Coal Creek Fish Passage Construction

From: Washington State Office of Minority and Women(State)

Basic Details

started - 20 Mar, 2024 (1 month ago)

Start Date

20 Mar, 2024 (1 month ago)
due - 01 May, 2024 (in 1 day)

Due Date

01 May, 2024 (in 1 day)
Bid Notification

Type

Bid Notification

Identifier

N/A
Trout Unlimited

Customer / Agency

Trout Unlimited

Attachments (1)

unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Project overview: Trout Unlimited is seeking a contractor to provide equipment, labor, and materials to remove a fish passage barrier culvert and one additional culvert from a private road crossing of Coal Creek. The crossing will be replaced with a 24-foot-long x 12’-6” wide, pre-engineered, and prefabricated concrete bridge planks, abutment wall, wingwalls, and bridge sills. Description of Project: Coal Creek Fish Passage Restoration Project The project includes the following elements: • Removing one 36" dia. x 26' long concrete culvert with cmp extension section and one 24” x 20’ long cmp along with associated fill material from a private road crossing of Coal Creek. • Replacing the crossing with a 24-foot-long x 12’-6” wide, pre-engineered, and prefabricated concrete bridge planks, abutment wall, wingwalls, and bridge sills • Reconstructing a natural stream channel through the crossing • Placing streambed gravel mix on the re-grade slopes beneath the bridge. • Reconstructing the
paved driveway approach roadway to new bridge and to improve drainage runoff away from the creek. This project is funded by the Salmon Recovery Funding Board; PRISM #22-1132. Specifications, and other pertinent information please contact the contracting project manager, Alex Gustafson, alex.gustafson@tu.org Project Timeline: The anticipated ‘in-water work window’ for this project is August 1 – August 31, 2024. The contractor will have approximately two months to complete the scope of work, with a project deadline estimated for September 30, 2024. The selected contractor will provide a written schedule of work during the contract execution process. https://acrobat.adobe.com/id/urn:aaid:sc:VA6C2:184b3276-4196-45ab-8d1f-3... Closing Date: Wednesday, May 1, 2024Organization: Trout UnlimitedPoint of Contact: alex.gustafson@tu.org

OMWBE 1110 Capitol Way South, Suite 150 Olympia, Washington 98501Location

Address: OMWBE 1110 Capitol Way South, Suite 150 Olympia, Washington 98501

Country : United StatesState : Washington

You may also like

Coal Creek Fish Passage Construction

Due: 01 May, 2024 (in 1 day)Agency: Ben Franklin Transit

Beaver Creek Exterior

Due: 17 May, 2024 (in 17 days)Agency: Housing and Human Services

Walsh RFP for WSDOT I-90 & SR 900 Fish Passage

Due: 01 May, 2024 (in 1 day)Agency: Walsh Construction Company II, LLC

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.