This amendement is to update the SOW and Final Diagram of the conveyor system at the JMMT. The new closing is 22 April 2024 @1:00PM KST. _____________________________________________________________The contractor shall install and assemble the heavy-duty expandable conveyor system at the Joint Military MaitTerminal (JMMT) in Incheon Airport. The contractor shallremoval old conveyor system and disposal of the old system itaccording to Republic of Korea guidance.Material Compliance: The contractor shall be responsible to ensure all materials used in performance of this contract meet the specifications and requirements of this contract. All material(s) shall be new and standard product of a manufacture who is regularly engaged in the manufacturing of such products.Delivery: The contractor shall deliver the heavy-duty expandable conveyor system to Joint Military Mait Terminal (JMMT) at Incheon Airport,