Willowcrest Subdivision Paving, Drainage and Sanitary Improvements

expired opportunity(Expired)
From: Pearland(City)
1022-05 Addendum 2

Basic Details

started - 27 Oct, 2021 (about 2 years ago)

Start Date

27 Oct, 2021 (about 2 years ago)
due - 02 Dec, 2021 (about 2 years ago)

Due Date

02 Dec, 2021 (about 2 years ago)
Bid Notification

Type

Bid Notification
1022-05 Addendum 2

Identifier

1022-05 Addendum 2
City of Pearland

Customer / Agency

City of Pearland
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

The project will entail the removal and reconstruction of the storm sewer system, residential street paving, sanitary sewer rehabilitation, water line crossings and construction of an approximately 5-acre detention pond. The scope of work for the storm sewer system consists of the removal of 15-inch to 36-inch storm sewer and realignment of the proposed 18-inch to 48-inch RCP, 4’x3’ RCB and 5’x3’ RCB storm sewer by open cut. The project also includes reconstruction of approximately 2.7 miles of 28-foot wide 6-inch and 7-inch concrete pavement 0.26 miles of 22-foot wide asphalt pavement, including 2,000 linear feet of roadside ditch regrading, 5.3 miles of 5-foot sidewalk and reconstruction of concrete driveways. The proposed sanitary sewer rehabilitation includes trenchless construction of the existing 8-inch to 12-inch sanitary sewer by pipe burst method and work also includes rehabilitation of the existing sanitary sewer manholes. Detention pond construction includes pond excavation, backslope swales, outfall pipe, concrete pilot channel and slope paving. Additionally, the project requirements include traffic control, miscellaneous signage, SWPPP measures, tree protection plan and other items, to facilitate construction of this

3523 Liberty Drive,Pearland, TX 77581 USALocation

Address: 3523 Liberty Drive,Pearland, TX 77581 USA

Country : United StatesState : Texas

You may also like

Parnell Hills Residential Subdivision Paving and Drainage

Due: 06 May, 2024 (in 13 days)Agency: Columbia County

Water, Sewer, Drainage and Paving Improvements for Woodson's Grand Drive

Due: 30 Apr, 2024 (in 6 days)Agency: Pape-Dawson Engineers

Construction of Water, Sanitary, and Drainage Facilities in Bridge Creek Section 11

Due: 26 Apr, 2024 (in 3 days)Agency: Quiddity Engineering, LLC

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.