Phase 2 - Solar PV Installations for SLC School District

expired opportunity(Expired)
From: Salt Lake City School District(School)
TB2446-PVI

Basic Details

started - 16 Mar, 2024 (1 month ago)

Start Date

16 Mar, 2024 (1 month ago)
due - 17 Apr, 2024 (12 days ago)

Due Date

17 Apr, 2024 (12 days ago)
Bid Notification

Type

Bid Notification
TB2446-PVI

Identifier

TB2446-PVI
Salt Lake City School District

Customer / Agency

Salt Lake City School District
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Bid#TB2446-PVI - Phase 2 - Solar PV Installations for SLC School District Salt Lake City School District, UT Time left: 21 hrs, 47 mins Bidstarted: Mar 29, 2024 10:20:58 PM MDT Bidends: Apr 17, 2024 2:00:00 PM MDT Register now for free! Register for free to access Bid information and place offers on Bids released by our agency clients.Download Bid packet DetailsDocumentsLine itemsPre-bid conferenceVendor ads Bid#TB2446-PVI - Phase 2 - Solar PV Installations for SLC School District IFB Bidcontact:Please log in to view Bid contact informationIssuing agency:Salt Lake City School District, UTSee other Bids by this agencyBid Comments: On behalf of McKinstry Essention (McKinstry), this IFB is being issued by the Salt Lake City School District (SLCSD/Owner) seeking competitive bids for a solar PV installation contractor. We are seeking install/construction services. PLEASE NOTE: Only vendors who are on the current Approved Vendor List for Solar PV Installations are allowed to bid on this
project. Those vendors are: Creative Energies, LLC Gardner Energy BIDS FROM ANY OTHER VENDOR WILL NOT BE ACCEPTED. Questions regarding this solicitation must be asked in writing in Periscope Source. Answers to all questions will be provided in Periscope Source. Only answers issued through the Periscope Source system or issued via an authorized and properly issued addendum shall be the official position of the SLCSD. Any modification to this procurement effort shall be made by addendum issued by the SLCSD. Only authorized and properly issued addenda shall constitute the official binding position of the SLCSD. Anyone submitting a response to this solicitation based on communication or information received from sources other than through official addendum, assumes full risk including the possibility of a determination of non-responsiveness and may be rejected at the sole discretion of the SLCSD. By submitting a Bid, the Bidder represents that he/she has examined, read and familiarized him/herself with the requirements of the bid documents and the conditions governing the Work. ATTACHMENTS AND EXHIBITS: Phase 2 - Solar PV Installations - Main IFB Document Attachment A: SLCSD Contract Terms and Conditions Attachment B: Scope of Work Attachment C: Value Added Engineering Attachment D: Subcontractor Vendor List Attachment E: Changes in Scope of Work Attachment F: Schedule and Crew Information Attachment G: Bid Pricing Form Attachment H: McKinstry Sample Contract Attachment I: Q&A Responses from Previous Questions Exhibit 1: Design Drawings List Exhibit 1a: Solar Design Drawings Exhibit 1b: Racking Drawings Exhibit 1c: Available Roof Loading Capacities Added on Apr 11, 2024:This Addendum #1 is hereby issued. The below information is to be incorporated into the scope and cost of the project. All vendors are responsible for reviewing all document and submitting bids accordingly. GENERAL NOTES/CLARIFICATIONS: 1. The following updates are included in Addendum #1 and have been uploaded to Periscope Source. a. Exhibit 1b – Racking Drawings is now available. Any discrepancies in array layout between the electrical and racking drawings will be dictated by the racking drawings. As a reminder, the Construction Scope Responsibility Matrixshows what racking material SUBCONTRACTOR is responsible for providing and what will be furnished by McKinstry. b. For East HS, please breakout the price of installing mechanical attachments in Attachment F. We acknowledge there are a large number on this site and are working with the vendor to decrease them. c. Exhibit 1d – Slip Sheet Specs has been added to the IFB detailing allowable slip sheet sizes. SUBCONTRACTOR price must reflect this requirement. d. Exhibit 1e –Roof Warranties and Policies has been added to the IFB detailing the roof manufacturer’s policies for PV installation. SUBCONTRACTOR price must reflect compliance with these policies. e. Responses to questions and comments from the walk-through can be found in Exhibit 2. All answers are considered part of the IFB and must be reflected in Vendor submission and pricing. DOCUMENTS: Updated Exhibit 1 Design Drawings List for individual set names. Exhibit 1b – Racking Drawings Exhibit 1d – Slip Sheet Spec Exhibit 1e – Roof Warranties and Policies Exhibit 2 – Site Walk Response Matrix Description: This IFB is issued for a solar PV installation contractor. Please review documents and submit bids as directed herein.Delivery location:Please log in to see the delivery locationClassification codes:View classification codesContract duration:One Time PurchaseContract renewal:Not ApplicablePrices good for:Not ApplicableRegions:Utah, Salt Lake Please log in to see Bid details or to add this to My Bids. If you are not registered, please registerfor free.Login

465 South 400 East, Suite 300 Salt Lake City, Utah 84111Location

Address: 465 South 400 East, Suite 300 Salt Lake City, Utah 84111

Country : United StatesState : Utah

You may also like

RFQ FOR SOLAR PV PROJECTS

Due: 13 Jun, 2033 (in about 9 years)Agency: Connecticut Conference of Municipalities

Landfill Gas System Expansion Phase 2 - Supply & Installation

Due: 02 May, 2024 (in 1 day)Agency: District of Squamish

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.