23-CPHD-ITBPW-379 11th Street Park Improvements

expired opportunity(Expired)
From: Arlington(County)
23-CPHD-ITBPW-379

Basic Details

started - 12 Oct, 2022 (18 months ago)

Start Date

12 Oct, 2022 (18 months ago)
due - 05 Dec, 2022 (16 months ago)

Due Date

05 Dec, 2022 (16 months ago)
Bid Notification

Type

Bid Notification
23-CPHD-ITBPW-379

Identifier

23-CPHD-ITBPW-379
Arlington County

Customer / Agency

Arlington County

Attachments (12)

unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Title: 23-CPHD-ITBPW-379 11th Street Park Improvements Deadline: 12/5/2022 2:00 PM (UTC-05:00) Eastern Time (US & Canada) Status: Open Solicitation Number: 23-CPHD-ITBPW-379 Description: For the provision of all material, labor and resources for park renovation at 11th street Park Pre-Bid Meeting Date: 11/16/2022 9:00 AM Pre-Bid Meeting Details: A virtual prebid conference will be held at 9:00 a.m. on Wednesday, November 16, 2022, on Microsoft Teams to allow potential Bidders an opportunity to obtain clarification of the specifications and requirements of the solicitation. To join the meeting, please click the following link in the solicitation, or join by dialing +1 347-973-6905 and enter Conference ID 546728036#. ATTENDANCE AT THE PREBID CONFERENCE IS OPTIONAL. Problem Occurred × Please retry Ok Confirmation × Are you sure you want to remove line item? Yes No Missing Information × Ok Confirmation × Are you sure you want to remove attachment? Yes No Documents: Documents as of
11/23/2022 Attachment C - Virginia DOLI Wage Determination.pdf 23-CPHD-ITBPW-379 Addendum 1.pdf 23-CPHD-ITBPW-379 Addendum 2.pdf Revised Attachment A v2 - Project Manual & Specifications.pdf Revised Attachment B - Construction Drawings & Plans.pdf L-03 Landscape Conservation Plan.pdf Revised 23-CPHD-ITBPW-379.pdf 23-CPHD-ITBPW-379 Addendum 3.pdf Prebid Conference Sign In Sheet - 23-CPHD-ITBPW-379 11th Street Park Improvements.txt.xlsx All Questions Question 1 Posted: 11/4/2022 Question: Detail 1/L-08 provides some quarries which presumably the seeding aggregate must be procured from for the exposed aggregate sidewalks. The manufacturer listed (Fletcher Granite – 978-320-4129) stated they don’t provide aggregate in 1⁄2-3/4” sizing. Please clarify what aggregate should be used for the seeding on the exposed aggregate finish Response: Please see addendum 2 Question 2 Posted: 11/16/2022 Question: Will the pre-bid attendance roll be posted? Response: Please refer to Addendum #3 Question 3 Posted: 11/18/2022 Question: Sheet E-01 Detail 5 calls for (2) 4” ducts to be installed from the utility pole to the utility meter. Detail 2 on same sheet calls for (2) 2” ducts to be installed. Please advise if we are too install (2) 2” since this is a 20a service. Response: Please refer to Addendum #3 Question 4 Posted: 11/18/2022 Question: Sheet E-01 Detail 7 is calling for a 24” pole base. The base of the fixture is going to be 8” in diameter. Please confirm if the 24” diameter pole base is correct. Response: Please refer to Addendum #3 Question 5 Posted: 11/18/2022 Question: Sheet E-01 Detail 7 is calling for the pole base to be flush with the ground. As this will be a grass area, the fixture would not have protection from lawnmowers. Please advise if pole base is to be flush as shown or revised and raised 4” above grade (to make the pole base 3’4” in total height). Response: Please refer to Addendum #3 Question 6 Posted: 11/18/2022 Question: Re: the electrical ductbank that needs to be installed under N. Danville Street, would the road closure be for an entire day and reopened at the end of each day? Or can the road be permitted closed for 3 days? Response: Please refer to Addendum #3 Question 7 Posted: 11/18/2022 Question: Please provide a quantity for how many bike racks are required as none are shown on the site plan. Response: Please refer to Addendum #3 Question 8 Posted: 11/18/2022 Question: Does Detail E/L-02 apply for the entire new sidewalk? If not, please clarify where this detail is applicable. Please also clarify where detail 1/L-08 is applicable for the new sidewalk. Response: Please refer to Addendum #3 Question 9 Posted: 11/18/2022 Question: Please provide basis of design for root aeration geo-composite matting shown on detail E/L-02. Response: Please refer to Addendum #3 Question 10 Posted: 11/18/2022 Question: Please provide a detail for brick paver and curb/gutter reinstallation. Response: Please refer to Addendum #3 Question 11 Posted: 11/18/2022 Question: Who is responsible for obtaining and paying for the permit for this project? Response: Please refer to Addendum #3 Posted: 11/4/2022 Question: Detail 1/L-08 provides some quarries which presumably the seeding aggregate must be procured from for the exposed aggregate sidewalks. The manufacturer listed (Fletcher Granite – 978-320-4129) stated they don’t provide aggregate in 1⁄2-3/4” sizing. Please clarify what aggregate should be used for the seeding on the exposed aggregate finish Response: Please see addendum 2 Posted: 11/16/2022 Question: Will the pre-bid attendance roll be posted? Response: Please refer to Addendum #3 Posted: 11/18/2022 Question: Sheet E-01 Detail 5 calls for (2) 4” ducts to be installed from the utility pole to the utility meter. Detail 2 on same sheet calls for (2) 2” ducts to be installed. Please advise if we are too install (2) 2” since this is a 20a service. Response: Please refer to Addendum #3 Posted: 11/18/2022 Question: Sheet E-01 Detail 7 is calling for a 24” pole base. The base of the fixture is going to be 8” in diameter. Please confirm if the 24” diameter pole base is correct. Response: Please refer to Addendum #3 Posted: 11/18/2022 Question: Sheet E-01 Detail 7 is calling for the pole base to be flush with the ground. As this will be a grass area, the fixture would not have protection from lawnmowers. Please advise if pole base is to be flush as shown or revised and raised 4” above grade (to make the pole base 3’4” in total height). Response: Please refer to Addendum #3 Posted: 11/18/2022 Question: Re: the electrical ductbank that needs to be installed under N. Danville Street, would the road closure be for an entire day and reopened at the end of each day? Or can the road be permitted closed for 3 days? Response: Please refer to Addendum #3 Posted: 11/18/2022 Question: Please provide a quantity for how many bike racks are required as none are shown on the site plan. Response: Please refer to Addendum #3 Posted: 11/18/2022 Question: Does Detail E/L-02 apply for the entire new sidewalk? If not, please clarify where this detail is applicable. Please also clarify where detail 1/L-08 is applicable for the new sidewalk. Response: Please refer to Addendum #3 Posted: 11/18/2022 Question: Please provide basis of design for root aeration geo-composite matting shown on detail E/L-02. Response: Please refer to Addendum #3 Posted: 11/18/2022 Question: Please provide a detail for brick paver and curb/gutter reinstallation. Response: Please refer to Addendum #3 Posted: 11/18/2022 Question: Who is responsible for obtaining and paying for the permit for this project? Response: Please refer to Addendum #3

2100 Clarendon Blvd. Arlington, VA 22201Location

Address: 2100 Clarendon Blvd. Arlington, VA 22201

Country : United StatesState : Virginia

You may also like

2024 Rennebohm Park East Tennis Courts

Due: 25 Apr, 2024 (in 5 days)Agency: City of Madison

240262 Knollwood Drive Street Improvements

Due: 02 May, 2024 (in 12 days)Agency: LHB Inc

Beatrice 33rd Street & Lincoln Street Improvements

Due: 23 Apr, 2024 (in 3 days)Agency: City of Beatrice

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.