Description of Work: UNLV is seeking an experienced contractor for its Phase IV and V Residence Halls WiFi Coverage Project.
Contractor(s) shall furnish the necessary personnel, materials, equipment, services, and facilities to provide WiFi devices and cabling installation for Residence Halls in accordance with the requirements of this IFB. The Project will be awarded on a Lot by Lot basis.
Lot 1 consists of the following six (6) buildings: Dayton Complex – North (DAY-N); Dayton Complex – South (DAY-S); Gym Road Residence Hall – Building B (RHB); Mitzi and Johnny Hughes Residence Hall (HUH); Tonopah Residence Complex – Center/South (TON-C/S); and Tonopah Residence Complex – North (TONN).
Lot 2 consists of the following five (5) buildings Kitty Rodman Residence Hall (KRH); Margie and Robert Faiman Residence Hall (MFH); Gym Road Residence Hall – Building C (RHC); Claudine Williams Residence Hall (CWH), and William S. Boyd Residence Hall (WBH).
The solicitation documents are available at
https://nevada.ionwave.net , NGEM Solicitation #5398-TB, 'Attachments' Tab. Interested suppliers need to register with NGEM to download the solicitation attachments.
There will be a mandatory Pre-Bid Conference and Site Walk on 02/21/2020, at 9:00 A.M.
See