Demolish and Replace Passenger, Commercial and Tactical Vehicle Auto Wash System

expired opportunity(Expired)
From: Federal Government(Federal)
W15QKN20-X0D11

Basic Details

started - 13 Aug, 2020 (about 3 years ago)

Start Date

13 Aug, 2020 (about 3 years ago)
due - 21 Aug, 2020 (about 3 years ago)

Due Date

21 Aug, 2020 (about 3 years ago)
Bid Notification

Type

Bid Notification
W15QKN20-X0D11

Identifier

W15QKN20-X0D11
DEPT OF DEFENSE

Customer / Agency

DEPT OF DEFENSE (707822)DEPT OF THE ARMY (132962)AMC (72562)ACC (74935)ACC-CTRS (32869)ACC-NJ (4377)W6QK ACC-PICA (4366)
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

vvDescription of Product Performance. The United States Army Contracting Command New Jersey, located at Picatinny Arsenal, NJ, is in search of firms that can provide all plant, supervision, management, quality control, labor, tools, equipment, appliances and materials and perform all work necessary to replace the existing carwash facility with a new carwash system that can accommodate tactical vehicles.The project shall require demolition the existing carwash equipment, structural steel, and the metal engineered building; the installation of a code compliant new Engineered Metal Building Structure, one-step touchless wash system, provide a complete electrical and plumbing systems. The contracted firm shall also provide a six year extended warranty consisting of preventative maintenance parts and labor, and all soaps/detergent chemicals required for of six years of operation.The facility will be a completely automated system. The system must include a natural gas fired heat source, a fully contained filtration and stainless steel settling tank system, an (up to) 50-micron filtration capability, a 450 gallon reclaimed water capacity, oil and hydrocarbon skimming capability, a stainless steel absolute bag filter providing 20-micron filtration, a gas fired steam cleaner, and automatic shut off.The building will be placed on the footprint of the existing facility (25’ x 60’), and will include 2 to 3 bays with 12’ wide x 15’ high motorized roll-up steel doors and

Picatinny Arsenal ,
 NJ  07806  USALocation

Place Of Performance : N/A

Country : United StatesState : New JerseyCity : PICATINNY ARS

You may also like

Vehicle: 7 Passenger Mini Van- ORDERS CUT OFF- Chrysler Voyager

Due: 17 Oct, 2026 (in about 2 years)Agency: State Of Virginia

7466 - COSTARS 26 Passenger Vehicle Vans - #49679

Due: 04 Aug, 2024 (in 3 months)Agency: Allegheny County

Supply and Delivery of Various Light Commercial and Passenger Vehicles

Due: 13 May, 2024 (in 18 days)Agency: City of Cape Town

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.

Classification

pscCode Z2EZREPAIR OR ALTERATION OF OTHER INDUSTRIAL BUILDINGS