Sources Sought 15kV Switchgear & Station Service Replacement at Lake Tenkiller, OK

expired opportunity(Expired)
From: Federal Government(Federal)
W912BV24S0002

Basic Details

started - 03 Oct, 2023 (6 months ago)

Start Date

03 Oct, 2023 (6 months ago)
due - 02 Nov, 2023 (5 months ago)

Due Date

02 Nov, 2023 (5 months ago)
Bid Notification

Type

Bid Notification
W912BV24S0002

Identifier

W912BV24S0002
DEPT OF DEFENSE

Customer / Agency

DEPT OF DEFENSE (709038)DEPT OF THE ARMY (133115)USACE (38131)SWD (3867)US ARMY ENGINEER DISTRICT TULSA (1113)

Attachments (1)

unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

The work includes Replace the three existing 15kV switchgear lineups for the generator breakers and station service transformer feeder breakers.• Removal of existing 500 kVA, 13.8 kV/480V station service transformer• Removal of existing 15 kV switchgear and breakers located beneath control room• Removal of 480V station service switchgear in control room• Removal of the existing 15kV cables to the switchyard• Removal of existing potheads for the 15kV cable transition to switchyard bus• Removal of the existing asbestos cable trays containing 15kV cables in cable tunnel• Installation of new 15kV cables to the switchyard• Installation of new potheads for the 15kV cable transition to switchyard bus• Installation of new cable trays containing the new 15kV cables in cable tunnel• Installation of front accessible double-ended 480V switchgear beneath control room with feedercircuit breakers• Installation of 15kV switchgear with new vacuum circuit breakers and redundant 500 kVA13.8kV/480V, high-resistance grounded wye station service transformers• Reconfiguration of project diesel generator to wye-grounded with high-resistance groundingresistor.• New control and annunciation wiring for new 480V and 15kV switchgear where existing cablesare not reused.• Modifications to protective relay settings and new protection relays for the new station servicefeeders.• Automatic transfer functionality for the 480V switchgear main & tie breakers, along with local arcflash mitigation switches.• Replacement and relocation of existing Lighting

Gore ,
 OK  74435  USALocation

Place Of Performance : N/A

Country : United StatesState : OklahomaCity : Gore

You may also like

4262-10-24 Lee County Switchgear and Generator Replacement

Due: 21 May, 2024 (in 22 days)Agency: Lee County

24-13 Ketchikan Lakes Power and Communications Design and Engineering Services

Due: 24 May, 2024 (in 25 days)Agency: City of Ketchikan

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.

Classification

naicsCode 238210Electrical Contractors and Other Wiring Installation Contractors
pscCode N061Installation of Equipment: Electric Wire, and Power and Distribution Equipment