Albeni Falls Dam Fish Passage

expired opportunity(Expired)
From: Federal Government(Federal)
W912DW23R0001

Basic Details

started - 01 Dec, 2022 (17 months ago)

Start Date

01 Dec, 2022 (17 months ago)
due - 09 Dec, 2022 (16 months ago)

Due Date

09 Dec, 2022 (16 months ago)
Bid Notification

Type

Bid Notification
W912DW23R0001

Identifier

W912DW23R0001
DEPT OF DEFENSE

Customer / Agency

DEPT OF DEFENSE (708492)DEPT OF THE ARMY (133035)USACE (38093)NWD (6928)US ARMY ENGINEER DISTRICT SEATTLE (1091)

Attachments (6)

unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Agency/Office:U.S. Army Corps of EngineersLocation:USACE District, SeattleTitle:INDUSTRY DAY- TWO PHASE DESIGN-BUILD ALBENI FALLS DAM FISH PASSAGE FACILITY  LOCATION: Virtual.  Zoom Information Provided below.DATE: 15 November 2022TIME: 9:00 AM to 11:00 AMDESCRIPTION:The United States Army Corps of Engineers, Northwestern Division - Seattle District (NWS) is hosting a Virtual Industry Day on 15 November 2022 to provide additional information and gain feedback from industry on an upcoming requirement for the Two-Phase Design-Build large civil works project for the installation of a Fish Passage Facility located at Albeni Falls Dam, Oldtown (AFD), ID. The agency has been tasked to solicit for and award of a Design-Build construction contract for an upstream “trap and haul” fish passage facility at AFD for the passage of sub-adult and adult Bull Trout; The planned facility includes an entrance structure designed to discharge approximately 300 cubic feet per second (cfs) with two vertical
slot entrances, a gravity water supply system, a fishway, such as a ladder, a pre-sort pool, a fish lock for lifting fish, a sorting facility, and a truck loading area. The operation is anticipated to be year-round, excluding the warmest month of August when temperatures exceed lethal thresholds for bull trout and during winter periods of river or facility ice-over. The facility is designed to operate between tailwater elevations from 2,031 feet to 2,048 ft. The gravity water supply can operate at forebay elevations as low as 2,045 ft and forebay-tailwater elevation differentials as low as 4 ft.The construction activities may include the installation of isolation devices, like a cofferdam or equivalent, delivery of materials and equipment by trucks or a barge, tunneling through rock, drilling, and blasting of rock (both in and out of the water), placement of piles, and the curing of concrete for the assembly and attachment of the parts. The assembly of most of the structure will take place on land; however, construction of the entrance structure and parts of the auxiliary water intake may need to occur from a floating barge. The staging areas will be coordinated with AFD personnel. Limited laydown areas will be located on the right abutment within and adjacent to the Corps employee parking area. In general, access to the Project site will be from two areas: (1) barges working in the tailrace or forebay, and (2) the right abutment through the Corps access gate, parking area, and over the powerhouse intake deck. River access will be required to construct the fishway entrance as well as the auxiliary water supply intake structure. Access to the remaining project elements will be from the right abutment off U.S. Highway 2 via the dam access road.Attached is a preliminary layout of the major features of work. The construction of this project will have constraints which include but are not limited to: Seasonal work windows, blasting requirements, in-water work complying with water quality requirements, monitoring and construction work taking place alongside an active Hydroelectric dam while the dam continues to operate normally. Construction of the fish passage will be required to be in coordination with the terms of the Biological Opinion which can be found at https://ecos.fws.gov/tails/pub/document/9799287The proposed project is anticipated to be competitive, firm-fixed-price type contract to be procured in accordance with the Federal Acquisition Regulation (FAR) Subpart 36.3 (Two-Phase Design-Build Selection Procedures) and FAR Part 15 (Contracting by Negotiation), using the Tradeoff process.The Government is seeking qualified, experienced sources capable of performing the construction of the AFD Fish Passage Facility. Activities will include, but are not limited to:1. Design and construction of a fully integrated fish passage facility (target species bull trout) including an entrance structure, fish ladder, holding pool, fish lock, water supply, sorting facility and supporting infrastructure.2. Construction near an Active Hydroelectric Dam: The dam will be always operational during construction. Blasting and construction near or alongside an operating hydroelectric dam will be required.3. Construction under the terms of a Biological Opinion: The contract will contain constraints and measures as outlined in the Biological Opinion for activities such as in-water blasting, in-water concrete placement and cofferdam construction.USACE will provide Conceptual Plans at approximately a 35% level of design as part of the Request for Proposal (RFP), for the Design-Build contract.  Data such as survey and geotechnical investigation have been conducted and will also be provided as part of the RFP.In accordance with /DFARS Part 236, the estimated construction price range for this project is:  Between $25,000,000 and $100,000,000. Estimated duration of the project is 1,460 calendar days from issuance of the Notice to Proceed. The North American Industry Classification System code for this procurement is, 237990 Other Heavy and Civil Engineering Construction, which has a small business size standard of $39.5 million.ATTENDING THE INDUSTRY DAY IS HIGHLY RECOMMENDED FOR ALL PERSPECTIVE VENDOR INTEREST. The industry day is open to the vendor community of prime contractors and significant subcontractors who may be interested to submit a design proposal (Phase I) or build proposal (Phase II) on the work of the AFD Fish Passage Facility. The Virtual Industry Day Event will take place from 9:00 a.m. to 11:00 a.m. November 15, 2022, Pacific Time via Zoom.Below is the link to register in advance for this webinar:https://us02web.zoom.us/webinar/register/WN_KqKYv2cjT-uLB8DDK2gU7w  After registering, you will receive a confirmation email containing information about joining the webinar.The following documents are attached in support of this Special Notice. W912DW23R0001 Attachment 1- Preliminary Layout of the Major Features of Work.W912DW23R0001 Attachment 2- AFD FPF Seattle District Industry Day Final – To be posted on SAM at a later date.W912DW23R0001 Attachment 3-Questions from USACE to Industry regarding Design-Build of the AFD Fish Passage Facility – To be posted on SAM at a later date.If you would like to provide feedback for consideration on the documents, please provide them by email to: email sent to Jeannette Patton (jeannette.k.patton@usace.army.mil), Contract Specialist and Teresa King (teresa.l.king@usace.army.mil, Project Manager by November 14, 2022, by 2:00 PM Pacific Time. Responses to the questions will be provided at the meeting.Thank you for your interest and we look forward to your participation!***Posted on 9 November 2022: W912DW23R0001 Attachment 3-Questions from USACE to Industry regarding Design-Build of the AFD Fish Passage Facility.***Please note the final presentation (Attachment 2) will be posted after the Industry Day on 15 November 2022.----------------------------SPECIAL NOTICE UPDATE:  18 November 2022 1.  Army Corps of Engineers Albeni Falls Dam Fish Passage Industry Day was held on 15 November 20222.  Attachment 2 posted on 18 Novebmer 20223. Link to the recording of the Army Corps of Engineers Albeni Falls Dam Fish Passage Industry Day held on 15 Novebmer 2022 - https://www.youtube.com/watch?v=o-m_XFliPeE4. Industry Day attendee list (Attachment 4) posted on 18 November 2022----------------------------SPECIAL NOTICE UPDATE:  01 December 2022 The Government is seeking input and feedback from industry to assist in the development of the acquisition strategy for this project.  Attendance at the Industry Day is not required to provide feedback.  The presentation from Industry Day is Attachment 2.  If your firm did not have the opportunity to attend the Industry Day, please review the recording of the presentation utilizing the link below.  Please review and answer the questions in the attachment below titled "Questions for Industry for AFD FPF Industry Day 15 NOV 22".  If you would like to provide a response, kindly email your completed questionnaire to: Shane Jervis, Contract Specialist, at shane.e.jervis@usace.army.mil and Teresa King, Project Manager, teresa.l.king@usace.army.mil.  Please provide responses by 09 December 2022 at 10:00 AM Pacific time. 

Oldtown ,
 ID  83822  USALocation

Place Of Performance : N/A

Country : United StatesState : IdahoCity : Oldtown

You may also like

Coal Creek Fish Passage Construction

Due: 01 May, 2024 (in 5 days)Agency: Ben Franklin Transit

Coal Creek Fish Passage Construction

Due: 01 May, 2024 (in 5 days)Agency: Trout Unlimited

Walsh RFP for WSDOT I-90 & SR 900 Fish Passage

Due: 01 May, 2024 (in 5 days)Agency: Walsh Construction Company II, LLC

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.

Classification

naicsCode 237990Other Heavy and Civil Engineering Construction
pscCode Y1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIES