RFP #1709 KNGA & PKWY Demolition Consultant

expired opportunity(Expired)
From: Portland State University(Higher Education)
RFP #1709 (RFP)

Basic Details

started - 08 Nov, 2022 (16 months ago)

Start Date

08 Nov, 2022 (16 months ago)
due - 06 Dec, 2022 (15 months ago)

Due Date

06 Dec, 2022 (15 months ago)
Bid Notification

Type

Bid Notification
RFP #1709 (RFP)

Identifier

RFP #1709 (RFP)
Portland State University

Customer / Agency

Portland State University
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Project #: RFP #1709 (RFP) Category:ServicesDepartment:ConstructionIssued by: Portland State University [ open agency website in new window ] Publish Date:Nov 9, 2022 5:00PMProposals Due Date: Dec 6, 2022 2:00PM (Pacific Standard Time) add to calendar Status: open Posted:Nov 8, 2022 save to watchlist express interest submit proposal Description Project Overview: Portland State University (PSU) has made the decision to demolish the King Albert Residence Hall (KNGA) and the Parkway Manor Residence Hall (PKWY), both located on the PSU Campus. The City of Portland (COP) has determined that the KNGA is not a significant resource as it is not on the COP’s Historical Resources Inventory and has no other historic designation with the COP. Therefore, COP’s mandated 120-day protest period, which is required for demolition permit issuance, is not required. PKWY has already gone through the COP’s mandated 120-day protest period. The aforementioned 120-day protest period began on June 1, 2022 (#PR
22-148610 HRI) which is required for demolition permit issuance. PSU was notified by the COP on September 29, 2022 that the 120-day protest period has come to an end and as a result, the building was removed from the COP’s Historical Resources Inventory. This Request for Proposal (RFP) is asking Architectural Firms for a cost proposal to produce the required design documents and provide services to complete the demolition of the KNGA and PKWY. All of the RFP submissions received will be scored by a selection committee and the project awarded to the proposer having received the highest score. Attachments This project has the following solicitation documents. Bid DocumentFile SizeNotes RFP #1709 KNGA & PKWY Demolition Consultant.pdf 309,747 4.1 PSU Sample Consultant Agreement.pdf 668,950 4.2 PSU Consultant Terms and Conditions.pdf 573,321 4.3 Base Design Professional Fees Proposal Form.pdf 222,436 4.4 Bid Locker - Vendor Guide 2022.pdf 5,935,077 4.5 Summary of Previous Hazardous Material Sampling.pdf 2,572,516 4.6 20221108 KNGA & PKWY Project Schedule.pdf 108,297 4.7 KNGA/4.7.1 Asbestos-Mapping - FOR REFERENCE ONLY/2008 Asbestos Building Inspection.pdf 38,092,443 4.7 KNGA/4.7.1 Asbestos-Mapping - FOR REFERENCE ONLY/KNGA Asbestos Map.pdf 2,546,004 4.7 KNGA/4.7.2 As-Builts/1936_Roof-Drain-to-Mainline-Repair/Permit.pdf 3,004,032 4.7 KNGA/4.7.2 As-Builts/1965_Private-Sewer/Private-Sewer.pdf 3,004,329 4.7 KNGA/4.7.2 As-Builts/1973_Code-Compliance-Updates/01_Basement-Floorplans.pdf 40,167,343 4.7 KNGA/4.7.2 As-Builts/1973_Code-Compliance-Updates/02.0_Floor-1-Plan.pdf 13,832,461 4.7 KNGA/4.7.2 As-Builts/1973_Code-Compliance-Updates/02.1_Stair-Detail.pdf 13,030,132 4.7 KNGA/4.7.2 As-Builts/1973_Code-Compliance-Updates/03_Floors-2-to-4-Plan.pdf 13,700,368 4.7 KNGA/4.7.2 As-Builts/1973_Code-Compliance-Updates/04_Details.pdf 13,437,243 4.7 KNGA/4.7.2 As-Builts/1975_Retail--Food-Market-OC/01_Site-Plan.pdf 134,637 4.7 KNGA/4.7.2 As-Builts/1975_Retail--Food-Market-OC/02_Basement-Floor-Plan--Existing.pdf 574,900 4.7 KNGA/4.7.2 As-Builts/1975_Retail--Food-Market-OC/03_Retail-Store-Proposed-Plan.pdf 630,275 4.7 KNGA/4.7.2 As-Builts/1975_Retail--Food-Market-OC/19750926_Permit.pdf 145,996 4.7 KNGA/4.7.2 As-Builts/1977_Re-Roof/197708_KNGA_Roofing-Phs1_HOUS.PDF 775,771 4.7 KNGA/4.7.2 As-Builts/1980s-ca_Electrical-Study/01_All-Floors-Plans.pdf 11,279,479 4.7 KNGA/4.7.2 As-Builts/1980s-ca_Electrical-Study/02_Basement-Plan.pdf 10,075,407 4.7 KNGA/4.7.2 As-Builts/1982_Housing-Rehab--KNGA/BP-1-BP-2_Water-Treatment-Heaters-Gas-Piping-Boilers/BP-1- BP-2-Index_Water-Treatment-Heaters-Gas-Piping-Boilers_HOUS.pdf 0 4.7 KNGA/4.7.2 As-Builts/1982_Housing-Rehab--KNGA/BP-1-BP-2_Water-Treatment-Heaters-Gas-Piping-Boilers/P01-Basement-Floorplan,-Boiler-Room-Plan-Details_HOUS.pdf 0 4.7 KNGA/4.7.2 As-Builts/1982_Housing-Rehab--KNGA/BP-1-BP-2_Water-Treatment-Heaters-Gas-Piping-Boilers/P05-Basement-Plumbing-Fixtures-Schedule_HOUS.pdf 0 4.7 KNGA/4.7.2 As-Builts/1982_Housing-Rehab--KNGA/BP-1-BP-2_Water-Treatment-Heaters-Gas-Piping-Boilers/P06-All-Floors_HOUS.pdf 9,278,088 4.7 KNGA/4.7.2 As-Builts/1982_Housing-Rehab--KNGA/BP-1-BP-2_Water-Treatment-Heaters-Gas-Piping-Boilers/P10-Basement-Boiler-Room_HOUS.pdf 5,923,680 4.7 KNGA/4.7.2 As-Builts/1982_Housing-Rehab--KNGA/BP-3_Fire-Sprinklers/BP-3-Index_Fire-Sprinklers_HOUS.pdf 11,369,244 4.7 KNGA/4.7.2 As-Builts/1982_Housing-Rehab--KNGA/BP-3_Fire-Sprinklers/F01-Basement-Plan_HOUS.pdf 14,626,058 4.7 KNGA/4.7.2 As-Builts/1982_Housing-Rehab--KNGA/BP-3_Fire-Sprinklers/F02-All-Floor-Plans_HOUS.pdf 14,884,662 4.7 KNGA/4.7.2 As-Builts/1982_Housing-Rehab--KNGA/BP-4- BP-5_Service-Equipment-Fire-Alarms/E00_BP-4-Index-Service-Equipment_HOUS.pdf 12,850,507 4.7 KNGA/4.7.2 As-Builts/1982_Housing-Rehab--KNGA/BP-4- BP-5_Service-Equipment-Fire-Alarms/E00_BP-5-Index-Fire-Alarms_HOUS.pdf 14,346,833 4.7 KNGA/4.7.2 As-Builts/1982_Housing-Rehab--KNGA/BP-4- BP-5_Service-Equipment-Fire-Alarms/E01_Basement_HOUS.pdf 12,386,720 4.7 KNGA/4.7.2 As-Builts/1982_Housing-Rehab--KNGA/BP-4- BP-5_Service-Equipment-Fire-Alarms/E02_All-Floors_HOUS.pdf 11,934,357 4.7 KNGA/4.7.2 As-Builts/1982_Housing-Rehab--KNGA/BP-4- BP-5_Service-Equipment-Fire-Alarms/E17_General-Notes-BP-4.pdf 8,802,037 4.7 KNGA/4.7.2 As-Builts/1982_Housing-Rehab--KNGA/BP-4- BP-5_Service-Equipment-Fire-Alarms/E17_General-Notes-BP-5.pdf 13,468,800 4.7 KNGA/4.7.2 As-Builts/1982_Housing-Rehab--KNGA/BP-6_Handicap-Access-Living-Modifications/00_Index_HOUS.pdf 5,619,328 4.7 KNGA/4.7.2 As-Builts/1982_Housing-Rehab--KNGA/BP-6_Handicap-Access-Living-Modifications/P05_Basement-Plumbing-Fixtures-Schedule_HOUS.pdf 8,782,382 4.7 KNGA/4.7.2 As-Builts/1982_Housing-Rehab--KNGA/BP-6_Handicap-Access-Living-Modifications/P06_All-Floors_HOUS.pdf 9,278,088 4.7 KNGA/4.7.2 As-Builts/1984_Window-Replacements/A2_KNGA-Window-Replacements_1984_PSS-Window-Replacement-_-Rehab.pdf 522,269 4.7 KNGA/4.7.2 As-Builts/1990_Montgomery-Market-Remodel/A1_Floor-Plan,-Door-_-Finish-Schedules-_-Interior-Elevations.pdf 268,328 4.7 KNGA/4.7.2 As-Builts/1990_Montgomery-Market-Remodel/E1_Electrical-Plan.pdf 206,127 4.7 KNGA/4.7.2 As-Builts/1990_Montgomery-Market-Remodel/P1_Plumbing-Plan.pdf 168,423 4.7 KNGA/4.7.2 As-Builts/1996_Re-Roof_KNGA/A2.2_Existing-Roof-Plan.pdf 5,162,054 4.7 KNGA/4.7.2 As-Builts/1996_Re-Roof_KNGA/A2.3_Roof-Plan-_-Details.pdf 6,914,318 4.7 KNGA/4.7.2 As-Builts/1996_Re-Roof_KNGA/S1.0_Notes.pdf 7,465,299 4.7 KNGA/4.7.2 As-Builts/1996_Re-Roof_KNGA/S2.1_Roof-Plan-_-Sections.pdf 7,762,332 4.7 KNGA/4.7.2 As-Builts/1996_Re-Roof_KNGA/S2.2_Parapet-Plan-_-Sections.pdf 5,144,189 4.7 KNGA/4.7.2 As-Builts/2008_Meetro-Cafe_KNGA/0-G000_Cover_2008_Metro-Cafe_KNGA_269.pdf 830,525 4.7 KNGA/4.7.2 As-Builts/2008_Meetro-Cafe_KNGA/0-G001_General-Information_2008_Metro-Cafe_KNGA_269.pdf 2,056,739 4.7 KNGA/4.7.2 As-Builts/2008_Meetro-Cafe_KNGA/A101_ Demolition-New-Floor-Plan_2008_Metro-Cafe_KNGA_269.pdf 1,939,395 4.7 KNGA/4.7.2 As-Builts/2008_Meetro-Cafe_KNGA/A201_Demilition-New-Reflected-Celing_2008_Metro-Cafe_KNGA_269.pdf 1,582,005 4.7 KNGA/4.7.2 As-Builts/2008_Meetro-Cafe_KNGA/A601_Interior-Elevetions-Details_2008_Metro-Cafe_KNGA_269.pdf 1,944,067 4.7 KNGA/4.7.2 As-Builts/2008_Meetro-Cafe_KNGA/F101_Furniture-Equipment-Floor-Plan_2008_Metro-Cafe_KNGA_269.pdf 1,278,557 4.7 KNGA/4.7.2 As-Builts/2008_Meetro-Cafe_KNGA/FLS1_Code-Compliance-Summary_2008_Metro-Cafe_KNGA.pdf 2,513,328 4.7 KNGA/4.7.2 As-Builts/2019_Basement-Plumbing_KNG19C01/P1.0_Basement-Plan.pdf 282,456 4.7 KNGA/4.7.2 As-Builts/Topographical,-Property-_-Site-Surveys/269_surveyblock.dwg 294,266 4.7 KNGA/4.7.2 As-Builts/Topographical,-Property-_-Site-Surveys/269-rev1_surveyblock.dwg 2,184,744 4.7 KNGA/4.7.2 As-Builts/Topographical,-Property-_-Site-Surveys/269-revised-survey.dwg 949,440 4.7 KNGA/4.7.2 As-Builts/Topographical,-Property-_-Site-Surveys/269-topo-s.dwg 352,536 4.7 KNGA/4.7.2 As-Builts/Topographical,-Property-_-Site-Surveys/Block-237,-238,-269-_-270--Property-Line-Survey_CGT18C02.pdf 338,598 4.7 KNGA/4.7.2 As-Builts/Topographical,-Property-_-Site-Surveys/Block-240,-241,-268-Paritals-_-269--Topo-Survey_1988-02-16.pdf 6,605,887 4.7 KNGA/4.7.2 As-Builts/Topographical,-Property-_-Site-Surveys/Block-269-_-Partial-Blocks-240,-241-_-268_1988-02-16.pdf 6,605,887 4.7 KNGA/4.7.2 As-Builts/Topographical,-Property-_-Site-Surveys/Block-269--Topo-Survey_1997_HOFF-KNGA-SEH.PDF 405,880 4.7 KNGA/4.7.2 As-Builts/Topographical,-Property-_-Site-Surveys/Block-269--Topo-Survey_2001_KNGA.pdf 811,615 4.7 KNGA/4.7.2 As-Builts/Topographical,-Property-_-Site-Surveys/Block-269--Topo-Survey_2001.pdf 831,000 4.7 KNGA/4.7.3 Emergency Shutoffs/KNGA-Shutoffs.pdf 2,753,186 4.7 KNGA/4.7.4 Floor Plans/01_Basement.dwg 639,276 4.7 KNGA/4.7.4 Floor Plans/02_1st-Floor.dwg 689,580 4.7 KNGA/4.7.4 Floor Plans/03_2nd-Floor.dwg 681,227 4.7 KNGA/4.7.4 Floor Plans/04_3rd-Floor.dwg 683,843 4.7 KNGA/4.7.4 Floor Plans/05_4th-Floor.dwg 681,791 4.7 KNGA/4.7.4 Floor Plans/06_Roof-Plan.dwg 835,391 4.7 KNGA/4.7.4 Floor Plans/KNGA-All-Floor-Plans.pdf 1,339,289 4.8 PKWY/4.8.1 Asbestos-Mapping - FOR REFERENCE ONLY/2008_Asbestos-Building-Inspection.pdf 32,460,152 4.8 PKWY/4.8.1 Asbestos-Mapping - FOR REFERENCE ONLY/PRKW Asbestos Map.pdf 2,435,395 4.8 PKWY/4.8.2 As-Builts/1930_Original-Construction_CoP-212596/01_Foundation-Footing-Plan.pdf 537,557 4.8 PKWY/4.8.2 As-Builts/1930_Original-Construction_CoP-212596/02_Cellar-Floor-Plot-Plan.pdf 532,191 4.8 PKWY/4.8.2 As-Builts/1930_Original-Construction_CoP-212596/03_Floor-1-Plan.pdf 1,252,846 4.8 PKWY/4.8.2 As-Builts/1930_Original-Construction_CoP-212596/04_Floors-2-3-4-Typical-Plan.pdf 421,321 4.8 PKWY/4.8.2 As-Builts/1930_Original-Construction_CoP-212596/05_Roof-Plan.pdf 1,380,894 4.8 PKWY/4.8.2 As-Builts/1930_Original-Construction_CoP-212596/06_East-Elevation.pdf 981,532 4.8 PKWY/4.8.2 As-Builts/1930_Original-Construction_CoP-212596/07_North-Elevation.pdf 1,626,004 4.8 PKWY/4.8.2 As-Builts/1930_Original-Construction_CoP-212596/08_Cross-Section-at-AA-.pdf 2,173,439 4.8 PKWY/4.8.2 As-Builts/1930_Original-Construction_CoP-212596/Passenger-Elevator-Plan.pdf 423,004 4.8 PKWY/4.8.2 As-Builts/1930_Original-Construction_CoP-212596/Specifications-General-Electrical-Plumbing.pdf 2,176,273 4.8 PKWY/4.8.2 As-Builts/1974_Code-Compliance/01_Floor-1--Markups.pdf 246,494 4.8 PKWY/4.8.2 As-Builts/1974_Code-Compliance/01_Floor-1.pdf 8,925,721 4.8 PKWY/4.8.2 As-Builts/1974_Code-Compliance/02_Floor-2--Markups.pdf 209,342 4.8 PKWY/4.8.2 As-Builts/1974_Code-Compliance/02_Floor-2.pdf 8,786,689 4.8 PKWY/4.8.2 As-Builts/1974_Code-Compliance/03_Floors-3-to-5-Typical-Markups.pdf 164,730 4.8 PKWY/4.8.2 As-Builts/1974_Code-Compliance/03_Floors-3-to-5-Typical.pdf 8,686,138 4.8 PKWY/4.8.2 As-Builts/1977_Re-Roof/1977_03_Roofing-Phs1_HOUS.PDF 1,799,694 4.8 PKWY/4.8.2 As-Builts/1980s-ca_Electrical-Study/01_Floors-2-5-Plans.pdf 11,356,862 4.8 PKWY/4.8.2 As-Builts/1980s-ca_Electrical-Study/02_Floor-1-Plan.pdf 13,333,509 4.8 PKWY/4.8.2 As-Builts/1982_Housing-Rehab/BP-1-BP-2_Water-Treatment-Heaters-Gas-Piping-Boilers/BP-1-BP-2-Index_Water-Treatment-Heaters-Gas-Piping-Boilers_HOUS.pdf 0 4.8 PKWY/4.8.2 As-Builts/1982_Housing-Rehab/BP-1-BP-2_Water-Treatment-Heaters-Gas-Piping-Boilers/M05_Floor-1-Boiler-Room_HOUS.pdf 9,876,956 4.8 PKWY/4.8.2 As-Builts/1982_Housing-Rehab/BP-1-BP-2_Water-Treatment-Heaters-Gas-Piping-Boilers/P05_Floor-1-Boiler-Room-Plan-Details_HOUS.pdf 5,145,213 4.8 PKWY/4.8.2 As-Builts/1982_Housing-Rehab/BP-3_Fire-Sprinklers/BP-3-Index_Fire-Sprinklers_HOUS.pdf 11,369,244 4.8 PKWY/4.8.2 As-Builts/1982_Housing-Rehab/BP-3_Fire-Sprinklers/F07_Floor-1-Plan_HOUS.pdf 13,674,420 4.8 PKWY/4.8.2 As-Builts/1982_Housing-Rehab/BP-3_Fire-Sprinklers/F08_Floors-2-thru-5_HOUS.pdf 13,917,794 4.8 PKWY/4.8.2 As-Builts/1982_Housing-Rehab/BP-4-BP-5_Service-Equipment-Fire-Alarms/E00_BP-4-Index-Service-Equipment_HOUS.pdf 12,850,507 4.8 PKWY/4.8.2 As-Builts/1982_Housing-Rehab/BP-4-BP-5_Service-Equipment-Fire-Alarms/E00_BP-5-Index-Fire-Alarms_HOUS.pdf 14,346,833 4.8 PKWY/4.8.2 As-Builts/1982_Housing-Rehab/BP-4-BP-5_Service-Equipment-Fire-Alarms/E07_Floor-1_HOUS.pdf 12,116,227 4.8 PKWY/4.8.2 As-Builts/1982_Housing-Rehab/BP-4-BP-5_Service-Equipment-Fire-Alarms/E08_Floors-2-thru-5_HOUS.pdf 12,384,982 4.8 PKWY/4.8.2 As-Builts/1982_Housing-Rehab/BP-4-BP-5_Service-Equipment-Fire-Alarms/E17_General-Notes-BP-4.pdf 8,802,037 4.8 PKWY/4.8.2 As-Builts/1982_Housing-Rehab/BP-4-BP-5_Service-Equipment-Fire-Alarms/E17_General-Notes-BP-5.pdf 13,468,800 4.8 PKWY/4.8.2 As-Builts/1982_Housing-Rehab/BP-6_Handicap-Access-Living-Modifications/00_BP-6-Index_HOUS.pdf 5,619,328 4.8 PKWY/4.8.2 As-Builts/1982_Housing-Rehab/BP-6_Handicap-Access-Living-Modifications/P11_Floor-1_HOUS.pdf 9,230,913 4.8 PKWY/4.8.2 As-Builts/1982_Housing-Rehab/BP-6_Handicap-Access-Living-Modifications/P12_Floors-2-thru-5_HOUS.pdf 9,376,423 4.8 PKWY/4.8.3 Emergency-Shutoffs/PKWY-Emergency-shutoff.pdf 711,510 4.8 PKWY/4.8.4 Floor-Plans/01_1st-Floor.dwg 790,572 4.8 PKWY/4.8.4 Floor-Plans/02_2nd-Floor.dwg 739,604 4.8 PKWY/4.8.4 Floor-Plans/03_3rd-Floor.dwg 816,653 4.8 PKWY/4.8.4 Floor-Plans/04_4th-Floor.dwg 872,625 4.8 PKWY/4.8.4 Floor-Plans/05_5th-Floor.dwg 918,723 4.8 PKWY/4.8.4 Floor-Plans/06_Roof-Plan.dwg 731,494 4.8 PKWY/4.8.4 Floor-Plans/All-Plans.pdf 1,301,765 4.9 Technical Design Standards Rev5.pdf 48,855,040 Pre-Proposal Conference Optional Pre-Proposal Job Walk An optional Job Walk has been scheduled for November 16, 2022 at 9:00AM, local time with the PSU Project Manager to tour and further discuss both the KNGA and PKWY demolition projects. Interested parties should meet at the Parkway Residence Hall (PKWY), 1609 SW Park Ave., Portland, OR 97201. This Job Walk is not required but strongly encouraged. Pre-Proposal Conference Date Nov 16, 2022 9:00AM (Pacific Standard Time) add to calendar Pre-Proposal Conference Registration Before you can register your attendance, you will need to register your vendor profile with Portland State University using the "Register" button above. For Questions or Additional Information, Contact: Christy McBeth, CCCA, CDT, Contract Officer - Construction, proposals@pdx.edu Commodity Codes Commodity Codes (NIGP): 906-00 ARCHITECTURAL SERVICES, PROFESSIONAL 906-07 Architect Services, Professional, (Not Otherwise Classified), Including Consulting 912-40 Demolition Services Share:

1825 SW Broadway, Portland, OR 97201Location

Address: 1825 SW Broadway, Portland, OR 97201

Country : United StatesState : Oregon

You may also like

IFB 24-24 Construction & Demolition Debris Removal - Rebid

Due: 26 Apr, 2024 (in 28 days)Agency: Town of Vienna

Synthetic Turf: Repair and Replacement - Cooperative Members Only -

Due: 05 Sep, 2024 (in 5 months)Agency: Bergen County

Synthetic Turf: Repair and Replacement - Cooperative Members Only

Due: 05 Sep, 2024 (in 5 months)Agency: Bergen County

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.