due today

2024 Airfield Projects Contract 2

From: Port of Seattle(Port)
MC-0321718

Basic Details

started - 19 Mar, 2024 (1 month ago)

Start Date

19 Mar, 2024 (1 month ago)
due - 30 Apr, 2024 (Today)

Due Date

30 Apr, 2024 (Today)
Bid Notification

Type

Bid Notification
MC-0321718

Identifier

MC-0321718
Port of Seattle

Customer / Agency

Port of Seattle
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

MC-0321718 2024 Airfield Projects Contract 2 Status: Open Bid Due Date: Apr 30, 2024, 9:00:00 PM Question Cut-off Date: Apr 22, 2024, 5:00:00 PM Goals:- Visit the Port’s Vendor Connect procurement site for further details and to access the bid documents: https://hosting.portseattle.org/sops/#/Dashboard A Pre-Bid Meeting will be conducted on April 4, 2024 at 11:00 AM. See Document 00 20 00 IB 4.06 for more information. The 2024 Airfield Projects Contract 2 at Seattle-Tacoma International Airport (SEA) consists of Portland cement concrete panel (PCCP) replacements, channel drain replacement, Industrial Wastewater Systems (IWS) infrastructure improvements, taxiway centerline lighting, a new aircraft visual guidance docking system (AVGDS) at Gate N14, a new Preconditioned Air (PCAir) unit for the passenger loading bridge at Gate N14, new hydrant fueling pits/systems, replacement of flush fire hydrant/valve assemblies, and construction of an Oil/Water Separator for the consolidated SEA construction laydown area. The Port will furnish certain materials for incorporation in to the Work. See Document 00 41 00 – Bid Form, Schedule P for a summary of Port furnished materials and reference quantities. The Work will occur at various work areas at SEA including Taxiway B, Taxiway C, Taxi Lane W, Gate A3 apron, Gate N13 apron, Gate N14, Gate N14 apron, Gate N15 apron, Gate N16 apron, and the consolidated SEA construction laydown area. N Gates are those gates at the North Satellite Building (North Concourse). Designated portions of the Work must occur during the closure of Runway 16L-24R, scheduled for five nights per week beginning August 15, 2024 through September 30, 2024. This contract has a Project Labor Agreement (PLA). The Engineer’s estimate range for this project is $6,000,000 – $12,000,000. The WMBE utilization goal is 14 % for this

2711 Alaskan Way Seattle, WA 98121Location

Address: 2711 Alaskan Way Seattle, WA 98121

Country : United StatesState : Washington

You may also like

2024 West Jordan Concrete for Pave Areas

Due: 15 May, 2024 (in 14 days)Agency: State of Utah

2024 Crack Fill and Striping Projects

Due: 07 May, 2024 (in 6 days)Agency: Waukesha County

2024 Crack Fill and Striping Projects

Due: 07 May, 2024 (in 6 days)Agency:

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.