Details ID: 24170-125-10011 Estimate: Type: Sanitary Sewer Rehabilitation Owner: Harris County Fresh Water Supply District 61 Location Harris County, TX Map Code: 368 Show Google Map Open Map On Google No Map To navigate, press the arrow keys. Scope The work in this contract is for the Sanitary Sewer Phases 10 Rehabilitation for Harris County Fresh Water Supply District No. 61 located in Hasting Green Section 2 along the side of North Eldridge Parkway and the end of Lofty Pines Drive. The purpose of the project is to rehabilitate the three sanitary sewer lines that run from the end of Lofty Pines Drive to along North Eldridge across from the WWTP. After the sanitary lines are rehabilitated, the four manholes will also be rehabilitated using a Cured-in-Place liner. Pre-Installation Cleaning and Televising, All Depths and Diameters, Complete in Place Slipline existing 36-Inch DIP sanitary sewer line with proposed 30-Inch SDR17 HDPE pipe and fill annular space with cementitious grout.
Rehabilitation of sanitary sewer manholes with Cured-in-Place liner, including rebuilding of benches and inverts, remove and replace frames and covers, raise sanitary sewer manholes, and grout exterior of sanitary manhole frame. Site Restoration, Including Removing and Replacing Concrete Sidewalks and Driveways, Damaged Turf, Plants, Shrubs, Fences, and Trees, as Required Removal and replacement of concrete pavement, including curb, gutter, and subgrade at all thicknesses as needed. Implementation of trench safety. Bypass Pumping if required. Pre-Bid Details Date: 12/13/2022 Time: 10:00 AM Location: 13205 Cypress North Houston Road, Cypress, Texas 77429 Notes: Mandatory in-person Bid Details Date: 12/20/2022 TBA Time: 10:00 AM CST Location: 13205 Cypress North Houston Road, Cypress, Texas 77429 Notes: Contact Address Lockwood, Andrews & Newnam, Inc. 2925 Briarpark Drive Houston, Texas 77042 Contact Info Contact: Jake Kocurek Phone: 713-266-6900 Fax: Email:
JWKocurek@lan-inc.com Bid Package Notes Additional Notes It is the responsibility of the contractor bidding the project to ensure the accuracy of the reproduction of all bid documents and construction drawings. This responsibility includes, but is not limited to, proper scaling, paper width and length, etc. Failure to do so may result in errors in the unit bid quantities and/or bid amounts.