USBE Safe and Healthy Schools Vendor Fair - April 2024

expired opportunity(Expired)
From: Utah(State)
USBE-AH24149-CP

Basic Details

started - 04 Apr, 2024 (25 days ago)

Start Date

04 Apr, 2024 (25 days ago)
due - 17 Apr, 2024 (12 days ago)

Due Date

17 Apr, 2024 (12 days ago)
Bid Notification

Type

Bid Notification
USBE-AH24149-CP

Identifier

USBE-AH24149-CP
State of Utah

Customer / Agency

State of Utah
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

08 April 2024 Clearfield City I-15 Interchanges Landscaping Bid Clearfield City I-15 Interchanges Landscaping Bid 08 April 2024 Open 3/18/2024 2:30 PM MDT Type Invitation for Bid Close 4/17/2024 2:00 PM MDT Number CLEA202426090 Currency US Dollar Sealed Until 4/17/2024 2:00 PM MDT 08 April 2024 Contacts Eric Howes ehowes@clearfieldcity.org Phone +1 801-525-2793 Nancy Dean ndean@clearfieldcity.org Phone +1 801-525-2714 Curtis Dickson curtis.dickson@clearfieldcity.org Phone +801 (525) 2795 08 April 2024 Commodity Codes Commodity Code Description 72140 Construction services including sewer maintenance and repair, roads and highways and excavation and backfill services, levee and dam construction and digging, ditching, road grading, rock stabilization, equipment rental or lease, and energy
conservation 30120 Roads and landscape material including asphalts and road and railroad construction materials and soil stabilizers and artificial turf and construction aggregates including rock, gravel, and sand 70130 Land and soil preparation and management and protection 08 April 202408 April 202408 April 202408 April 202408 April 202408 April 202408 April 202408 April 202408 April 2024 mailto:ehowes@clearfieldcity.org mailto:ndean@clearfieldcity.org mailto:curtis.dickson@clearfieldcity.org ThThe purpose of this RFB is to enter into a contract with a qualified firm to install landscaping on the UDOT owned interchanges along I-15 at 650 North and 700 South including all materials and labor required to complete the project. The work includes furnishing all labor, tools, materials, equipment, transportation, and services required for installing the irrigation and landscaping as described in the construction documents. Work shall also include: mobilization; obtaining all bonds and insurance, preparation of subgrade to accommodate topsoil, installation of automatic underground irrigation system, final grading, installation of plant materials, installation of mulches and metal bed edging, and miscellaneous other construction work required per the Contract Documents and Drawings. Description Required to View Event Prerequisites Required to Enter Bid 08 April 2024 1. Bidders are required to submit the Bid Form for Construction Contract as found in pages 20-26 of the Bid Documents 2. Bidders are required to attach a copy of the bid bond. The original bid bond must be received in the City Recorder's office within 24 hours of the bid opening. 3. All questions must be submitted through SciQuest during the Question and Answer period. 4. Bidders are encouraged to review the sourcing event often, due to possible addenda or Questions and Answers posted to the sourcing event. Bidder must also resubmit their bid, if an addendum has been made to the sourcing event, in order to be considered for an award. 5. The proposed Scope of Work is available in the bid documents. 6. The issuing procurement unit will not accept a bid after the time for submission of the sourcing event has expired. 7. Bids must be submitted electronically through SciQuest for the sourcing event. 8. A MANDATORY Pre-Bid meeting will be held at Clearfield City Hall 55 South State Street, Clearfield, UT 84015 with the option of going to the project site as part of that meeting beginning at 3:00 pm on March 21, 2024. 08 April 202408 April 202408 April 202408 April 202408 April 202408 April 202408 April 2024 Buyer Attachments 1. I-15 Interchanges RFB_Final.pdf 2. 55-22-045_100%Set_ClearfieldInterchanges.pdf 3. ClearfieldInterchangeTechnicalSpecifications.pdf 4. Insurance Requirements 010124.pdf 5. ClearfieldInterchanges_Addendum_1_Revised.pdf 6. Bid Form_Updated.pdf 08 April 202408 April 202408 April 202408 April 202408 April 202408 April 2024 https://bids01.jaggaer.com/apps/Router/PublicEventDownload?file=U291cmNpbmdldmVudC8xMjE3Njc0LTE1ODQ5NjY2MzBJLTE1IEludGVyY2hhbmdlcyBSRkJfRmluYWwucGRm&auth=MDpBRVMyI0NQNVp4a2IvSnkxZDNIUm81TGpka2h4M0V4bkpBZDlVSkVFUnk5WnZrK2l5eGZjOVRGNkRHUlU9 https://bids01.jaggaer.com/apps/Router/PublicEventDownload?file=U291cmNpbmdldmVudC8xMjE3Njc0LTE1ODQ5NzI3MjU1NS0yMi0wNDVfMTAwJVNldF9DbGVhcmZpZWxkSW50ZXJjaGFuZ2VzLnBkZg%3D%3D&auth=MDpBRVMyI0NQNVp4a2IvSnkxZDNIUm81TGpka2h4M0V4bkpBZDlVSkVFUnk5WnZrK2l5eGZjOVRGNkRHUlU9 https://bids01.jaggaer.com/apps/Router/PublicEventDownload?file=U291cmNpbmdldmVudC8xMjE3Njc0LTE1ODQ5NzI4NDBDbGVhcmZpZWxkSW50ZXJjaGFuZ2VUZWNobmljYWxTcGVjaWZpY2F0aW9ucy5wZGY%3D&auth=MDpBRVMyI0NQNVp4a2IvSnkxZDNIUm81TGpka2h4M0V4bkpBZDlVSkVFUnk5WnZrK2l5eGZjOVRGNkRHUlU9 https://bids01.jaggaer.com/apps/Router/PublicEventDownload?file=U291cmNpbmdldmVudC8xMjE3Njc0LTE1ODUwNjgzOTBJbnN1cmFuY2UgUmVxdWlyZW1lbnRzIDAxMDEyNC5wZGY%3D&auth=MDpBRVMyI0NQNVp4a2IvSnkxZDNIUm81TGpka2h4M0V4bkpBZDlVSkVFUnk5WnZrK2l5eGZjOVRGNkRHUlU9 https://bids01.jaggaer.com/apps/Router/PublicEventDownload?file=U291cmNpbmdldmVudC8xMjE3Njc0LTE1OTY1NTI1NTZDbGVhcmZpZWxkSW50ZXJjaGFuZ2VzX0FkZGVuZHVtXzFfUmV2aXNlZC5wZGY%3D&auth=MDpBRVMyI0NQNVp4a2IvSnkxZDNIUm81TGpka2h4M0V4bkpBZDlVSkVFUnk5WnZrK2l5eGZjOVRGNkRHUlU9 https://bids01.jaggaer.com/apps/Router/PublicEventDownload?file=U291cmNpbmdldmVudC8xMjE3Njc0LTE1OTY1NTI1NzVCaWQgRm9ybV9VcGRhdGVkLnBkZg%3D%3D&auth=MDpBRVMyI0NQNVp4a2IvSnkxZDNIUm81TGpka2h4M0V4bkpBZDlVSkVFUnk5WnZrK2l5eGZjOVRGNkRHUlU9 Questions Required Questions There are no Questions added to this event. 08 April 202408 April 202408 April 202408 April 202408 April 2024 Product Line Items Product Line Items There are no Items added to this event. 08 April 202408 April 202408 April 202408 April 2024 Service Line Items Service Line Items There are no Items added to this event. 08 April 202408 April 202408 April 2024

195 N 1950 W, Salt Lake City, UT 84116, United StatesLocation

Address: 195 N 1950 W, Salt Lake City, UT 84116, United States

Country : United StatesState : Utah

You may also like

Development of Structured, Safe & Healthy Recess Activitie

Due: 30 Jun, 2025 (in 14 months)Agency: Anne Arundel County Schools

ROSEDALE ELEMENTARY SCHOOL CROSSING - SAFE ROUTES TO SCHOOL

Due: 07 May, 2024 (in 8 days)Agency: City of Hillsboro

ROSEDALE ELEMENTARY SCHOOL CROSSING - SAFE ROUTES TO SCHOOL

Due: 07 May, 2024 (in 8 days)Agency: City of Hillsboro

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.