Details ID: 341-011 #1 A & B Estimate: 2,100,000 Type: Improvements to Water Plant No. 1 & 2 Owner: Mission Bend M.U.D No. 2 Location Harris County, TX Map Code: Show Google Map Open Map On Google No Map Scope Work under this Contract includes, but is not limited to the following: Demolition and replacement of existing booster pump station and pump supports, removal and replacement of valves, fittings, supports, and waterlines of various sizes, installation of reinforced sidewalk pavement, installation of two (2) natural gas generators and associated platforms and foundation system’s, site improvements, removal and relocation of existing wooden fence, and miscellaneous electrical improvements throughout two (2) water plants within the District Pre-Bid Details Date: 4/20/2023 Time: 10:00 AM Location: 1080 W. Sam Houston Pkwy N., Suite 200, Houston, TX 77043 Notes: Mandatory Pre-Bid Meeting will be held in the LEI Conference Room Bid Details Date: 5/09/2023 TBA Time: 3:00 PM CST Location: 1080 W. Sam Houston Pkwy N., Suite 200, Houston, TX 77043 Notes: Bid Opening will be held in the LEI Conference Room Contact Address Langford Engineering, Inc. 1080 W. Sam Houston Pkwy. N. Houston, Texas 77043
https://www.langfordeng.com/ Contact Info Contact: Norman Gutierrez Phone: 713-461-3530 Fax: Email:
norman.g@langfordeng.com Bid Package Notes Two (2) sets of plans will be uploaded for this project, one (1) per water plant. Additional