Installation of LENEL system

expired opportunity(Expired)
From: Federal Government(Federal)
HDTRA223OI

Basic Details

started - 29 Sep, 2022 (18 months ago)

Start Date

29 Sep, 2022 (18 months ago)
due - 15 Oct, 2022 (18 months ago)

Due Date

15 Oct, 2022 (18 months ago)
Bid Notification

Type

Bid Notification
HDTRA223OI

Identifier

HDTRA223OI
DEPT OF DEFENSE

Customer / Agency

DEPT OF DEFENSE (705756)DEFENSE THREAT REDUCTION AGENCY (DTRA) (542)DEFENSE THREAT REDUCTION AGENCY (542)
[object Object]

SetAside

SBA(Total Small Business Set-Aside (FAR 19.5))
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

NOTICE:  This is a sources sought, not a request for proposal or invitation for bid.  This notice does not obligate the Government to award a contract or otherwise pay for the information submitted in this request.The Security and Counterintelligence Office, Defense Threat Reduction Agency (DTRA), Kirtland AFB (KAFB) NM is upgrading the currently utilized LENEL access system. The current LENEL access system utilized by DTRA Albuquerque does not include three buildings (Bldgs 20451, 20423, and 37541.) This project will extend the overarching LENEL system to include these three locations.DTRA is looking to acquire the services of a certified LENEL Value Added Re-Seller (VAR) to complete the installation for the LENEL upgrade.Description of Work:1. The Contractor shall conduct a construction Design Phase Plan to be included in the construction Security Plan, identifying areas where the LENEL access system will be installed and verify existing construction site conditions and obtain all
required construction site measurements. Specifics for each building include:a. BLDG 20451: Determine the viability of existing doors, door jambs, gates and other areas for installation of 6 interior doors, 4 exterior doors, 2 pedestrian gates, 1 vehicle gate; and related conduit, wiring, and associated hardware;b. BLDG 20423: Determine the viability of existing doors, door jambs, gates and other areas for installation of 2 interior doors, 4 exterior doors, 1 pedestrian gate, 1 vehicle gate; and related conduit, wiring, and associated hardware;c. BLDG 37541: Determine the viability of existing doors, door jambs, gates and other areas for installation of 2 interior doors, 1 exterior doors, and related conduit, wiring, and associated hardware.2. The contractor shall use and retain the experience of trained certified LENEL installers and technicians to complete the work.3. The contractor shall use U.S. citizens to complete the work.4. The Contractor shall conduct a review the parts/material for this installation currently on hand to determine if any additional items are need. DTRA has previously purchased LENEL material to complete this upgrade.5. The Contractor shall perform comprehensive testing of functionality of equipment pre-purchased for the installation and identify and list deficiencies at the time of the test and inspection that may impact equipment and system performance.6. The Contractor shall be responsible for all additional requirements for this project including conduit, wiring, and any additional items required to complete the installation.7. The Contractor shall accomplish all work in accordance with the manufacturer’s published specifications and installation instructions and design specification.8. The Contractor shall provide the required Construction Project Work As-Built Drawings prior to terminating the Contract and prior to leaving the Construction Project Job Site.9. The Contractor shall updated the System Security Plan (SSP) for the DTRA Albuquerque Badging System (DABS)10. The Contractor shall obtain all required permits prior to starting construction project work and shall provide all permits to the Army Corps of Engineers (USACE) and Defense Threat ReductionAgency (DTRA) to include; Environmental, National Emission Standards for Hazardous Air Pollutants (NESHAP), Digging, Burn, etc.11. The Contractor shall accomplish project work in accordance with the minimum requirements found in the USACE Specification Guide, Federal and Local Building Codes. The Contractor shall provide testing and service documentation demonstrating compliance with requirements.12. The contractor shall include a warranty against all defects in material workmanship. All work shall be inspected and accepted by the KAFB. The work area shall be inspected for workmanship, completeness, and cleanliness. The Contractor shall be responsible to ensure all items meet code requirements. All work shall meet professional commercial standards. All applicable permits will be obtained.Material on Hand:1. 3 x C9300-24U-A, CATALYST 9300 24PT UPOE2. 1 x LNL-1100-S3, Input Control Module (Series three)3. 340 x 277-2027-ND, CONN Grey Term Feed4. 34 x 277-2038-ND, CONN Term Blk End Cover Gray5. 17 x 277-2293-ND, Din Rail 35mm x 7.5mm Slotted 2m6. 51 x 277-3241-ND, Conn Black Term Blk Feed Thru7. 34 x 277-3243-ND, Conn Red Term Blk Feed Thru8. 3 x C9300-DNA-A-24-3Y, DNA Advantage, 24-port, 3yr Term9. 4 x C3560CX-DNA-A-8-3, C3560CX DNA Advantage 48-Port 3 yr Term10. 3 x C9300-DNA-A-48, DNA Advantage 48-port 3 yr Term11. 1 x FPO150-B100, PreWired Mercury, 8DR NET E6M12. 7 x PWR-C1-1100WAC-P, 1100W AC 80+Platinum Config 1P/S13. 1 x PRO-64RUP-64, Access Readers upgrade for Pro Systems14. 2 x SWC-ADV, Onguard ADV Client Software License15. 7 x c9300NM8X, Cisco 8 x 10GE Network Module16. 3 x CAB-SPWR-30CM, Catalyst 3750X Stack PWr CBL 3017. 3 x STACK-T1-50CM, 50 CM Type 1 Stacking CBL18. 6 x PWR-C1-1100WAC-P/2, 1100 W AC 80+PlatinumConfig P/S19. 9 x LNL-1320-S3, Dual Reader Interface Module20. 8 x LNL-X2220, Intelligent Dual Reader Controller21. 10 x LNL-X4420, Intelligence Dual Readers Controller22. 1 x FPO150/250-3D8P2M8NL4E8M2, PreWired Mercury, 16DR NET E8M223. 8 x 12V 40ah, 12 V 40ah Battery24. 10 x 909-MO, 909-MO Rocker Switch25. 30 x HSS-1620, HSS Z-Bracket Kit26. 17 x HSS-L2D-000, HSS-L2D Dual Alarm, Surface Mount Contact27. 10 x HSS-SPO62, Spacers HSS L2S/L2d Seer 128. 3 x EN400, Heavy Duty Outdoor Electric Strike29. 4 x M62, M62 Magnalock-12/24VDC30. 1 x IK, M62 Maglock Kit31. 9 x 1320-PWR, 16-2 OAS STR CMP (1000 ft per box)32. 9 x 4351-BMS-REX-PIR, BMS-REX-PIR 1000 ft per box33. 7 x 4352-RDR, OAS STR CMP Wht Jkt (1000 ft per box)34. 4 x C9300-48U-A, Catalyst 9300 48-port UPOE35. 4 x C3560CX-8PCS, Catalyst 3560-CX 8 Port PoE IP Base TAA36. 30 x GLC-SX-MMD++=, 1000BASE-SX SFP transceiver module37. 16 x GLC-LH-SMD ++=, M62 Magnalock-12/24VDCLocation of Work: The construction sites are located on KAFB NM.Applicable NAICs Codes: 541512, 561621, 238210, 423610Response Requirements: In response to this Source Sought publication, provide a Capability Statement package with a limit of 15 pages. Submissions should include pertinent information demonstrating your company’s capabilities to independently accomplish the specific work described above. In addition, include a list of any similar projects completed in the last 5 years. Provide references or points of contact (POC) information related to recent associated projects.Include a detailed description/list of key personnel that would be assigned to manage projects for this type of work. For each individual, include details related to Professional Licensing and/or certifications.Other information can include general company data, current/potential business partnerships, core competencies, differentiators (unique capabilities), and POC information.

Kirtland AFB ,
 NM  87117  USALocation

Place Of Performance : N/A

Country : United StatesState : New MexicoCity : Albuquerque

You may also like

LENEL SYSTEM MAINTENANCE SUPPORT CONTRACT

Due: 30 Sep, 2025 (in 17 months)Agency: OFFICE OF THE SECRETARY

CCTV PURCHASE & INSTALLATION FOR FAIRFIELD, CA POD

Due: 21 Aug, 2024 (in 4 months)Agency: INTERNAL REVENUE SERVICE

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.

Classification

naicsCode 561621Security Systems Services (except Locksmiths)
pscCode J063