Replace Carpet and Tiles in Bldg#819 & #824, Osan AB (MATOC ONLY)

Replace Carpet and Tiles in Bldg#819 & #824, Osan AB (MATOC ONLY)(Expired)

Dates

Bid Notification started - 05 Sep, 2017 (15 months ago) - Replace Carpet and Tiles in Bldg#819 & #824, Osan AB (MATOC ONLY)

Start Date

05 Sep, 2017 (15 months ago)
Bid Notification due - 05 Sep, 2017 (15 months ago) - Replace Carpet and Tiles in Bldg#819 & #824, Osan AB (MATOC ONLY)

Due Date

22 Sep, 2017 (14 months ago)
Bid Notification - Replace Carpet and Tiles in Bldg#819 & #824, Osan AB (MATOC ONLY)

Opportunity Type

Bid Notification
W90VN6-17-R-0048 - Replace Carpet and Tiles in Bldg#819 & #824, Osan AB (MATOC ONLY)

Opportunity Identifier

W90VN6-17-R-0048
Bid Notification Department of the Army - Replace Carpet and Tiles in Bldg#819 & #824, Osan AB (MATOC ONLY)

Customer / Agency

Department of the Army
Bid Notification Osan AB Pyongtaek, Korea, South - Replace Carpet and Tiles in Bldg#819 & #824, Osan AB (MATOC ONLY)

Location

Osan AB Pyongtaek, Korea, South
From: Federal Government(Federal)
Added: Sep 05, 2017 12:56 am STATEMENT OF WORK W/O 86244 REPLACE FLOORING, B-819, 824 OSAN AB, ROK 1. DESCRIPTION: The work to be performed for completion of this project shall be as described in general below. 1.1. The contractor shall provide all labor, tools, equipment, supplies, and any other resources necessary to accomplish the scope of work contained herein and as included in the drawings and specifications. 1.2. All work shall be completed IAW drawings and specifications. 1.3. All work shall be completed within 90 calendar days after N.T.P. 2. PRINCIPLE FEATURES: This project includes the following principle features: 2.1. Architecture Works Contractor's performance shall be strictly in compliance with the terms and conditions in the contract and the applicable documents attached hereto. Specific tasks are as follows. 2.1.1. Replace carpet with new (9T, level loop type, Hyosung, Kolon or equal) in 4 EA rooms of Bldg#819 not including cove base. Cushion shall be compatible with selected carpet. See floor plan for Bldg#819, yellow highlighted area (Reference Spec. 09 68 00). 2.1.2. Remove existing flooring and install new vinyl composition tile (3.0t, 12"x12", Hanhwa Deluxe, LG PVC, KCC Deluxe or equal) including cove base in RM#104, #107, #113, #106, #102 and #101 of Bldg#824. See floor plan for Bldg#824 yellow highlighted area (Reference Spec. 09 65 00). 2.1.3. Provide 3 EA entrance mat (72"x504", 71"x290", 65"x240") and backing with rubber (Non slip, 100% polypropylene BCF, Saxony cut, gray color swan mat 200 or equal). 2.1.4. Contractor shall move office furniture and desk during his work, however end user shall be responsible for disconnect and connect computers.

Location

State : Gyeonggi-do