The work consists of furnishing all plant, labor, materials and equipment, and repainting the bridgesuperstructure and bearings of the Blakely Mountain Dam Intake Structure Service Bridge in Garland County, Arkansas.Principal features of work include mobilization and demobilization, abrasive blasting, repainting of bridge, and environmentalprotection. The estimated value of the proposed work is between $250,000 and $500,000. Drawings are forthcoming. An amendment has been issued to reflect the provision for the site