Calcasieu River Saltwater Barrier (CRSWB) New Shops BuildingThe CRSWB New Shops Building project will involve: demolition of an existing 30-foot by 40-foot pre-engineered metal building (PEMB) down to the top of concrete slab; demolition of chain link fencing and rolling security gate; installation of steel pipe piles; installation of cast-in-place concrete pile caps, slab and beam foundation, slab and beam ramps; installation of steel stair and c.i.p. concrete housekeeping slab; installation of a new 30-foot by 40-foot PEMB with 19-foot eave height, (2) 12-foot by 12-foot overhead coiling doors, and a 5-ton bridge crane.The project also includes mechanical ventilation, interior and exterior lighting, lightning protection, installation of a 1/2” water line extension, installation of chain link fence with rolling and personnel gates, and seeding/mulching.Please see