REVISED GENERAL CONDITIONS apply to this contract. See General Conditions 2020 Edition, Revision 2 on the FDC website. Work included under this contract consists of all electrical construction work depicted and defined on the contract drawings and as specified in these contract specifications. Main items of work consist of but are not limited to the following: Install concrete slabs for new transformers and distribution panels, install electrical transformer and distribution panel, install precast concrete manhole, install electrical duct banks, install electric cables and utility pedestals on the piers, replace Pier 4, 1, and C utility pedestals and install ice suppression systems as per contract drawings and specifications. Engineer's Estimate: $500,000 - $1