Cost of Service (Rate) Study

From: Utah(State)

Basic Details

started - 18 Apr, 2024 (16 days ago)

Start Date

18 Apr, 2024 (16 days ago)
due - 03 Jun, 2024 (in 29 days)

Due Date

03 Jun, 2024 (in 29 days)
Bid Notification

Type

Bid Notification

Identifier

N/A
State of Utah

Customer / Agency

State of Utah
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

18 April 2024 Cost of Service (Rate) Study Provide assistance in power, water, sewer and solid waste utility rate assessments, evaluate existing rates and fees, provide recommendations, and develop a rate structure 18 April 2024 Open 4/18/2024 4:30 PM MDT Type Request for Proposal Close 6/3/2024 2:00 PM MDT Number TUID202426525 Currency US Dollar Sealed Until 6/3/2024 2:00 PM MDT 18 April 2024 Contacts Alexa Wilson-TUID alexawilson@ticaboouid.com Phone +1 801-538-5177 18 April 2024 Commodity Codes Commodity Code Description 83100 Utilities including gas and power and water and sewer and electricity and utilities management and consulting services, and alternative forms of energy, solar panels and servicing 18 April 202418 April 202418 April 202418 April 202418 April 202418 April 202418 April 202418 April 2024 mailto:alexawilson@ticaboouid.com Ticaboo Utility
Improvement District (“TUID”) is a political subdivision and operates as an improvement district in accordance with Title 17B, Chapter 2a, Part 4 of the Utah Code and a local district in accordance with Title 17B, Chapter 1 of the Utah Code. TUID is responsible for operating and maintaining the power, water, sewer and solid waste systems of the unincorporated town site of Ticaboo, Utah. TUID serves approximately 70 customers, and one large commercial operation, which provides tourism related service including a hotel. The commercial operation uses about two thirds of all generated power. Total annual revenue for TUID is currently only $500,000 for all utilities and is barely enough to cover day-to-day operations. TUID runs exclusively on diesel generated power and is not connected to the grid and therefore cannot buy power from other sources. TUID operates a water tank, supplied by two water pumps which run on solar power and sewer lagoon, just outside of town. Solid waste gets hauled to a nearby landfill operated by Garfield County, UT. Who May Respond The Proposer must be a consulting or engineering firm that is experienced in conducting comprehensive power, water, sewer and solid waste utility rate studies. All responses must be uploaded to U3P by the closing date. Objective The objective of this Request for Proposal (RFP) is to receive proposals for a comprehensive utility rate study from qualified and experienced firms, to provide assistance in power, water, sewer and solid waste utility rate assessments, evaluate existing rates and fees, provide recommendations, and develop a rate structure that provides adequate revenues necessary to fund utility operations, while being fair and equitable to the public. For details see uploaded document. Description Required to View Event Prerequisites Required to Enter Bid There are no Prerequisites added to this event. 18 April 202418 April 202418 April 202418 April 202418 April 202418 April 202418 April 2024 Buyer Attachments 1. 1. RFP Rate Study TUID.pdf 2. 2. Rate Sheet.pdf 3. 3. Warranties.pdf 18 April 202418 April 202418 April 202418 April 202418 April 202418 April 2024 https://bids01.jaggaer.com/apps/Router/PublicEventDownload?file=U291cmNpbmdldmVudC8xMjI2NTMzLTE2MDI5MDUxODkxLiBSRlAgUmF0ZSBTdHVkeSBUVUlELnBkZg%3D%3D&auth=MDpBRVMyI0NQNVp4a2IvSnkxZDNIUm81TGpka2h4M0V4bkpBZDlVSkVFUnk5WnZrK2l5eGZjOVRGNkRHUlU9 https://bids01.jaggaer.com/apps/Router/PublicEventDownload?file=U291cmNpbmdldmVudC8xMjI2NTMzLTE2MDI5MDYwMzUyLiBSYXRlIFNoZWV0LnBkZg%3D%3D&auth=MDpBRVMyI0NQNVp4a2IvSnkxZDNIUm81TGpka2h4M0V4bkpBZDlVSkVFUnk5WnZrK2l5eGZjOVRGNkRHUlU9 https://bids01.jaggaer.com/apps/Router/PublicEventDownload?file=U291cmNpbmdldmVudC8xMjI2NTMzLTE2MDI5MDU5NzgzLiBXYXJyYW50aWVzLnBkZg%3D%3D&auth=MDpBRVMyI0NQNVp4a2IvSnkxZDNIUm81TGpka2h4M0V4bkpBZDlVSkVFUnk5WnZrK2l5eGZjOVRGNkRHUlU9 Questions Required Questions There are no Questions added to this event. 18 April 202418 April 202418 April 202418 April 202418 April 2024 Product Line Items Product Line Items There are no Items added to this event. 18 April 202418 April 202418 April 202418 April 2024 Service Line Items Service Line Items There are no Items added to this event. 18 April 202418 April 202418 April 2024

195 N 1950 W, Salt Lake City, UT 84116, United StatesLocation

Address: 195 N 1950 W, Salt Lake City, UT 84116, United States

Country : United StatesState : Utah

You may also like

Cost of Service (Rate) Study

Due: 03 Jun, 2024 (in 29 days)Agency: State of Utah

Stormwater Cost of Service Study

Due: 08 May, 2024 (in 3 days)Agency: Contract Administration

CX STUDY.

Due: 19 Sep, 2025 (in 16 months)Agency: NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.