The contractor shall furnish all labor, supervision, tools, equipment, transportation, material and incidentals necessary for each type offencing. The contractor is responsible for providing the two types of fencing as well as delivery and haul away.a. 4’ Bicycle Fence -- contractor shall provide all materials required to construct a continuous5,600 linear feet fence.b. 6’ Chain Link Fence -- contractor shall provide all materials (including post clamps, base stanchions, and additional panels to allowwind reinforcement) to construct a continuous 3,300 linear feet fence. The stanchions shall be made of a material that will not createforeign object debris that may damage aircraft. Examples of unacceptable stanchions are concrete and sandbags.c. 6’ Chain Link PRIVACY FABRIC Fence -- Contractor shall provide all materials (including post clamps, basestanchions, and additional panels to allow wind reinforcement) toconstruct a continuous 180 linear foot fence. The stanchions shall be made of a material that will not create foreignobject debris that may damage aircraft. Examples of unacceptable stanchions are concrete and sandbags.d. Crowd Control Stanchions -- Contractor shall provide 42 crowd control stanchions. No rope is
Location
Place Of Performance : N/A
Country : United StatesState : CaliforniaCity : Marysville