High Service Pump Station Chemical Piping Replacement Project (50049), Contract No. 2023-028

expired opportunity(Expired)
From: Tampa Bay Water(Utilities)
2023-028

Basic Details

started - 13 Apr, 2023 (12 months ago)

Start Date

13 Apr, 2023 (12 months ago)
due - 14 Jun, 2023 (10 months ago)

Due Date

14 Jun, 2023 (10 months ago)
Bid Notification

Type

Bid Notification
2023-028

Identifier

2023-028
Tampa Bay Water

Customer / Agency

Tampa Bay Water
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Project: High Service Pump Station Chemical Piping Replacement Project (50049), Contract No. 2023-028 Ref. #: 2023-028 Type: ITB Status: Open Open Date: Apr 13th 2023, 6:00 AM EDT Questions Due Date: May 23rd 2023, 5:00 PM EDT Close Date: Jun 14th 2023, 2:00 PM EDT Days Left: < 1 Project Description:Tampa Bay Water is seeking the solicitation for construction services for its High Service Pump Station facility. The High Service Pump Chemical System treats water from the Surface Water Treatment Plant, Brandon Urban Transmission Main, and Desalination Transmission Main. The three sources of water arrive at the pump station and chemical is injected at different locations before and after the pumps. This project will replace the chemical piping (sodium hypochlorite and ammonia hydroxide), the chemical pumps, and the addition of a new injection location. Important Events:OngoingOpen DateOnline PortalPosting date for the OpportunityApr 13th 2023, 6:00 AM EDTN/AUpcomingClose DateOnline
PortalDeadline for SubmissionsJun 14th 2023, 2:00 PM EDTN/AUpcomingIn Person Public Bid OpeningTampa Bay Water's Administrative Offices, 2575 Enterprise Road, Clearwater, FL 33763Public Bid Opening will be held "in person".Jun 14th 2023, 2:30 PM EDT - Jun 14th 2023, 3:00 PM EDTNoPassedPre-Bid & Site VisitTampa Bay Water’s Surface Water Treatment Plant & High Service Pump Station 2301 Regional Water Lane Tampa, FL 33619A non-mandatory pre-bid conference and site visit will be held at Tampa Bay Water’s Surface Water Treatment Plant and High Service Pump Station located at 2301 Regional Water Lane, Tampa, FL 33619 on May 5, 2023 at 10:00 a.m. Attendance at the pre-bid meeting and site visit is not mandatory, however, all prospective BIDDERS, their sub-contractors and suppliers are highly encouraged to attend the conference. This will be the only pre-bid & site visit tour offered. Contractors will need to drive to the location in their own vehicles and should dress in appropriate comfortable field tour attire (long pants and closed toe shoes). Tampa Bay Water reserves the right to cancel the site visit if inclement weather or wet/muddy road conditions warrant cancellation. Additional photographs of the sites are provided in the Bid documents for those who choose not to attend the site visit.May 4th 2023, 10:00 AM EDT - May 4th 2023, 11:30 AM EDTNoPassedQuestions Due DateOnline PortalDeadline to submit QuestionsMay 23rd 2023, 5:00 PM EDTN/A Supporting Documentation:2023-028 Addendum One- Final.pdfOtherDocument - Addendum One - Contract No. 2023-028 High Service Pump Station Chemical Piping Replacement Project (Re-Bid) Project No. 50049)Read more...May 12th 2023, 3:46 PM EDT - 2023-028 Addendum Two- FINAL.pdfOtherDocument - Addendum Two - Contract No. 2023-028 High Service Pump Station Chemical Piping Replacement Project (Re-Bid) (Project No. 50049)Read more...May 31st 2023, 3:32 PM EDT - 2023-028 Construction Bid Documents with Agreement - FINAL.pdfDocumentationInvitation for Sealed Bids with Alternate BidApr 11th 2023, 10:03 AM EDT - 2023-028 Pre-Bid Conference Agenda-Final BF.pdfOtherDocument - Pre-Bid Conference & Site Visit Agenda (not mandatory)Read more...Apr 27th 2023, 9:10 AM EDT - 2023-028 Pre-Bid SignIn Sheet.pdfOtherDocument - High Service Pump Station Chemical Piping Replacement Project (50049), Contract No. 2023-028 - Pre-Bid and & Site Visit Attendance SheetRead more...May 15th 2023, 3:10 PM EDT - Attachment 1 Specifications.pdfDocumentationSpecifications - Attachment 1 to ITBApr 5th 2023, 10:57 AM EDT - Attachment 2 Drawings.pdfDocumentationDrawings - Attachment 2 to ITBApr 5th 2023, 10:56 AM EDT - Attachment 3 Site Photos.pdfDocumentationSite Photos - Attachment 2 to ITBApr 5th 2023, 10:55 AM EDT - E-Verify Form.pdfOtherE-Verify Form - Please complete and signApr 11th 2023, 9:31 AM EDT - Commodity Codes: UNSPSC 951218 Utility buildings and structures: Buildings and structures used to provide various utility services UNSPSC 83101501 Supply of water UNSPSC 83101504 Water distribution management UNSPSC 95121640 Pipeline: A group of connected pipes , completely connected except for openings for egress, commonly at each end.

2575 Enterprise Rd, Clearwater, FL 33763, USALocation

Address: 2575 Enterprise Rd, Clearwater, FL 33763, USA

Country : United StatesState : Florida

You may also like

Lift Station Pump Replacement

Due: 15 May, 2024 (in 10 days)Agency: City of Tulsa

PUMP STATION AND COLLECTION SYSTEM REPLACEMENT, BERLIN LAKE

Due: 12 Aug, 2024 (in 3 months)Agency: DEPT OF DEFENSE

WHITE OAK BLDG 2 LIFT STATION PUMP 1 REPLACEMENT MD0811WO

Due: 07 Jun, 2024 (in 1 month)Agency: PUBLIC BUILDINGS SERVICE

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.