FY23 Snohomish/Everett Hydraulic Maintenance Dredging

expired opportunity(Expired)
From: Federal Government(Federal)
W912DW23B0006

Basic Details

started - 19 Sep, 2023 (7 months ago)

Start Date

19 Sep, 2023 (7 months ago)
due - 18 Sep, 2023 (7 months ago)

Due Date

18 Sep, 2023 (7 months ago)
Bid Notification

Type

Bid Notification
W912DW23B0006

Identifier

W912DW23B0006
DEPT OF DEFENSE

Customer / Agency

DEPT OF DEFENSE (708895)DEPT OF THE ARMY (133113)USACE (38130)NWD (6936)US ARMY ENGINEER DISTRICT SEATTLE (1091)
[object Object]

SetAside

SBA(Total Small Business Set-Aside (FAR 19.5))

Attachments (5)

unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

9/19/2023 Abstract Results are Attached.9/12/2023 The purpose of this amendment (0002) is to update the Construction Wage Rates (formally known as the Davis Bacon Wage Rates) from WD General Decision Number_WA20230080 06JAN2023 to WD General Decision Number_WA20230080 25AUG2023.9/5/2023 The purpose of this amendment (0001) is to replace the spec section in its entirety. The new section is 1 SPEC R0001.Summary of Changes: Revised 01 11 00 SUMMARY OF WORK FOR HYDRAULIC DREDGING Revised clarifying language in Section 1.2 regarding The work includes approximately 175,000 Cubic Yards (CY).The Corps of Engineers (USACE), Seattle District, proposes to perform maintenance dredging of the Snohomish River Federal Navigation Channel via a hydraulic pipeline dredge. The Snohomish River navigation project is located in Everett, WA. The volume of sediment to be dredged is approximately 140,000 Cubic Yards with placement at the Parcel O (up to 100,000 CY) and Jetty Island (NTE 40,000 CY) upland sites. The dredge areas are in the lower channel from Sta. 89+50 to Sta. 115+00 (placement on Jetty Island), and the upper channel, Sta. 337+07 to Sta. 354+47 (placement in Parcel O). Parcel O placement site requires site work to prepare the site for sediment placement. The work window for this project is 16 October 2021 through 14 February 2022. Interested parties should be familiar with the weather and river conditions for this project location, including an understanding of the tides and currents in the work area. NAICS Code: 237990 (Exception) Dredging and Surface Cleanup Activities Small Business Size Standard: $37 million (Dredging)The magnitude of construction is estimated to be between $1,000,000 and $5,000,000. The resulting contract will be

KO CONTRACTING DIVISION 4735 EAST MARGINAL WAY SOUTH  SEATTLE , WA 98134-2329  USALocation

Place Of Performance : N/A

Country : United StatesState : WashingtonCity : Bridgeport

You may also like

Oakland Inner and Outer Harbor FY 24 Maintenance Dredging

Due: 16 May, 2024 (in 18 days)Agency: DEPT OF DEFENSE

NR-23-C1 - Storm Sewer Lift Station Rehab/Reconstruction & Incidentals

Due: 08 May, 2024 (in 10 days)Agency: City of Fargo

Classification

naicsCode 237990Other Heavy and Civil Engineering Construction
pscCode Z1KFMAINTENANCE OF DREDGING FACILITIES