Construction of Water Production Facility for Cresson MUD No. 1

From: Pape Dawson Engineers(Co-op)
70193-02

Basic Details

started - 27 Mar, 2024 (1 month ago)

Start Date

27 Mar, 2024 (1 month ago)
due - 22 May, 2024 (in 20 days)

Due Date

22 May, 2024 (in 20 days)
Bid Notification

Type

Bid Notification
70193-02

Identifier

70193-02
Pape Dawson Engineers

Customer / Agency

Pape Dawson Engineers
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

The Cresson Municipal Utility District No. 1 (Cresson MUD-1) has been established to provide potable water to a new multi-unit development in Hood County. The proposed development is located along US Hwy 377, approximately 1.6 miles southwest of its intersection with SH 171 and the City of Cresson, in Hood County. This water production facility will include on-site ground storage tanks, a high service pump station, hydropneumatic tanks, electrical and SCADA equipment to manage and operate the facility. This new water production facility will support the mixed-use community incorporating a mixture of single family and multi-family residential areas, local retail and commercial use areas, and on-site recreational areas and parks. The Brookside development is anticipated to be fully built-out over a period of fifteen years through multiple subdivision units. Final build-out of the water production facility is projected to provide potable water service to approximately 1,160 connections
(Living Equivalent Units – LUE’s). The Phase 1 Water Production Facility submittal will include detailed construction plans and technical specifications for the following facilities: A new 300,000-gallon welded steel ground storage tank with an altitude valve, with water level sensors, level controls and monitors, Alternatively, a 600,000-gallon prestressed concrete ground storage tank A new high service pump station with a capacity of 2,280 gallons per min (3.2 MGD) with variable frequency controls, A 12,000-gallon hydropneumatic tank with air compressor, controls, SCADA connection, An onsite disinfection system utilizing a 12.5% hypochlorite solution injection system, with controls and SCADA connection, A complete electrical system including controls, lighting, security support, with control valves, electronic meters, surge protection, An emergency generator with automatic controls, A SCADA system for operator use and system management, Security, lighting systems providing notifications to facility operators, Site work with paving, grading plans, and utility service for the facility. Pre-Bid Details:- Date: 4/18/2024 Time: 2:00 PM Location: Pape-Dawson Engineers, 6105 Tennyson Parkway, Suite 210, Plano, Texas 75024 Notes: Non- Mandatory Pre-Bid Meeting can be attended in Person at the office of the Engineer or online via telephone (210.926.0892, Conference ID 589 221 499#) or Teams (Meeting ID 234 062 243 587, Passcode bynCiV). Bid Details:- Date: 5/22/2024 TBA Time: 2:00 PM CDT Location: Pape-Dawson Engineers, 6105 Tennyson Parkway, Suite 210, Plano, Texas 75024 or Online Via Civcastusa.com Notes: Bids will be received physically at the office of the Engineer, Pape-Dawson Engineers, 6105 Tennyson Parkway, Suite 210, Plano, Texas 75024, Phone 214.420.8494 or online through Civcastusa.com until 2:00 p.m. local time, Thursday, May 9, 2024, and then publicly opened and read at the office of the Engineer, as well as via telephone (210.926.0892, Conference ID 973 706 685#) or Teams (Meeting ID 235 189 713 170, Passcode ovkwRn)

Pape-Dawson Engineers 6105 Tennyson Parkway Plano, Texas 75024 pape-dawson.comLocation

Address: Pape-Dawson Engineers 6105 Tennyson Parkway Plano, Texas 75024 pape-dawson.com

Country : United StatesState : Texas

You may also like

Aggregates Phase 1

Due: 22 May, 2024 (in 20 days)Agency: Boone County

Letterkenny Army Depot (LEAD) Expand Fire Department Facility

Due: 08 May, 2024 (in 6 days)Agency: DEPT OF DEFENSE

Construction of Water Production Facility for Cresson MUD No. 1

Due: 09 May, 2024 (in 6 days)Agency: Pape-Dawson Engineers

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.