USCG Station FT. Lauderdale Replace Electrical Panel

expired opportunity(Expired)
From: Federal Government(Federal)
30315PR240000008

Basic Details

started - 14 Mar, 2024 (1 month ago)

Start Date

14 Mar, 2024 (1 month ago)
due - 01 Apr, 2024 (1 month ago)

Due Date

01 Apr, 2024 (1 month ago)
Bid Notification

Type

Bid Notification
30315PR240000008

Identifier

30315PR240000008
HOMELAND SECURITY, DEPARTMENT OF

Customer / Agency

HOMELAND SECURITY, DEPARTMENT OF (34474)US COAST GUARD (24547)BASE MIAMI(00028) (347)
[object Object]

SetAside

SBA(Total Small Business Set-Aside (FAR 19.5))

Attachments (2)

unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

This combined synopsis/solicitation for construction services prepared in accordance with the format in subpart 12.6 of the Federal Acquisition Regulation (FAR) as supplemented with additional information included in this notice. This synopsis/solicitation is being advertised as Small Business Set-Aside only. This announcement constitutes the only solicitation; no separate written solicitation will be issued.The solicitation number is 30315PR240000008. Applicable North American Industry Classification Standard (NAICS) codes are:238210 - Electrical Contractors and Other Wiring Installation ContractorsThis requirement is for a fixed price contract. The contract will be awarded using simplified acquisition procedures in accordance with FAR part 13 and part 15The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, Best Value.When submitting your proposals,
request a price breakdown of the following:a. Cost of materials and equipmentb. Cost of laborContract will be awarded to the vendor who can provide Best value which includes all labor, material, cost and equipment required within the SOW. Cost and Past Performance factors will also be considered when selecting the award.Anticipated award date: 10 business days after close of solicitation, OOA 15 APRIL 2024Quotes are to be received no later than close of business (3 p.m.) on 01 April 2024 and are to be sent via e-mail to angel.melendez@uscg.milQuotations sent via the US Postal Service or hand delivered should be sent to:Commanding Officer USCG Base Miami Beach (P&C) Attn: Angel Melendez909 SE 1st Ave, Room 512Miami, FL 33131.Telephone requests of quotes, will not be accepted, a formal notice of changes (if applicable) will be issued in SAM.GOV (www.SAM.gov).Wage determinations: FL20240197 02/02/2024SCOPE OF WORK:General RequirementsPART 1 – General: United States Coast Guard Station Fort Lauderdale is accepting proposals for qualified individuals or firms to execute the replacement of a 208V 3PH electrical panel. This replacement will involve removing the old breakers, switch gear, and panelboard. All breakers, 76”x 42” panelboard, and switch gear will be replaced. This is a 1000A electrical service panel. Wiring will not be replaced. All electrical work and safety will be done in accordance with the NEC,PART 2 – Location:U.S. Coast Guard Station Fort Lauderdale7000 N Ocean Drive Dani Beach, FL 33004PART 3 – Facility Operating Hours: The facility shall remain in operation throughout the service. Contractor access to the service site shall be limited to the following: 7:30am to 5:00pm, Monday through Friday, excluding holidays. Access to the site shall not be permitted on the weekends without prior approval from the Coast Guard (COR).PART 4 – Security Requirements 1. Contractor shall provide a list of names (including any subcontracted personnel) to the Coast Guard COR for access to the base. 2. All personnel shall present ID to the security personnel at the entrance to the base.PART 5 – Contractor Responsibilities: 1. Contractor will provide labor, materials, and equipment for installations. 2. Conduct proposed installations. 3. Remove demolition materials and clean up debris generated during repairs. 4. MKC Benjamin Gagnon and EM1 Akeem Garcia must be present during the final inspection.Proposed Installation: Ensure all safety protocols are being met. Properly secure power to panel. Remove all breakers and switch gear. Remove RELIAGEAR panel board. Install new panelboard and switch gear. Install breakers. Rewire breakers. Restore power to panel and ensure all breakers are working as their intended functions. All electrical work will be done in accordance with the NEC.PART 6– Cleanup: 1. Clean up job site when complete, ensure all tools, consumable cleaning items are disposed of and removed from premises. 2. The contractor shall not use Coast Guard dumpsters or any waste receptacles for disposal of debris.PART 7 – Final Inspection and Acceptance: 1. When the contractor has completed all the work, they shall notify the Coast Guard (COR) for a final inspection. If the work is accepted, the contractor shall submit to the Coast Guard (COR): • Contractor’s notice of completion • Contractor’s payment request.All questions and concerns in relation to project can be addressed to EM1 Akeem GarciaAkeem.e.garcia@uscg.mil phone: 702-908-1127OrMKC Benjamin Gagnon Benjamin.j.gagnon@uscg.mil Phone: 207-752-6459Invoices can be emailed to: Akeem.e.garcia@uscg.milU.S. Coast Guard Station Fort Lauderdale7000 N Ocean Drive Dania, FL 33004Office: (207) 752-6459Email: Akeem.E.Garcia@uscg.milPerformance Period: Performance of work is expected to commence NLT 10 days after award is made. Extension period must be approved by the Contracting Officer for any unforeseen delays.Site visit: It is highly recommended and encouraged that interested party’s contact EM1 Akeem Garcia for a site visit which will be held on Thursday March 21, 2024 at 10:00AM EST. For scheduling contact Mr. Garcia via email Akeem.e.garcia@uscg.milOr via phone at 702-908-1127 .**All Questions and Answers will not be accepted after 27 MAR 2024 at 10:00AM EST.APPLICABLE FAR CLAUSESFAR 52.213-4: 52.213-4 Terms and Conditions-Simplified Acquisitions (OtherThan Commercial Items).ATTACHED BY REFERENCE52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS52.236-2 DIFFERING SITE CONDITIONS (APRIL 1984)52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APRIL 1984)52.236-27 SITE VISIT (CONSTRUCTION) {FEB 1995)Work hours: Monday through Friday, 0730 – 1800 (7:30 am – 6 pm) No weekends or Holidays authorized.See attached applicable FAR Clauses by reference.Offerors may obtain full text version of these clauses electronically at: www.arnet.gov/farThe following Homeland Security Acquisition Regulations (HSAR) are incorporated as addenda to this solicitation: HSAR 3052.209-70 Prohibition on Contracts with Corporate Expatriates (Jun 2006); Contracting Officers Technical Representative (Dec 2003) (COTR) HSAR 3052.237-72. Copies of HSAR clauses may be obtained electronically at http://www.dhs.gov.Vendors providing an offer must be registered in SAM (System for Award Management) prior to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors SAM registration must be in an “ACTIVE” status prior to award.Vendors must ensure that the above listed NAICS codes are listed on their SAM registration to perform this type of service.

Dania ,
 FL  33004  USALocation

Place Of Performance : N/A

Country : United StatesState : FloridaCity : Dania Beach

Office Address : 100 MACARTHER CAUSEWAY MIAMI FL 33139 MIAMI , FL 33132 USA

Country : United StatesState : FloridaCity : Miami Beach

You may also like

REPLACE COOL TOWER PUMPS FOR USCG STATION LAKE WORTH INLET

Due: 05 Jun, 2024 (in 1 month)Agency: U.S. COAST GUARD

Classification

naicsCode 238210Electrical Contractors and Other Wiring Installation Contractors
pscCode N059Installation of Equipment: Electrical and Electronic Equipment Components