Description:City Bus is participating in PG&E's EV Fleet Electrification program. PG&E will do engineering, design, construction, own and maintain the line extension to the meet and transformer at 55 Stony Point Road, Santa Rosa, CA 95401. The City will need to engineer and construct from the meter to the charger and install the charger. Transit needs assistance with the electrical engineering work from the transformer to the charger. PG&E’s EV Fleet Electrification program:The Project will design and install electric vehicle charging infrastructure at the City’s corporation yard located at 55 Stony Point Road. The infrastructure will lower fleet operating costs, eliminate tailpipe emissions, and simplify maintenance. The City will be purchasing five battery electric buses (BEBs) and installing three electric The infrastructure will lower fleet operating costs, eliminate tailpipe emissions, and simplify maintenance. vehicles chargers for the BEBs. Improvements will include a switch gear enclosure, dual electric vehicle charging stations, concrete pads, a streetlight pole, PVC conduit trenching, bollards, curb-stops, signs, and re-striping. Contacts: Gregory Mariscal Supervising Engineer City of Santa Rosa (707)543-3832 gmariscal@srcity.org Chad Anderson Quality Control Associate City of Santa Rosa +1 (707) 529-6529 CAnderson@srcity.orgClick for larger