Engineering and Environmental Studies and Design Support Relating to I-580/Richmond Parkway Operational Improvements - Request for Qualifications (RFQ)

expired opportunity(Expired)
From: Metropolitan Transportation Commission(Transportation)
DPD-RFQ-26840

Basic Details

started - 21 Feb, 2024 (2 months ago)

Start Date

21 Feb, 2024 (2 months ago)
due - 20 Mar, 2024 (1 month ago)

Due Date

20 Mar, 2024 (1 month ago)
Bid Notification

Type

Bid Notification
DPD-RFQ-26840

Identifier

DPD-RFQ-26840
Metropolitan Transportation Commission

Customer / Agency

Metropolitan Transportation Commission
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Project: Engineering and Environmental Studies and Design Support Relating to I-580/Richmond Parkway Operational Improvements - Request for Qualifications (RFQ) Ref. #: DPD-RFQ-26840 Type: RFSQ Status: Open Open Date: Feb 21st 2024, 12:30 PM PST Questions Due Date: Mar 6th 2024, 4:00 PM PST Contact Information: Mey Phu, Mey Phu, mphu@bayareametro.gov Close Date: Mar 20th 2024, 4:00 PM PDT Days Left: < 1 Project Description:The Bay Area Toll Authority (BATA) invites your firm to submit a Statement of Qualification (SOQ) for performing engineering and environmental studies and design support relating to the I-580/Richmond Parkway Interchange Operational Improvements project. Richmond Parkway is a 7-mile, 4-lane arterial road connecting to Interstate 580 in the south and to Interstate 80 in the north, allowing regional traffic to bypass central Richmond. It has been identified as a route of regional significance by the West
Contra Costa County Transportation Advisory Committee (WCCTAC) due to being an important connector for traffic traveling between the two interstates. About 1.5 miles north of the Richmond Parkway/ I-580 junction, Richmond Parkway intersects with the Castro Street undercrossing and connects through a local interchange. Castro Street runs in parallel with Richmond Parkway for approximately 1.5 mile before connecting to the Richmond Parkway/Canal Boulevard/I-580 interchange. Based upon field observations in late Spring 2018, there is severe congestion at the Castro Street and Richmond Parkway interchanges during the morning commute hours as vehicles try to access westbound I-580. Traffic backs up in the southbound direction on Castro Street with long queues in the left-hand turn lane waiting to get on the loop on-ramp to westbound I-580. The queue typically extends as far back as the Old Castro Street intersection, approximately 1,800 feet with a maximum observed queue length of 5,000 feet. The Bay Area Toll Authority has conducted the Richmond Parkway Interchange Design Alternatives Assessment (DAA) to evaluate alternatives to improve traffic operations through this corridor. To advance this project forward, BATA is seeking via this RFQ a consultant to perform preliminary engineering and environmental studies to support project approval documents, complete final design, and provide design support during construction. Important Events:OngoingOpen DateOnline PortalPosting date for the OpportunityFeb 21st 2024, 12:30 PM PSTN/AUpcomingClose DateOnline PortalDeadline for SubmissionsMar 20th 2024, 4:00 PM PDTN/APassedQuestions Due DateOnline PortalDeadline to submit QuestionsMar 6th 2024, 4:00 PM PSTN/A Supporting Documentation:580 ORT FINAL DAA-2023-03-27.pdfOtherDesign Alternatives AssessmentJul 24th 2023, 1:38 PM PDT - Appendix B - Exhibit 10-H2 Cost Proposal.docxDocumentationAppendix B - Exhibit 10-H2 Cost Proposal - Word FormatRead more...Mar 12th 2024, 3:08 PM PDT - Appendix D - BATA Standard Consultant Contract.pdfDocumentationAppendix D - BATA Standard Consultant ContractFeb 25th 2024, 11:10 PM PST - Notice of Upcoming Opportunity - Richmond Parkway Interchange Opertional Improvements.pdfDocumentationNotice of Upcoming OpportunityJul 5th 2023, 4:57 PM PDT - Questions and Answers - I-580 Richmond Parkway Operational Improvement.pdfOtherQuestions and Answers - Engineering and Environmental Studies and Design Support Relating to I-580/Richmond Parkway Operational ImprovementsRead more...Mar 13th 2024, 3:56 PM PDT - RFQ - Engineering and Environmental Studies & Design Support - I-580 Richmond Parkway.pdfDocumentationRequest for Qualifications - Engineering and Environmental Studies & Design Support Relating to I-580/Richmond Parkway Operational Improvements.Read more...Feb 21st 2024, 12:23 PM PST - RSRF Richmond Pkwy-PreSubmittal Conference Slides.pdfOtherPre-Submittal Conference SlidesMar 12th 2024, 3:00 PM PDT - Supporting Documentation: Search FileTypeDescriptionDate CreatedActions580 ORT FINAL DAA-2023-03-27.pdfOtherDesign Alternatives AssessmentJul 24th 2023, 1:38 PM PDT - Appendix B - Exhibit 10-H2 Cost Proposal.docxDocumentationAppendix B - Exhibit 10-H2 Cost Proposal - Word FormatRead more...Mar 12th 2024, 3:08 PM PDT - Appendix D - BATA Standard Consultant Contract.pdfDocumentationAppendix D - BATA Standard Consultant ContractFeb 25th 2024, 11:10 PM PST - Notice of Upcoming Opportunity - Richmond Parkway Interchange Opertional Improvements.pdfDocumentationNotice of Upcoming OpportunityJul 5th 2023, 4:57 PM PDT - Questions and Answers - I-580 Richmond Parkway Operational Improvement.pdfOtherQuestions and Answers - Engineering and Environmental Studies and Design Support Relating to I-580/Richmond Parkway Operational ImprovementsRead more...Mar 13th 2024, 3:56 PM PDT - RFQ - Engineering and Environmental Studies & Design Support - I-580 Richmond Parkway.pdfDocumentationRequest for Qualifications - Engineering and Environmental Studies & Design Support Relating to I-580/Richmond Parkway Operational Improvements.Read more...Feb 21st 2024, 12:23 PM PST - RSRF Richmond Pkwy-PreSubmittal Conference Slides.pdfOtherPre-Submittal Conference SlidesMar 12th 2024, 3:00 PM PDT - Note To download files, Log in or Register for a Bonfire Account.

Bay Area Metro Center 375 Beale Street, Suite 800 San Francisco, CA 94105-2066Location

Address: Bay Area Metro Center 375 Beale Street, Suite 800 San Francisco, CA 94105-2066

Country : United StatesState : California

You may also like

ENVIRONMENTAL&ENGINEERING SERVICES FOR NEMETZ HOUSING, KODIAK

Due: 18 Dec, 2028 (in about 4 years)Agency: U.S. COAST GUARD

BCS 2022-04 F Comprehensive Environmental & Engineering Services, Statewide

Due: 24 Oct, 2028 (in about 4 years)Agency: State Highway Administration

BCS 2022-04 D Comprehensive Environmental & Engineering Services, Statewide Amendment #1

Due: 07 Nov, 2028 (in about 4 years)Agency: State Highway Administration

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.