Agency City of Dunedin Bid Type Invitation to Bid Bid Number ITB-13-988-0-2013/CA Fiscal Year 2013 Bid Writer Chuck Ankney Bid Name ROWTP Caustic Bulk Storage Tank Replacement Bid Status Rejected Bid Status Text None Due Date/Time 1/8/2013 2:00 PM Eastern Broadcast Date 11/30/2012 Bid Bond 5% Project Estimated Budget $125,000.00 Plan (blueprint) Distribution Options Agency distributing plans Distribution Method Download and Mail Distributed By Onvia DemandStar Distribution Notes None Scope of Work Two existing chemical bulk storage tanks at the City's water treatment plant are to be removed and replaced with one 6,200 gallon, type 304 stainless steel bulk storage tank for sodium hydroxide (50% concentration). Replacement tank is to be complete with interior epoxy lining, exterior insulation, tank heater, and continuous level measurement system. Elevated walkway and railing above tank is to be removed and reinstalled after new tank is in place. Existing chemical piping and electrical power are to be disconnected from existing tanks and reconnected to heater and instrumentation of new tank. E-Bidding