Water Treatment Plant Improvements Project Description :The scope of Work for this tender will include, but shall not be limited to: - Common Excavation 550 m3 - Concrete Pad (reinforced; 0.18 m thick concrete, 0.15 GBC) 145 m2 - Supply and Installation – Distribution Pump 2 units - Supply and Installation – Backwash Supply Pump 1 unit - Supply and Installation – Backwash Waste Pump 1 unit - Supply and Installation – Raw Water Transfer Pump 1 unit - Supply and Installation – Filtered Water Transfer Pump 2 units - Supply and Installation – Turbidity Meter 2 units - Supply and Installation – Chlorine Analyzer 1 unit - HVAC Upgrades Lump Sum - Clarifier Rehabilitation 1 unit - Raw Water Aeration System 2 unit - Supply and Installation - Process Piping 50 m - Transformer, dry-type, single phase 240/480 V primary 120/240 V secondary, 100 kVA 1 unit - Transformer, dry-type, single phase 240/480 V primary 120/240 V secondary, 50 kVA 1 unit - Generator set, gas/gasoline, 3 phase 4 wire, 277/480 V, 185 kW, includes battery, charger, & muffler 1 unit This is Contractor Supply of Aggregate Contract with No Option. The Owner reserves the right to reject any or all tenders. The lowest or any other tender will not necessarily be accepted. Evidence of capability and references may be requested prior to