration, leading a multiple-discipline team, and coordination with consultant team, owner, regulatory agencies, and project stakeholders.Structural DesignArchitectural DesignElectrical DesignPublic Works BiddingPermittingConstruction Cost EstimatingPotential Project Locations: Blaine Harbor Webhouse 1, Harbor Center Building, Marina Square Building.Potential Future ProjectsAdditional Photovoltaic Feasibility StudiesAdditional Photovoltaic System Design and PermittingConstruction SupportGround Mount System DesignBattery Storage System DesignOther Renewable Energy Systems

4255 Mitchell Way Suite 206 Bellingham, Washington 98227Location

Address: 4255 Mitchell Way Suite 206 Bellingham, Washington 98227

Country : United StatesState : Washington

You may also like

Flood Mitigation – Misc. Underground Upgrades Construction

Due: 15 May, 2024 (in 16 days)Agency: Regional Municipality of Wood Buffalo

OTHER CONSTRUCTION, REPLACE GENERATOR PROJECT

Due: 03 May, 2024 (in 4 days)Agency: NATIONAL PARK SERVICE

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.

Classification

Professional Services