Repair Aqueous Film Forming Foam (AFFF) Pond

expired opportunity(Expired)
From: Federal Government(Federal)
FA3099-18-R-0007

Basic Details

started - 23 Apr, 2018 (about 6 years ago)

Start Date

23 Apr, 2018 (about 6 years ago)
due - 21 May, 2018 (about 6 years ago)

Due Date

21 May, 2018 (about 6 years ago)
Bid Notification

Type

Bid Notification
FA3099-18-R-0007

Identifier

FA3099-18-R-0007
Department of the Air Force

Customer / Agency

DEPT OF DEFENSE (708895)DEPT OF THE AIR FORCE (60450)AETC (6448)FA3099 47 CONF CC (246)
[object Object]

SetAside

SBA(Total Small Business Set-Aside (FAR 19.5))

Attachments (8)

unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

SCOPE OF WORKThis project includes, but is not limited to, the Construction or Reconstruction of the Aqueous Film Forming Foam (AFFF) Pond. Consisting of excavation, demolition of existing concrete footings, chain link fencing, and removal of all vegetation. The Contractor shall furnish all labor, materials, equipment, tools, transportation and supplies, and perform all work required according to the drawings and specifications of the contract. The North American Industry Classification System (NAICS) code for this acquisition is 238190. All responsible sources may submit a proposal which shall be considered. The Government anticipates award of a firm-fixed price contract as a result of the solicitation. All prospective offerors must be registered in the System for Award Management (SAM) to award. Registration may be accomplished at website, https://www.sam.gov.PROJECT LOCATIONThe project work area is located next to building 508 at Laughlin AFB, Texas.APPLICABLE SPECIFICATIONSThe project shall conform to all applicable Federal, State and local laws, regulations and base-specific standards and applicable Unified Facilities Criteria (UFC). Where there is a conflict between the referenced standards, the most stringent shall take precedence. All work accomplished by the Contractor shall comply with these criteria unless a waiver is obtained from the Laughlin AFB when conditions warrant such consideration.ESTIMATED PROJECT COMMENCEMENT DATEAugust 6, 2018ESTIMATED DAYS FOR CONSTRUCTIONConstruction period of performance for this work project shall be 60 calendar days.TECHNICAL POINT OF CONTACTLt Karson ArteroSITE INVESTIGATIONContractor(s) will have access to the site prior to proposal. Designated date is

Laughlin AFB Laughlin , Texas 78843 United StatesLocation

Place Of Performance : Laughlin AFB

Country : United States

Classification

238 -- Specialty Trade Contractors/238190 -- Other Foundation, Structure, and Building Exterior Contractors
naicsCode 238190Other Foundation, Structure, and Building Exterior Contractors
pscCode 38CONSTRUCT/MINE/EXCAVATE/HIGHWY EQPT